0% found this document useful (0 votes)
22 views2 pages

Sub of DBR

Uploaded by

ankur tyagi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views2 pages

Sub of DBR

Uploaded by

ankur tyagi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

DRILLCON INFRASTRUCTURE PVT. LTD.

Corporate office: Survey No.192, Botanical Garden Road, Masjidbanda, Kondapur, Hyderabad – 500084, Telangana
Tele: 040-40045539, 040-40250029
______________________________________________________________________________________________

Letter No.: Site/DIPL/RVNL/2023-24/48 Date: 09 March 2024

To,

The GM, Projects-3


Rail Vikas Nigam Limited
1st Floor, August Kranti Bhawan,
Bhikaji Cama Place, R.K. Puram,
New Delhi – 11066

Subject: Submission of Revised DESIGN BASIS REPORT (NATM TUNNELS).

Name of Work: C-4: Composite Contract package in connection with New BG Railway Line of
HORC project including Design & Construction of Twin Tunnel using NATM from km 24.850 to
km 28.000 & Installation of Ballastless Track (excluding supply of rails) from km 24.843 to km
29.680, including Portal P1 and civil works of electrical services - Package-1.
Ref:
1. LOI No. RVNL/HORC/TNRD(MIS)/1/2023/CIVIL/RKSH/001A, dated 10-07-2023
2. CA No. RVNL/HORC/TNDR/C-4/PK-1/CA-01, dated 06.10.2023,

Dear Sir,
With reference to the subject cited above, we are submitting the Revised DESIGN BASIS REPORT
(NATM TUNNELS).

The submission includes the following documents:


1. Revised DESIGN BASIS REPORT (NATM TUNNELS),
2. COMMENT RESOLUTION SHEET (CRS) - HARYANA ORBITAL RAIL CORRIDOR PROJECT

Thanking you and assuring you our best services always.

For Authorized Signatory,

Drillcon Infrastructure Pvt. Ltd.

Enclosure:
Annexure1: Revised DESIGN BASIS REPORT (NATM TUNNELS),
Annexure2: COMMENT RESOLUTION SHEET (CRS) - HARYANA ORBITAL RAIL CORRIDOR
___________________
_
Regd. Office: 11, Pollock Street, Kolkata – 700001, West Bengal
Email – admin@drillconinfrastructure.com, drillcon@rediffmail.com, website: www.drillconinfrastructure.com
DRILLCON INFRASTRUCTURE PVT. LTD.
Corporate office: Survey No.192, Botanical Garden Road, Masjidbanda, Kondapur, Hyderabad – 500084, Telangana
Tele: 040-40045539, 040-40250029
______________________________________________________________________________________________
PROJECT.

___________________
_
Regd. Office: 11, Pollock Street, Kolkata – 700001, West Bengal
Email – admin@drillconinfrastructure.com, drillcon@rediffmail.com, website: www.drillconinfrastructure.com

You might also like