NR Electric Protection
NR Electric Protection
ITEM: Protection
Company: NR Electric Co., Ltd.
(Copy)
Business Scope: R&D, production, sales and technical services of power automatic control and protection
equipment, power electronic equipment, intelligent switches and monitoring equipment, industrial
automatic control systems and supporting computer equipment; sales of electronic components;
photovoltaic power generation; Contact for overseas projects that are consistent with company’s ability,
scale and achievement. Dispatch necessary labors for the implementation of above-mentioned overseas
projects. Import and export of various goods and technologies (excluding those dealt with by designated
companies or prohibited from import or export by the State). Manufacture of power transmission,
distribution and control equipment; Sales of intelligent power transmission, distribution and control
equipment; Lease of non-residential real estate; (For the projects legally subject to the approval, before
carrying out business activities, it has to obtain the approval from relevant departments.)
Registration Authority:
CNNC CHINA
GENERATOR PROTECTION FOR UNIT 2
ZHONGYUAN NUCLEAR
GENERATOR OF 340MW CHASHMA NUCLEAR RCS-985, RCS-974 2006 PAKISTAN
ENGINEERIING POWER PLANT
POWER PLANT, PAKISTAN
CORP
SEPCOIII ELECTRIC
BUSBAR PROTECTION FOR JHARSUGUDA POWER
RCS-915 2006 POWER PLANT INDIA
POWER PLANT, INDIA CONSTRUCTION
CORPORATION
HUNAN
FEEDER LINE PROTECTION FOR 4×25MW
RCS-9625 CREATWALL SWICH 2006 POWER PLANT INDIA
GUJARAT POWER PLANT, INDIA
CO.,LTD
SVC PROJECT FOR TAIXING, VIETNAM RCS-9700C, RCS-9698, RCS-9794 RXPE 2008 INDUSTRIAL VIETNAM
SHENZHEN
SHANDONG
33KV SUBSTATION AUTOMATION SYSTEM FOR RCS-9700C, RCS-9700, RCS-
NUCLEAR POWER 2008 POWER PLANT INDIA
210MW LANJIGARH POWER PLANT, INDIA 9698, RCS-9794
ENGINEERING CO.,
LTD
SHANGHAI HUA
AUXILIARY POWER SYSTEM PROTECTION FOR RCS-9622, RCS-9624, RCS-9625, TONG
2008 POWER PLANT INDIA
4*135MW WPCPL POWER PLANT, INDIA RCS-9626, RCS-9627, SWITCHGEAR
WORKS CO.,LTD
SEPCOIII ELECTRIC
400KV REACTOR PROTECTION, TRANSFORMER
POWER
PROTECTION, CIRCUIT BREAKER PROTECTION RCS-917, RCS-978, RCS-921 2008 POWER PLANT INDIA
CONSTRUCTION
FOR 5*660MW APL POWER PLANT, INDIA
CORPORATION
SHENZHEN
SHANDONG
GENERATOR PROTECTION FOR 210MW
RCS-985, RCS-974 NUCLEAR POWER 2008 POWER PLANT INDIA
LANJIGARH POWER PLANT, INDIA
ENGINEERING CO.,
LTD
GENERATOR PROTECTION, SEPCOIII ELECTRIC
STARTUP/STANDBY TRANSFORMER POWER
RCS-985, RCS-974 2008 POWER PLANT INDIA
PROTECTION FOR 5*660MW APL POWER CONSTRUCTION
PLANT, INDIA CORPORATION
SEPCOIII ELECTRIC
SUBSTATION AUTOMATION SYSTEM FOR POWER
RCS-9700C, RCS-9698, RCS-9794 2008 POWER PLANT INDIA
5*660MW APL POWER PLANT, INDIA CONSTRUCTION
