Proposal for
Commercial Solar Ground mount
           PV Plant
              For
    1 MW on-grid system
To,
Rakesh Agarwal
Classic convention
Executive Summary
Altisun solar offers end to end solar EPC solutions, grid-connected solar PV
systems, off-grid solar PV systems, solar power plants, ground mount solar PV
systems as well as integrated PV systems. Our experience of engineering and
installing high quality solar power systems and our uncompromising service is
what makes us a strong player. As a professional solar photovoltaic system
supplier, we monitor the project closely; provide on-time delivery, and
accountability throughout the life of the system.
Altisun solar is approaching Rakesh Agarwal with a proposal of installation and
commissioning of ground mount solar power plant system at their chittor campus.
Based on discussions and site survey, we are proposing a complete solution for
1MW solar PV system. The solution includes high-quality products, installation
and commissioning services and maintenance support
1 Project Highlights
Based on site survey and electricity usage analysis from electricity bill, it is
suggested to install 1MW of solar PV system on the ground mount of commercial
building campus of Rakesh Agarwal
Below is high-level detail of the project:
Client Name                         Rakesh Agarwal
Project Capacity                    1 MW
Project Type                        On-grid solar ground mount PV plant
Generation of energy                4.5-5 units per day per KW
Required Area / Floor space         Approx. 4.5 acre
Area to be installed                Ground mount
Location                            chittor
 2 System Design
Detailed system design will be done after carefully taking technical parameters into
consideration once the project is finalized; however, following is the list of proposed system
components and their specifications for the solar power plant:
       Item                      Description                      Make            Quantity
                        Poly Crystalline PV modules of
  Solar PV Module                  580 Wp                        Waaree/
                                                                                    1725
                          12 years product warranty             Vikram/
                                                                                   modules
                       30 years performance warranty            premier
                                 1MW Capacity
     On – grid                                                  POLYCAB /
                                                                GROWATT
                                Efficiency > 98%                                    1 No.
      Inverter                                                    / HUWAEI /
                        5 years manufacturer warranty             WAAREE
     Module
                             ISI approved GI Pipe
     Mounting                                                                         As
                         150 kmph wind load Capable                N.A.           Required
     Structure
                                                                                    As Per
                       IP 65 Junction box with required
       DCDB                                                 Industry Standard      Design
                            switch gear protection
                                                                                    As Per
                       IP 65 Junction box with required
       ACDB                                                 Industry Standard      Design
                            switch gear protection
                        ISI approved AC and DC cables
                      Cabling will be encapsulated in PVC       POLYCAB          As Required
   Wires / Cables
                                         pipes
    Earthing kit              Chemical Earthing’s           Industry Standard As per design
     Lightning                                                                      As per
                     Surge protection & lightning devices Industry Standard
      arrestor                                                                     design
3 Scope of Work
Feasibility Study:
   -   Altisun team shall survey the site and measure the available floor / roof
       space suitable for PV modules installation.
   -   The Electrical layout of the building site will be properly studied and also needed
       information will be checked.
   -   Application for approval of project to respective authorities
Design:
   -   SSPL team shall suitably design the system to optimize the system performance and
       Client’s investment.
   -   Basic civil structure and mounting structure will be designed.
Installation:
   -   Documents submission for registration of the plant and subsidy
   -   Installation of Mounting structures
   -   Installation of PV Modules on Mounting structures, cabling & wiring to connect
       Modules to Inverters, connection of inverters to Inter- connection point, connection
       of Inverters.
   -   Installation of protection devices like SPD, Lightning arrestors, etc
       wherever required.
   -   Termination of Inverter Connections at Distribution Panel
Commissioning:
   -   Test report preparation and submission
Training of Personnel:
   -   SSPL team will train the Personnel / team nominated by the Client for
       maintaining the Plant on day to day basis and to handle emergency situations.
Notes:
   -   Customer will appoint a single point of contact person for all tasks related to
       installation and commissioning of the project. Permission to the building ground
       mount, arranging necessary approvals at customer end, decisions about placing of
       equipments and any other help required will be his responsibility.
   -   Arranging the accessibility to the roof is customer’s responsibility.
   -   Any civil work required additionally other than mentioned in this proposal will
       be customer’s responsibility.
 4 Quotation
                    Installation and commissioning of solar ground mount solar plant
  Price per KW                                                                              38,000
  System Size (KW)                                                                        1000 KW
  Final System Cost                                                                    3,80,00,000
Payment Terms:
   • Price is inclusive of applicable taxes (12%)
   •   Transportation will be borne by the company.
   •   Payment schedule:
          o 25% Advance Upon award of Contract
          o 50 % against dispatch of material
          o 25% Complete the inspection (throughout power on grid)
   •   The Proposal is valid for 30 days from the date of issue
   •   Any charges levied by DISCOM, Electrical Inspector and Nodal Agencies will
       be borne by the customer as per Actual
   •   All cheques / DDs are to be in favor of “Altisun solar,
       payable at Hyderabad.
5 ROI Calculation
Below table provides an estimation of return of investment from the project:
Unit Generation Estimate
•     Daily solar generation for 1 MW – 4,500 units
•     Monthly solar generation for 1 MW – 1,35,000 units
•     Yearly solar generation for 1 MW – 1,62,000 units
Pay-Back Period
    o Approx. 5-6 years (will be shorter if CFA is availed) Notes:
    o The generation of power is dependent on the environment conditions.
      Day to day generation might vary.
 6 Project Schedule
Below figure gives an idea of the project schedule:
                                          •Project Approval from Nodal Agency/DISCOM
         Govt Approvals                   •Usually 2-3 weeks
        Project Design /                  •Accurate design of system based on site
                                          conditions
        Material Delivery                 •Initiate material movement and deliver to
                                          customer •3-4 weeks
                                          •Civil work, module mounting, wiring and earthing
           Installation                    if required
                                          •3-4 weeks
                                          •Test reports and CEI approval
         Commissioning                    •Net/Bi-directional meter installation by
                                          Discom •GEDA/MNRE Approval
Notes:
    •    SSPL requires all documents duly signed by customer in order to submit
         the applications respective authorities.
    •    The installation of project depends on the size of the project and
         availability of material.
    •    Inspections from CEI and installation of net/bidirectional meter from
         Discom is done by respective authorities. Hence SSPL does not guarantee
         the timelines for the same.
7 Terms and Conditions
 • All standard manufacturer warranties shall be transferred to the Client
 • Govt. Charges for registration of the project for the subsidy will be charged
   extra
 • SSPL shall raise Invoice to the Client as per registration of project.
 • Company works under corporate ethics “Beneath it All”. Please refer in case of
   any query.
 • Customer should not default in payment terms as per agreement,
   otherwise bank interest would be charged after credit period.
 • Delay in project execution due to customer or act of God will not be waived.
 • SPP contains electronics parts, to be operated in SOC (Standard Operating
     Conditions), defaulting such may result in withdrawal of warranty or termination
     of Service Contract.
 •   System Specifications may vary due to continuous development in Technology.
 •   8x6 technical support provided from Altisun solar
 8 Benefits of proposed solution
Some of the advantages of the proposed solar PV solution are as below:
   -   Reduce your electricity bill
   -   TAX Depreciation Benefits
   -   Its clean and green energy
   -   Minimal Operating cost
   -   Long term energy generation
   -   Reliable and safe
   -   Good amount of savings in electricity bills with net metering
   -   Tax Depreciation benefits from State & Central government
   -   Short term payback period
   -   Green Energy / Renewable energy
       Thank you for doing business with Altisun Solar Solutions
       Address:- Banjara Hills Road # 1 Hyderabad Telangana 500028