Electrical Driven Compressor
c/w After Cooler Checklist
Owner: Hyprops Nig, Ltd Form
Supplier: Atlas Copco Asset No: AP1865659L
Air Discharge Pressure: 10 Bar Vessel Pressure:0- 100 BAR
Client: Hyprops Nig, Ltd Date (Pre-Mob):
Working pressure:10 BAR Function Test: 30min minimum
Actual Time:
Next Inspection Due: Engineer: Godspower O
No. Engine Check Comment No. Shutdowns Check Comments
1 oil level ok 29 High Coolant Temperature ok
Probe Check
2 Air Filter ok 30 Normal Stop Button Check O ok
3 Condition of pipe work ok 31 Over-speed
air/oil & fuel lines Shutdown/Charlwin Valve
4 Exhaust system & Spark n/a 32 Emergency Stop Button Check ok
Arrestor
5 Anti-Freeze Coolant % & n/a 33 Engine Oil Pressure Shutdown Check ok
Level
6 Fan Belts check ok 34 110V/24V Shutdown if fitted Check 4000v
condition & tension.
7 Guards Fitted & Secure ok 35 Air Compressor
8 Air/Battery Starter n/a 36 Compressor Oil level ok
Terminals
9 Engine Oil Pressure n/a 37 Drain Condensate check ok
30 PRV (if fitted) Check Check Ok
10 Engine Temperature calibration certification in
manual (if more than 1 state
which one used in function
test).
11 RPM idle 31 Condition of Air Receiver (if Check Ok
fitted) and pipework
12 RPM Max Load Full Load Checks
13 Engine Throttle, check 32 Run unit up to stabilised check
for smooth operation n/a working temperature, the do ok
from offload to full load. checks as below
14 Check fuel pressure if 33 Check engine coolant Check ok
gauge fitted n/a temperature.
Normal values 85-90 deg C
15 Check service manual 34 Check air end oil temperature, check ok
when fuel filters were last Normal values 85-100 deg C
changed. should be with
in last 150 hrs
16 Air Starter Solenoid if n/a
Page 1 of 2
Electrical Driven Compressor
c/w After Cooler Checklist
Owner: Hyprops Nig, Ltd Form
fitted.
17 Check Filter/Lubricator/ 36 Open discharge enough to YES
Regulator (Kilfrost) ok maintain maximum pressure,
check for any oil carry over.
Accessories
19 Control panel OK
gauges/controls
20 Air outlet ball valve ok
operation
ok 39 All Hoses including spare hoses ok
21 Check correct outlet have been visually inspected.
fittings
Crowfoot/McDonald/ ok 40 All Function Tested ok
Weco, clean & greased.
Container/Lifting Frame 41 Manual & Instructions Complete ok
42 Check pressure reducing valve ok
22 Slings Quad & Shackles operation, check for spare
repair kit
ok 43 Check all hose ends are clean, ok
23 Paintwork/Damage greased & free from visual
damage
24 Hinges & Door Locking Other Comments: Inspected and function tested ok.
Repairs
needed
25 Fork Pockets, check for ok
Debris.
26 Earth Points ok
Signature:
Date:19/December/2022