CORPORATION
TIANSHUI
AUXILIARY POWER PROTECTION FOR 9*135MW RCS-9622, RCS-9624, RCS-9625,
CREATWALL SWICH 2008 POWER PLANT INDIA
JHARSUGUDA POWER PLANT, INDIA RCS-9626, RCS-9627
CO.,LTD
TIANSHUI
AUXILIARY POWER PROTECTION FOR 9*135MW RCS-9622, RCS-9624, RCS-9625,
CREATWALL SWICH 2008 POWER PLANT INDIA
JHARSUGUDA POWER PLANT, INDIA RCS-9626, RCS-9627
CO.,LTD
SPARE PARTS FOR POWER PLANT, INDIA RCS-985 TIANAN ELECTRIC 2008 POWER PLANT INDIA
GENERATOR PROTECTION FOR SREPOK 4A
RCS-985, RCS-974, RCS-902 DONGFANG GROUP 2009 HPP VIETNAM
HYDROPOWER PLANT
ANSHAN HENGLI
ELECTRICAL
PROTECTIVE RELAY FOR EIL STEEL PLANT,
RCS-9600CN EQUIPMENT 2009 INDUSTRIAL INDIA
INDIA
MANUFACTURING
CO., LTD
SHANDONG
PROVINCE
PROTECTION AND AUTOMANTION SYSTEM
RCS-9700C, RCS-9698, RCS-9794 METALLURGICAL 2009 INDUSTRIAL INDIA
FOR EIL STEEL PLANT, INDIA
ENGINEERING
CO.,LTD
SHANDONG
PROVINCE
PROTECTION AND AUTOMATION SYSTEM FOR RCS-9600CN, RCS-9794, RCS-
METALLURGICAL 2009 INDUSTRIAL INDIA
35KV SUBSTATION OF EIL STEEL PLANT, INDIA 9698, RCS-9700
ENGINEERING
CO.,LTD
SHANDONG
PROVINCE
PROTECTION AND AUTOMATION SYSTEM FOR RCS-9600CN, RCS-9794, RCS-
METALLURGICAL 2009 INDUSTRIAL INDIA
6.6KV SUBSTATION OF EIL STEEL PLANT, INDIA 9698, RCS-9700
ENGINEERING
CO.,LTD
SHANDONG
PROVINCE
EMS FOR EIL STEEL PLANT, INDIA RCS-9001 METALLURGICAL 2009 INDUSTRIAL INDIA
ENGINEERING
CO.,LTD
SHENZHEN
SHANDONG
ECS FOR 210MW LANJIGARH POWER PLANT, RCS-9600CN, RCS-9794, RCS-
NUCLEAR POWER 2009 POWER PLANT INDIA
INDIA 9698, RCS-9700
ENGINEERING CO.,
LTD
SHANGHAI
AUXILIARY POWER PROTECTION FOR APL RCS-9622, RCS-9624, RCS-9625, GUANGDIAN
2009 POWER PLANT INDIA
POWER PLANT, INDIA RCS-9626, RCS-9627 ELECTRIC GROUP
CO.,LTD
SHANGHAI
AUXILIARY POWER PROTECTION FOR APL GUANGDIAN
RCS-9600CN 2009 POWER PLANT INDIA
POWER PLANT, INDIA ELECTRIC GROUP
CO.,LTD
SHANGHAI
AUXILAIRY POWER PROTECTION FOR APL GUANGDIAN
RCS-9600CN 2009 POWER PLANT INDIA
POWER PLANT, INDIA ELECTRIC GROUP
CO.,LTD
SEPCOIII ELECTRIC
GENERATOR PROTECTION FOR 2*660MW POWER
RCS-985, RCS-974 2009 POWER PLANT INDIA
JHAJJAR POWER PLANT, INDIA CONSTRUCTION
CORPORATION
XIAN ELECTRIC
ECT AND EVT FOR 132KV QIDONGDAO DIGITAL
PCS9250 ENGINEERING 2010/9/30 SUBSTATION HONG KONG
SUBSTATION
CO.,LTD
SUZHOU TENGRUI
PROTECTIVE RELAY FOR POWER PLANT IN POWER
RCS9611C 2010/10/8 POWER PLANT INDONESIA
INDONESIA ENGINEERING CO.,
LTD
COLOR SCIENCE
PROTECTIVE RELAYS FOR CAIPU
PCS931, AND TECHNOLOGY 2010/10/9 SUBSTATION TAIWAN
TECHNOLOGY CO., LTD.
CO., LTD
SEPCO ELECTRIC
PROTECTIVE RELAYS FOR 9*135MW POWER
PCS9882,RCS9794 2010/10/12 POWER PLANT INDIA
JHARSUGUDA POWER PLANT CONSTRUCTION
CORP
NARI-RELAYS
NIGERIA PROJECT RCS9658CU ELECTRIC NIGERIA 2010/10/14 SUBSTATION NIGERIA
LTD.
