0% found this document useful (0 votes)
47 views1 page

Order Date 13.11.24

Uploaded by

raja.race07
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
47 views1 page

Order Date 13.11.24

Uploaded by

raja.race07
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Document No.

SD-608
STANDARD ISO 9001: 2015 Revision No. 05
Effective Date 25-Jan-22
CLAUSE 8.2. Requirements for Products and Services Total No. of Pages 1

CONCRETE ORDER FORM

CUSTOMER NAME JUMAIRAH BEACH BUILDING CONTRACTING LLC ORDER No. 2124
J 160 Proposed G Only Workshop, G+M Office, Open Maintenance Platform,
Diesel Tank, O.G Tank, U.G Tank & Guard Rooms,Plot # 5320153 At Saih Shuaib -2,
PROJECT NAME Dubai DATE 13-Nov-24

DELIVERY DATE 13/11/2024 DELIVERY TIME 06:00PM ORDERED BY S Raja Rathinam

Qty Time Truck Pump Tick Temp. Control- (OC) Contact Person @ construction site
S/N Mix Code Grade Mix Details
(m3) Required Interval Size (m) 32 30 28 26 Name Number
1 D12/G0008 C 40/20 283 06:00PM 10 42m RAJA +971 544632101
2
3
4
5
6
7
Note:
1 Temperature & slump shall be checked within 30 minutes upon arrival at site. Any rejection due to non-compliance after 30 minutes from arrival time at site will not be accepted.
2 If the concrete is supplied with pump, the maximum truck interval between trucks shall be 25 min.
3 If the concrete supplied is without pump, the maximum offloading time shall be 60 minutes from the time of arrival at site
4 Delivery tickets shall be dully filled up (full name and signature) and return to the driver upon completion of offloading
5 Orders shall be placed 24 hours in advance (before closing of the office at 5pm) and for any order more than 1000m 3 , the booking shall be done 48 hours in advance.
6 The contractor shall arrange and ensure safe access for concrete mixers and pumps to casting location.
CONTACT US - (concreteorders@dmix.ae - Land line 04- 880 1141)
Operations Manager Hamad Al Nil (50) 494-8636 Technical Manager Vishal (50) 510-2627
Production Supervisor Anthony (50) 553-5021 Material Engineer Rajkumar (50) 825-4834
Sales Manager Brian (50) 553-5019 Safety Officer (JAli) Nizam (56) 639-7900

You might also like