Bifurcation
\ Item no.
1
1.1
Repairing
0
AMC
365
Remarks
Initially all manpowers will be used for the maintenance
1.2 0 365 work in general shift for rectification of faulty spares on
1.3 0 365 handed over building
2 /
2.1 450 300
2.2 700 300 On hostel blocks, span length of wiring from ground floor
2.3 500 250 pane1 to each floor DB
2.4 300 150
3 37 0
Replacement of stolen/missing items.
4 26 0
5 6 78
On operation of the whole campus, winding & capacitor
6 17 133
failure of many fans are expected since not running for a
7 0 150 iong time after testing, hence these items are proposed to 1
8 17 133
9 17 133
be kept in the estimate. ' I
Only proposed to be replaced at staircase and corridors,
10 70 10 rest lights on bathroom & balcony are proposed to be
replaced with low cost item i.e. Item no. 12
Exact lights are not avialable in the local market, proposed
11 160 40
to he Teplaced with hoider & O.5W l£O buib
On bathroom & balcony room of Hostels where lxl ft sq
12 200 80 lights are damaged, this item is proposed to be installed
instead.
13 120 80
14 60 40
15· 0 30 Other dark places in the campus as per requirement.
Some lights doesn't exists may be stolen, others are not
16 35 15
glowing due to prolonged use and no maintenance till
17 120 60
18 5 5
19 15 5
')() 60 20
At many places, switch, socket and cover plates are not
21 15 5
there, only exposed w1r1'ng and ABB box is instatied.
22 5 5
23 5 s
24 15 5
25 15 5
To be installed for installation of item no. 11, 14 & 15 for
26 0 250 modification of existing costly lights or lights which are not
available in local market.
Required at some places where lxl square lights are
27 90 10
installed, which are to be replaced with 2 ft tube light.
I 28 5 10
29 5 25
30 5 25
31 5 15
32 5 15
33 5 15 Few items have failed, needs replacement. Others are kept
34 5 15 for maintenance work for expected failure on continous
35 1 5 running of infrastructure.
36 1 5
37 l !i
38 1 5
39 5 10
40 5 10
41 0 3
42 0 2 Kept for maintenance work on continues higher load/in
43 0 1 case of failure of existing MCCB
44 0 2
Have high chances of failures on multiple switching
45 1 4
ON/OFF of MCCb, hence 4 spare kept.
46 For replacement of faulty rising main bus bar
46.1 10.5 3.5 One piece spare for maintenance
46.2 3 7 two piece spare for maintenance
46.3 4 4 One piece spare for maintenance
47 For replacement of tap off switches
47.1 1 1 One piece spare for maintenance
47.2 1 1 One piece spare for maintenance
47.3 1 1 One piece spare for maintenance
I
47.4 1 1 One piece spare for maintenance
48 0 40
49 D 34
50 0 12
51 0 30
52 0 18
53 0 12 I
54 0 9
6 For day to day maintenance
55 0
56 0 18
57 0 12
58 0 150
59 0 2
60 0 20
61 0 12
62 0 9 '
~-