SEPCO ELECTRIC
POWER
GMR KAMALANGA THERMAL POWER PLANT SPARE PARTS 2010/10/18 POWER PLANT INDIA
CONSTRUCTION
CORP
NATIONAL GRID
SUBSTATION OF NGCP PCS902,CJX-02 CORPORATION OF 2010/10/20 SUBSTATION PHILIPPINES
THE PHILIPPINES
RCS985TS,PCS985A,RCS974FG, SINOHYDRO
GHANA 161KV BUWEI HYDROPOWER STATION
RCS9661,RCS922A,RCS921A,RC CORPORATION 2010/10/27 HPP GHANA
S915E,PCS996R,CZX-12R LIMITED
HANGZHOU YATAI
GENERATOR PROTECTION PANEL FOR ELECTRIC POWER HYDRO POWER
CJX02,RCS974,RCS985, 2010/11/2 KAZAKHSTAN
KAZAKHSTAN 45MW HYDROPOWER STATION TECHNOLOGY CO., STATION
LTD
CJX11,CZX12R2,PCS9882,RCS93
1BM,RCS9611C,RCS9631C,RCS9
CONGO(D.R) SHITURU COPPER MINE 220KV CHINT ELECTRIC
698G,RCS9703C,RCS9705C,RCS9 2010/11/12 SUBSTATION CONGO, DEM. REP.
SMCO STEP-DOWN SUBSTATION CO.,LTD
706C,RCS974A,RCS9784A,RCS97
85C,RCS978E
GUANGDONG
BENGAL 132KV DOHAZARI 100MW GENERATOR COAL POWER
PCS-996R PCS-9882C IPC POWER 2011/1/10 BENGAL
PROJECT SUBSTATION PLANT
ENGINEERING
CORP
INCONTROL TECH
MALAYSIA 1P9 6112 UTM SKUDAI SUBSTATION PCS-9882B PCS-9882C 2011/1/14 SUBSTATION MALAYSIA
SDN BHD
UNION ELECTRICA
COLUMBIA 115KV MOCORONGO SUBSTATION PCS-931 PCS-9611 CJX-02 2011/1/17 SUBSTATION COLUMBIA
S.A.
ZHEJIANG
RCS-943A-CPU RCS-915AB-CPU
TURKMENISTAN 110KV TURKMENISTAN CHANGJIANG
RCS-9794A-COM RCS-9700C- 2011/1/27 SUBSTATION TURKMENISTAN
SUBSTATION ELECTRIC CO., LTD
CPU
SHANGHAI
RCS-9622CN RCS-9624CN RCS-
GUANGDIAN COAL POWER
INDIA APL5*660MW POWER PLANT 9625CN RCS-9626CN RCS- 2011/1/29 INDIA
ELECTRIC GROUP PLANT
9627CN RCS-9628CN
CO.,LTD
SEPCO ELECTRIC
COAL POWER
INDIA JHARSUGUDA 9*135MW POWER PLANT SPARE PARTS POWER 2011/2/14 INDIA
PLANT
CONSTRUCTION
CORP(SEPCO)
CHINA COMMODITY
SAUDI ARABIA 660MW SAUDI ARABIA POWER COAL POWER
RCS-9627CN NET 2011/2/14 SAUDI ARABIA
PLANT PLANT
GUODIAN NANJING
SRI LANKA 220KV VEYANGODASUBSTATION; COAL POWER
SPARE PARTS AUTOMATION 2011/2/14 SRI LANKA
KOTUGODA SUBSTATION PLANT
CO.,LTD
MOZAMBIQUE 220KV ALTO MOLOQUE HIGH VOLTAGE
PCS-9611 2012/5/17 SUBSTATION MOZAMBIQUE
SUBSTATION TECHNOLGY
CNMC
ZAMBIA 10KV SUBSTATION Spare Parts(Module) INTERNATIONAL 2012/5/17 SUBSTATION ZAMBIA
TRADE LTD.
BEIJING SIFANG
PHILIPPINES 230KV PACO SUBSTATION NR0552N AUTOMATION 2012/5/22 SUBSTATION PHILIPPINES
CO.,LTD
TIANJIN HONGLIAN
TRADE
INDONESIA GUOHUA POWER PLANT DSP2-4A DEVELOPMENT 2012/5/23 POWER PLANT INDONESIA
CO.,LTD
WORLDWIDE
PHILIPPINES LAOYING CEMENT PLANT
RCS-9641CS ELECTRIC STOCK 2012/5/25 INDUSTRIAL PHILIPPINES
CO.,LTD
APL(BEIJING) EXIM
INDIA MUNDRA PHASE COAL POWER PLANT RCS-985RE 2012/5/25 POWER PLANT INDIA
CO.LTD
PSI INCONTROL
MALAYSIA 35KV CRP TESTING PROJECT Spare Part 2012/6/1 SUBSTATION MALAYSIA
SDN.BHD
CNMC
ZAMBIA 10KV CNMC INTERNATIONAL TRADE
RCS-9613C INTERNATIONAL 2012/6/5 INDUSTRIAL ZAMBIA
LTD PROJECT
TRADE LTD.
