0% found this document useful (0 votes)
48 views1 page

Dry Mix

This document is a concrete order form from Shaanxi Construction Engineering Group Corporation for the DAMAC Lagoons project, specifically for Villa-18. The order includes a request for 10m³ of Dry Mix concrete with specific mix code and supply details, scheduled for delivery on 04/10/2024. It is prepared by Engg. Farhan Danish and approved by HongZhi Heng.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views1 page

Dry Mix

This document is a concrete order form from Shaanxi Construction Engineering Group Corporation for the DAMAC Lagoons project, specifically for Villa-18. The order includes a request for 10m³ of Dry Mix concrete with specific mix code and supply details, scheduled for delivery on 04/10/2024. It is prepared by Engg. Farhan Danish and approved by HongZhi Heng.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

TO,

SS LOOTAH READYMIX CONCRETE


P.O BOX 553, DUBAI

CONCRETE ORDER FORM


COMPANY: Shaanxi Construction Engineering Group Corporation

PROJECT: DAMAC Lagoons

LOCATION: ENG FARHAN ZONE

PROJECT: VENICE (VILLA-18)

Booking Date: 03/10/2024. Supply Date: 04/10/2024 (Friday)


TECHNICIAN CUBE
Structure PUMP TEMP
MIX MIX CODE QTY TIME INTERVAL REQUIRED MOULD
Ref. SIZE CONTROL
(Y/N) REQ.
Dry Mix C32/40- 10m³ Superstructure 8:00 AM No No No No No
OPC+50%GGBS+15KG
MS

Note: Booking must be submitted before 4pm.

PREPARED BY
ENGG. FARHAN DANISH

APPROVED BY
HongZhi Heng
Form: SSRM-F-MS-71, R:2, D:18-08-2016
Gvb5

You might also like