Sub Contractor SOR & NCR LOG

The document contains an internal log of Sub Contractor SOR (Site Observation Reports) and NCR (Non-Conformance Reports) for the Laheq Island project, detailing issues related to quality compliance and construction practices. It lists various SOR and NCR entries, their subjects, types, locations, issued dates, and statuses, indicating some are closed out while others remain open. Key issues include non-compliance with quality standards and improper construction practices across different areas of the project.

Uploaded by

Muhammad Hussain
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
100 views2 pages

Sub Contractor SOR & NCR LOG

The document contains an internal log of Sub Contractor SOR (Site Observation Reports) and NCR (Non-Conformance Reports) for the Laheq Island project, detailing issues related to quality compliance and construction practices. It lists various SOR and NCR entries, their subjects, types, locations, issued dates, and statuses, indicating some are closed out while others remain open. Key issues include non-compliance with quality standards and improper construction practices across different areas of the project.

Uploaded by

Muhammad Hussain
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Sub Contractor Internal SOR Log HO1/A01 Laheq Island

S# SOR Number Subject Type Location Sub Contractor Issued Date Status Clouse out Date
L01-H01C02-TIE-SOR-ME-0001 failure to comply quality standard during Marina First raft
1 SOR Basement Tiian 23-12-2024 Closed out 1/1/2025
L01-H01C02-TIE-SOR-CI-0002 Non-Compliance with Quality Procedures for Construction Joint
2 Implementation SOR Grid 8.3 to 9.1 Tiian 25-12-2024 open
L01-H01C02-TIE-SOR-CI-0003 Non-Compliance with Proper Use of Concrete Vibrator During Concrete
3 pouring SOR Marina Tiian 1/12/2024 open

L01-H01C02-TIE-SOR-CI-0004 Curing Compound Not Applied During Slab Casting


4 SOR Marina Slab Tiian 27-02-25 open
Sub Contractor Internal NCR Log HO1/A01 Laheq Island

S# SOR Number Subject Type Location Sub Contractor Status Issued DateClouse out Date

1 L01-H01C02-TIE-NCR-ME-0001 Marina Basement - Gully trap Area NCR Basement Tiian Close out 23-12-2024 8-Jan-25

Unauthorized Concreting of Pedestals at Grid 8.3 to 9.1 Without Prior Approval and Anchor
2 L01-H01C02-TIE-NCR-CI-0002 NCR Grid 8.3 to 9.1 Tiian Close out 6/1/2025 18-01-25
Bolts.

3 L01-H01C02-TIE-NCR-CI-0003 formwork failed at the specified area. NCR Basemnet Tiian Close out 23-12-2024 1/1/2025

4 L01-H01C02-TIE-NCR-CI-0004 Missing Dowel Bars for Upstand Wall at Grid (14) Courtyard Segment Area NCR Grid (14) Courtyard Tiian open
Segmen 8/1/2025

5 L01-H01C02-TIE-NCR-ME-0005 Non-Conformance Report for Improper Loading on PVC Pipes NCR Basemnet Part 02 Tiian Close out 14/01-2025
9/1/2025
Non-Compliance with Project Specifications: Failure to Fill Pipes with Water 24 Hours
6 L01-H01C02-TIE-NCR-ME-0006 NCR Marina Grid 12 Tiian Close out
Before Raft Casting 15-01-25

7 L01-H01C02-TIE-NCR-ME-0007 Use of Unapproved Clamp for Earthing NCR Marina Grid 26 to 28 Sinohan Open 15-01-25

Steel structure not proper install due to misalignment of TB06 and anchor bolts during
8 L01-H01C02-TIE-NCR-CI-0008 NCR Souq Sinohan Open 18-01-25
concrete casting.

9 L01-H01C02-TIE-NCR-ME-0009 Removal of End Cap from HDPE Pipe in the Basement Area. NCR Basemnet Part 02 Tiian Close out 18-01-25 29-01-25

10 L01-H01C02-TIE-NCR-ME-0010 Improper Placement of Rebars Directly on Soil NCR Marina Sinohan Open 19-01-25

11 L01-H01C02-TIE-NCR-ME-0011 Use of Unapproved Materials (Floor Drains and Pipes) in the Souq NCR Souq Sinohan Open 26-01-25

12 L01-H01C02-TIE-NCR-ME-0012 Use of Unapproved planting material for anchoring NCR Basemnet Tiian Close out 28-01-25 5/2/2025

13 L01-H01C02-TIE-NCR-ME-0013 Unauthorized Concrete Pouring Without MEP Clearance NCR Marina Grid 8 to 9 Tiian Open 28+01-25

14 L01-H01C02-TIE-NCR-ME-0014 Formwork Closure Without MEP Clearance and Reinforcement Inspection NCR Marina Basement Tiian Open
11/2/2025

15 L01-H01C02-TIE-NCR-CI-0015 Improper Sieving of Backfill Material Prior to Use NCR Marina Grid 16-17 Tiian Open
11/2/2025

16 L01-H01C02-TIE-NCR-ME-0016 Improper Storage of UPVC Pipes & Fittings NCR Storage Area Tiian Close out 18-02-25
11/2/2025
Reataining Wall
17 L01-H01C02-TIE-NCR-CI-0017 Rebar Directly Contact with PVC Waterproofing membrane NCR Tiian Open
Marina Basement 11/2/2025

18 L01-H01C02-TIE-NCR-EL-0018 Lightning Protection Down Conductor at Grid 13 - 13.1 Marina NCR Grid 13 - 13.1 Marina Tiian Open
11/2/2025
Casted Stair Walls and Lift Walls without MEP Clearance
19 L01-A01C02-TIE-NCR-CI-0019 NCR Souq Basement Tiian Open
24-02-25
Premature Shuttering Removal & Tilted Cantilever Beam at Grid 13.4
20 L01-H01C02-TIE-NCR-CI-0020 NCR Marina Grid 13.4 Tiian Open
27-02-25