PLANT DEPARTMENT
EQUIPMENT NUMBER
INSPECTION REPORT
FORKLIFT/TELESCOPIC HANDLER PROJECT
MAKE MODEL INSPECTED BY DATE OF INSPECTION
CONDITION (ü = Satisfactory X = Repair O = Replace) ˜ = Work done
ITEM COMPONENTS ü X O ˜ ITEM COMPONENTS ü X O ˜
01 UNDERFRAME/CHASSIS SAFETY GUARDS 21 BACK-UP ALARM
02 ENGINE 22 MAST & BEARING
03 COOLING SYSTEM 23 MAST LIFT SYSTEM
04 AIR INTAKE/EXHAUST SYSTEM 24 MAST TILT SYSTEM
05 FUEL SYSTEM 25 CARRIAGE & PINS
06 LUBRICANT SYSTEM 26 FORK
07 ELECTRICAL SYSTEM 27 SIDE SHIFTING MECHANISM
08 COVERTER/CLUTCH/COUPLING 28 WEAR PADS
09 TRANSMISSION/GEAR BOX TELESCOPIC HANDLER
10 TRANSMISSION OIL COOLING SYSTEM 29 BOOM
11 DIFFERETIAL/FINAL DRIVE/TRUNION 30 BOOM LIFTING SYSTEM
12 DRIVE SHAFTS/U-JOINTS 31 BOOM EXTENSION SYSTEM
13 SUSPENSSION 32 HYDRAULIC CYLINDERS
14 UPPER FRAME/BODY 33
15 TYRES 34
16 STEERING 35
17 BRAKES 36
18 CAB/CONTROLS/GAUGES/HORN 37
19 PTO & HYDRAULIC PUMP 38
20 SEAT & SEAT BELT 39
FR RR
TYRES CONDITION
HOURMETER READING
(% OF NEW)
FL RL
TECHNICAL CONDITION SAFETY & FIRE EXTINGUISHER STANDARD OF CLEANLINESS &
MAINTENANCE GENERAL .CONDITION
MAJOR REPAIRS NECESSARY MAJOR SPARE PARTS REQUIRED
REF QTY
(BRIEF DETAILS OF DEFECT) (PART NUMBER & DESCRIPTION )
PLANT ENGINEER/FOREMAN PLANT MANAGER FOR PLANT ADMIN. USE
NAME: NAME:
SIGNATURE SIGNATURE
F.PD.04.08.R0
F.PD.04.08.R0