Department Designation KPIs
Maintain audit score of 3.00 across all
projects
Review the EHS Performance of all
project every month with Project Head
& EHS Manager
Ensure Zero Fatality and Zero
Hospitalization incident (LTI) in all
projects
Introduction and Provision of OHC (AS
ENGINEERING HEAD ENGINEERING PER BOCW) on all projects
Building Safety culture through Felt
leadership and setting accountability
for safety
Monthly/ Fortnightly once visit to each
site and conduct safety round and
submit safety observation report and
ensure compliance within 48 hours.
Provision of separate budget for EHS
for all projects.
Weightage Measurable Results Data source
Safety Audit score should be of 3.00 in all
projects - 100% Score,
Else - 0% Score Safety Audit Report
Visit all the sites once in a month with
acompany of Project Manager and Incharge
Safety and send observation report:
100% done in a month - 100% Score
One exception/month -70% Score
Else - 0% Score Observation Report
0 Fatality with 0 LTI - 100% Score,
Else-0% Score Safety Audit Report
TBD
TBD
KPI 2
TBD
Responsibility of Data
EHS Incharge
Head Engg.
EHS Incharge
Department Designation KPIs
Maintain audit score above 3.00
Weekly once site & Workers camp visit
with respect to EHS and submit
observation report and ensure compliance
within 48 hours.
Zero LTI including Fatalities
Ensure timely compliance (within 48 hour)
of Safety observation report issued by
Engg Head & EHS Manager.
Participation in Project safety Committee
meeting every month
Implementation of best practices with
respect to EHS other than the regular
practices.
Reward & Recognisation for workers and
staff to enhance EHS management at site.
Weightage Measurable Results Data source
Safety Audit score should be of 3.00 in
all projects - 100% Score,
Else - 0% Score Safety Audit Report
Visit the site and Labour camp once in
a week with acompany of Incharge
Safety and send observation report :
100% done in a month - 100% Score
One exception/month -70% Score
Else - 0% Score Observation Report
0 Fatality with 0 LTI - 100% Score,
Else-0% Score Safety Audit Report
Ensure that all compliance should be
resolved/closed within 48 hours after
receiving Safety Observation Report
by Head Engg. & EHS Manager.
If closed all compliance within said
time - 100% Score,
90% closed on time - 90% Score,
80% closed on time - 70% Score,
Else -0% Score Compliance
Ensure presence in all Project Safety
Committee meeting scheduled in
every month: 100% Score
1 Exception / year - 70% Score Meeting Attendance
Else-0% Score Sheet
No. of practices implemented with
respect to EHS:
If atleast 8 practices generated in a
year with minimum budget- 100% ;
If atleast 6 practices generated in a
year with minimum budget - 70% ;
Else, 0% Score
Safety Audit Report
(Can be merged with KPI 7)
Responsibility of Data
EHS Incharge
Project Manager
EHS Incharge
Project Manager
Project Manager
EHS Incharge
Department Designation KPIs
Maintain audit score above
3.00
Zero LTI including Fatalities
Participation in Project safety
Committee meeting every
month
Ensuring smooth flow of mock
drills at assigned area.
Implementation of best
practices with respect to EHS
other than the regular
practices.
Near Miss reporting
Weightage Measurable Results Data source
Safety Audit score should be of
3.00 in all projects - 100%
Score,
Else - 0% Score Safety Audit Report
0 Fatality with 0 LTI - 100%
Score,
Else-0% Score Safety Audit Report
Ensure presence in all Project
Safety Committee meeting
scheduled in every month:
100% Score
1 Exception / year - 70% Score Meeting Attendance
Else-0% Score Sheet
Total 8 Mockdrills/year to be
happened successfully in
particular assigned buildings (As
per Audit Report by EHS ):100%
Score,
If 6 Mockdrills/year to be
happened successfully in
particular assigned buildings (As
per Audit Report by EHS ):70%
Score,
Else - 0% Score
Safety Audit Report
No. of practices implemented
with respect to EHS:
If atleast 12 practices
generated in a year with
minimum budget- 100% ;
If atleast 10 practices
generated in a year with
minimum budget - 70% ; Else,
0% Score
Safety Audit Report
Observe if any near miss has
happened at site, record the
same and submit the report to
Incharge EHS every
month:100% Score,
1 Exception / Quarter - 70%
Score
Else - 0% Score Safety Audit Report
Responsibility of Data
EHS Incharge
EHS Incharge
Engineer
EHS Incharge
EHS Incharge
EHS Incharge
Department Designation KPIs
Maintain audit score above 3.00
Job spcecific tool box talk
Zero LTI including Fatalities
Housekeeping and material
stacking as per standard.
Implementation of best practices
with respect to EHS other than
the regular practices.
Reporting and resolving EHS
violations at Site.
Near Miss reporting
Weightage Measurable Results Data source
Safety Audit score should be
of 3.00 in all projects - 100%
Score,
Else - 0% Score Safety Audit Report
TBD
0 Fatality with 0 LTI - 100%
Score,
Else-0% Score Safety Audit Report
TBD
No. of practices
implemented with respect
to EHS:
If atleast 12 practices
generated in a year with
minimum budget- 100% ;
If atleast 10 practices
generated in a year with
minimum budget - 70% ;
Else, 0% Score
Safety Audit Report
Any violations happned in a
particular month has to be
resolved and recorded at
site and report to be
submitted to Sr. Engineer
and Incharge EHS - 100%
Score,
Else - 0% Score Safety Audit Report
Observe if any near miss has
happened at site, record the
same and submit the report
to Sr. Engineer every
month:100% Score,
1 Exception / Quarter - 70%
Score
Else - 0% Score Safety Audit Report
Responsibility of Data
EHS Incharge
EHS Incharge
EHS Incharge
EHS Incharge
EHS Incharge
Department Designation KPIs
Checking of ELCB/RCCB at every
15 days and earth pit at every
month (Log register should be
maintained)
Engineering ELECTRICIAN
All panel, Bar cutting machines,
temp. structures should be
connected with earthing
Workers camp wiring should be
done through PVC pipe only &
earthing for workers hutments.
Single line diagram should be
made and displayed at required
locations.
Weightage Measurable Results Data source
Checking of all ELCB/RCCB and
earth pit fortnightly and submit
the log book to Project Manager
every month:100% Score,
Else -0% Score Monthly Report
Check all Panel,Bar cutting
machines, Workers camp wiring
through PVC pipe or not,
Earthing for workers hutments
and temp. structures has been
connected with earthing or not
by every fortnightly and submit
the report for the same:100%
Score,
Else - 0% Score Monthly Report
Merged with KPI 2
Single line diagram should be
made and displayed at all sites:
100% Score,
Else - 0% Score Safety Audit Report
Responsibility of Data
Self
Self
EHS Incharge