Date: 17.05.
2024                                                                           Quotation ID: 8000278197
Customer Details
Customer:         AAA CONCRETE FLOORS LLC
P.O. Box:         103557                                             Phone:         04-5519524
City:             DUBAI,UNITED ARAB EMIRATES U.A.E.                  Fax:
ATTN:             Mr. Shahzaib .                                      Email:
Jobsite Details
Jobsite:          Al Khail Avenue Mall                                Total Exp.    0.00 M3
                  Al Khail                                            Consultant:
Product Details and Pricing
Prices effective from:       01.05.2024
 Class           Description           Mix Grade       Cementitious Material   RCP         DIN   ISAT   W.A%   Price Delivered
                                                                                                                   Dhs./m3
   1       Screed with Fiber         C25/10            Vertua+GGBS+Fiber       *       *         *      *          245.00
SURCHARGES
    1. AGGREGATE ENVIRONMENTAL TARIFF: Dhs. 15/-per cubic meter
    2. ADDITIONAL AGGREGATES TOLL: Dhs. 12/-per cubic meter levied by Sharjah Government is applicable
    3. DRUM WASHING: Dhs. 2/-per cubic meter
    4. EMPLOYEE WELFARE: Dhs. 1/-per cubic meter
    Above charges are inclusive of concrete price
ADDITIONAL SERVICES
    TEMPERATURE      CONTROL
    5. 32 DEGREE:    Dhs. 15.00/-per   cubic   meter
    6. 30 DEGREE:    Dhs. 20.00/-per   cubic   meter
    7. 28 DEGREE:    Dhs. 25.00/-per   cubic   meter
    8. 26 DEGREE:    Dhs. 30.00/-per   cubic   meter
    PUMPING SERVICES
    9. 42 Meter Mobile pump: Dhs. 15.00/-per cubic meter.
    Minimum pump charge for pour up to 60 cubic meter: 1000 per pour
    10. 52 Meter Mobile pump: Dhs. 20.00/- per cubic meter.
    Minimum pump charge for pour up to 100 cubic meter:2000 per pour
    11. 56 Meter Mobile pump: Dhs. 25.00/- per cubic meter.
    Minimum pump charge for pour up to 100 cubic meter: 3000 per pour
    12. Molly pump Dhs. 15.00/- per cubic meter
    13. Minimum pump charge for pour up to 100 cubic meter: 1500 per pour
    14. Pipe Line charges Dhs.10/- per cubic meter
    15. SLURRY (GROUT MIX): Dhs. 300/-per cubic meter for priming grout, prior to each new pumping cycle.
    OTHER SERVICES
    16. CANCELLATION SERVICE: per cubic meter for same day cancellation on any order. In case of reduction of more
    than   of the confirmed order volume, the same cancellation service will be applicableto the reduced portion.
                                                                                                 Page 1 of 3
Date: 17.05.2024                                                                   Quotation ID: 8000278197
   17. SMALL LOAD: Dhs. 50/- per cubic meter for less than 7 cubic meter load.
   18. WAITING TIME: Dhs.120/- per hour in case of any delay after the allowable time of 1 hour after Truckmixer arrival
   at the site
   19. RETURN OF CONCRETE:
   Partial Return Concrete: Dhs.250/- per load
   Full Return Concrete: Dhs.550/- per load
   20. Use of redirected fresh concrete will comply with the project mix specification.
TERMS AND CONDITIONS
   21. LEGALITY OF THE DOCUMENT: In case of any discrepancy between the received Local Purchase Order (L.P.O.)
   and the content of this Document , the terms of this Document should prevail.
   22. TERMS OF SUPPLY: Written acceptance of this Document is required prior to submittal of technical data. Local
   Purchase Order (L.P.O.) required prior to supply.
   23. PRICES: The prices described in this Document are based on current raw material rates and subject to change.
   24. ACCESSIBILITY: It is the responsibility of the Contractor to ensure that there is suitable and safe (land based)
   access to site for trucks and pumps in accordance with best practices for health and safety.
   25. TAXES: Unless specified otherwise on the face of the quotation, the prices are exclusive of, and Customer shall
   be solely responsible for and pay, all state, and local taxes, including, but not limited to, value added tax, goods and
   services tax, sales, change of taxation laws or imposition of new taxes after the acceptance and/or during the
   performance of this quotation.
   26. ENERGY/FUEL: This will be zeroed at previous year's base level and will only be applied when/if new costs are
   incurred.
   27. VALIDITY OF THE QUOTATION: This Document is valid for 10 days from the above-mentioned date and
   supersedes any previous Quotation related to this subject matter.
   28. BOOKING OF PRODUCT: Booking for supply of the Product(s) must be made at least 1 working day(s) prior to the
   supply date.
   29. PAYMENT TERMS: To be discussed
QUALITY STANDARDS
   30. QUALITY I: The characteristics of the readymix concrete subject of the table above, are in accordance with the
   BS 8110/1985 and BSEN 206-1/2000 Standards.
   31. QUALITY II: CEMEX internal testing and quality control are carried out in accordance with CEMEX procedures
   based on the applicable standards and as per the ISO 9001 system.
   32. Note 1: All routine testing and tests carried out for initial approval shall be to the account of M/s.AAA CONCRETE
   FLOORS LLC.
For any further information please do not hesitate to contact Mohamed Hussein on .
We hope that the above offer will be to your satisfaction and look forward to receiving your confirmation.