YANGZHONG
PAKISTAN GUDU COAL POWER PLANT RCS-9651C HAOYANG 2013/1/6 POWER PLANT PAKISTAN
ELECTRIC CO.,LTD
SHANGHAI
TURKEY 400V ATLAS COAL POWER PLANT PCS-9691 PCS-9692 TENGSAI TRADING 2013/1/6 POWER PLANT TURKEY
COMPANY LTD
INDIA SIEMENS LTD INDIA PROJECT SERVICE SIEMENS LTD 2013/1/6 SUBSTATION INDIA
PSI INCONTROL
MALAYSIA 33KV TANCO SUBSTATION RCS-9671C RCS-931 2013/1/6 SUBSTATION MALAYSIA
SDN.BHD
ZHENJIANG
HUAYUAN
PAKISTAN QIAXIMA NUCLEAR POWER STATION SERVICE ELECTRIC POWER 2013/1/7 POWER PLANT PAKISTAN
ENGINEERING CO.,
LTD
PSI INCONTROL
VARIOUS SUBSTATION Spare Parts 2013/1/7 SUBSTATION MALAYSIA
SDN.BHD
JIANGSU JIUSEHNG
PCS-985B RCS-9786A INTERNATIONAL
INDONESIA KALIMANTAN TIMUR EMBALUT
RCS-974AG2 CJX POWER 2013/1/8 POWER PLANT INDONESIA
1*60MW COAL POWER PLANT
SPARE PART MODULE ENGINEERING CO.,
LTD
CENTRAL POWER +
RCS-9794A SPARE PART
BAHRAIN 400KV EWA SUBSTATION PROCESS 2013/1/8 SUBSTATION BAHRAIN
MODULE
SYSTEMS
PSI INCONTROL
VARIOUS SUBSTATION RCS-9671 RCS-921 2013/1/15 SUBSTATION MALAYSIA
SDN.BHD
R&A POWER
VARIOUS SUBSTATION RCS-9631C INDUSTRIAL 2013/1/15 SUBSTATION MALAYSIA
DISTRIBUTION
THE NORTHERN
DELL PCS-9700SOFTWARE VIETNAM POWER
VIETNAM TUYEN QUANG 220KV SUBSTATION PCS-9882ED RCS-9698G PROJECTS 2013/1/16 SUBSTATION VIETNAM
RCS-9785C RCS-9794A PCS-9705 MANAGEMENT
BOARD
SOLUCIONES
VARIOUS SUBSTATION PCS-978 PCS-902 PCS-9611 TELEINFORMATICA 2013/1/17 SUBSTATION PERU
SY
CHINA ELECTRIC
SVC MD1501 PCS-915 PCS-9519H POWER
CAMBODIA GDHA 500KV SUBSTATION PCS-9532A PCS-9532S PCS- EQUIPMENT AND 2014/3/25 SUBSTATION CAMBODIA
9580A TECHNOLOGY
CO.,LTD(HK)
FUZHOU FENGNAN
RELAYS ELECTRIC
INDONESIA SULAWESI 2×65MW POWER PLANT CJX-02 PCS-974A PCS-985B POWER 2014/4/1 POWER PLANT INDONESIA
TECHNOLOGY
CO.,LTD
LJ POWER CO.,
KOREA LJPOWER PROJECT PCS-915IC 2014/4/1 SUBSTATION KOREA
LTD.
NATIONAL GRID
PHILIPPINES BAY SUBSTATION AC MODULE CORPORATION OF 2014/4/3 SUBSTATION PHILIPPINES
THE
NR ELECTRIC
MYANMAR THAPYEWA,BELIN SUBSTATION SERVICE INTERNATIONAL 2014/4/8 SUBSTATION MYANMAR
COMPANY L
NR ENERGY
INDIA BARMER POWER PLANT SPARE PARTS AC MODULE SOLUTIONS INDIA 2014/4/11 POWER PLANT INDIA
PVT. LTD.
SHANGHAI
HUATONG
INDONESIA MEDAN 2×200MW POWER PLANT PCS-9691 2014/4/14 POWER PLANT INDONESIA
ELECTRIC (GROUP)
CO., LTD
SHANDONG
PROVINCE
INDIA ELECTRICAL STEEL COMPOSITE CO.,
RCS-9626CN METALLURGICAL 2014/4/15 INDUSTRY INDIA
LTD 220KV EIL STATION
DESIGN INSTITUTE
CO., LTD
KSHEMA POWER &
CJX, PCS-902,PCS-9705,PCS-
INDIA TNEB 231KV KAYATHAR SUBSTATION INFRASTRUCTURE 2015/8/28 SUBSTATION INDIA
9882
COMPA
ETHIOPIAN
PCS-902,PCS-978,PCS-9611,PCS-
ETHIOPIAN EEU PROJECT ELECTRIC UTILITY 2015/8/28 SUBSTATION ETHIOPIA
915
(EEU)
RCS-9698,RCS-9785,RCS-9794,
NR ELECTRIC
HONG KONG CLP PONT HONG KONG-ZHUHAI- PCS-9705, PCS-9882,PCS-
INTERNATIONAL 2015/8/28 SUBSTATION HONG KONG
MACAO SUBSTATION(HMB) 9611,PCS-9700
COMPANY L
CHINT ELECTRIC
PAKISTAN 230KV MANSEHRA GRID PROJECT PCS-996R 2015/8/28 SUBSTATION PAKISTAN
CO.,LTD
NS.91 TRADING
THAILAND YANNI COGENERATION PROJECT RCS-9659,RCS-985G, RCS-9708C 2015/8/31 INDUSTRY THAILAND
CO,.LTD
PCS-9580,PCS-9580CD,PCS- ZONERGY
PAKISTAN 200MW PV POWERSVC PROJECT 9580S,PCS-9586C,PCS-9611,PCS- COMPANY 2015/8/31 POWER PLANT PAKISTAN
9882AD,RCS-9794A LIMITED(TIANJIN)
PCS-9611,PCS-9671,PCS-
9705A,PCS-9705B,PCS-
PAKISTAN 200MW PV POWER PROJECT CREST ZONERGY
9726A,PCS-9799B,PCS- 2015/8/31 POWER PLANT PAKISTAN
SUBSTATION COMPANY LIMITED
9882AD,PCS-9882ED,PCS-
996R,RCS-9663D,RCS-
PCS-9611,PCS-9671,PCS-
9705A,PCS-9705B,PCS-
PAKISTAN 200MW PV POWER PROJECT BEST ZONERGY
9726A,PCS-9799B,PCS- 2015/8/31 POWER PLANT PAKISTAN
GREEN SUBSTATION COMPANY LIMITED
9882AD,PCS-9882ED,PCS-
996R,RCS-9663D,RCS-
PCS-931,PCS-915,CJX, PCS-
978,PCS-974,PCS-9705,PCS-9882,
PHILIPPINE SUBIC 14.5MW PV POWER
RCS-9698,RCS-9785,RCS-9794, CSUN 2015/8/31 POWER PLANT PHILIPPINES
PROJECT
PCS-996R,PCS-9641,PCS-
9726,PCS-9611,PCS-9700
TRANSMISSION
CJX, PCS-902, PCS-9705, PCS-
INDIA 220KV TSTRANSCO PARIGI SUBSTATION CORPORATION OF 2015/8/31 SUBSTATION INDIA
9882
TELANGA
RCS-9698,RCS-9785,RCS-9794,
NR ELECTRIC
HONG KONG CLP HEUNG YUEN WAI PCS-9705, PCS-9882,PCS-
INTERNATIONAL 2015/8/31 SUBSTATION HONG KONG
SUBSTATION(HYW) 9611,PCS-9700
COMPANY L
POWERNETS
HONG KONG 132KV VARIOUS SUBSTATIONS PCS-9882BD MARKETING 2015/8/31 SUBSTATION HONG KONG
LIMITED
NR ELECTRIC
HONG KONG POWERNET LOOSE RELAY PCS-9882BD INTERNATIONAL 2015/8/31 SUBSTATION HONG KONG
COMPANY L
PCS-915IC,PCS-921,PCS-
931,PCS-9611,PCS-9651,PCS-
KENYA NAIROBI 220KV & 66KV POWER GRID
9656D,PCS-9671,PCS-9705A,PCS- TBEA 2015/8/31 SUBSTATION KENYA
PROJECT
9705BS,PCS-9705C,PCS-
974C,PCS-978,PCS-9799B,
PCS-902,PCS-9705,PCS-
9611,PCS-978, PCS-915,,PCS-
YOTEK JOINT
VIETNAM 220KV SON HA SUBSTATION 931,MUX-2M, RCS-9698,RCS- 2015/8/31 SUBSTATION VIETNAM
STOCK COMPANY
9785,RCS-9794, PCS-9882,PCS-
9700
ENERGY CHINA
GHANA POWER PLANT PROJECT CJX-02 2015/9/2 POWER PLANT GHANA
GPEC
CJ_NR1102J,CJ_NR1301T,CJ_NR
PHILIPPINE SP12.ASUP.LT-0108 PROJECT NARI GOURP 2015/9/2 SUBSTATION PHILIPPINES
1504A,CJ_NR1401
FUZHOU FENGNAN
RELAYS ELECTRIC
INDONESIA QINGSHAN INDUSTRIAL PARK
RCS-9794A,PCS-9882AD POWER 2015/9/6 INDUSTRY INDONESIA
PLANT
TECHNOLOGY
CO.,LTD
PT.PERMATA PRIMA
INDONESIA 150 KV GI SANUR, 150 KV GI ANCOL
PCS-915,PCS-9882 ELECTRICAL 2015/12/29 SUBSTATION INDONESIA
SUBSTATIONS
ENGINEE
PCS-921,PCS-9611,PCS-
INDONESIA PT. DIMENSI MULTI CAHAYA PT. DIMENSI MULTI
9671,PCS-9705C,PCS-9882ED- 2015/12/29 SUBSTATION INDONESIA
PROJECT CAHAYA
D,MD1501,MD1701
PCS-902,PCS-915IC,PCS-
LAOS 115KV THAFA SUBSTATION、115KV
9611,PCS-9705A,PCS-9794A,PCS- CCC ENGINEERING
LOUANG NAMTHA SUBSTATION、115KV NAMO 2015/12/29 SUBSTATION LAOS
9799B,PCS-9882AD,RCS- LTD
SUBSTATION
9661C,RCS-9785C
PCS-921,PCS-915,PCS-9705,RCS-
9785, PCS-221G-I-EN, PCS-221N-
COLUMBIA SURIA DIGITAL SUBSTATION INGEMA S.A. 2015/12/30 SUBSTATION COLUMBIA
I-N, PCS-222B-EN-I, PCS-
9882,PCS-9799,PCS-9700
NATIONAL GRID
BRITAIN NGC SUBSTATIONS SCS PCS-9705,PCS-9799,PCS-
ELECTRICITY 2015/12/30 SUBSTATION UK
REPLACEMENT 9882,RCS-9785,PCS-9700
TRANSMISS
NEW NORTHEAST
INDIA 400KV HAMIRPUR SUBSTATION PCS-9830 2016/1/5 SUBSTATION INDIA
ELECTRIC GROUP
LJ POWER CO.,
KOREA KEPCO 345KV SUBSTATION PCS-931,PCS-902 2016/1/7 SUBSTATION KOREA
LTD.
NR ENERGY
RCS-9622,RCS-9626,RCS-
INDIA KMPCL PLANT SPARES SOLUTIONS INDIA 2016/1/11 SUBSTATION INDIA
9627,RCS-9625
PVT. LTD.
SHANGHAI
CZX,PCS-978,PCS-974,PCS-
HENDENDI
PHILIPPINES SAN JOSE & MEXICO SUBSTATION 915,PCS-9611,MUX-2MD,PCS- 2016/1/11 SUBSTATION PHILIPPINES
INDUSTRY&TRADE
931,PCS-902
CO.,LTD
JIANGSU XINFUDA
GENERAL
INDONESIA PROJECT NR0202 2016/1/15 OTHERS INDONESIA
EQUIPMENT CO.
LTD.
SHANGHAI POWER
EQUIPMENT
PCS-985RS,PCS-9671,PCS-
INDONESIA FAJAR1×55MW PLANT PROJECT COMPLETE 2016/1/15 POWER PLANT INDONESIA
974,PCS-985TS,PCS-9659D
RESEARCH
INSTITUTE
NANJING FUTAI
ELECTRIC
TURKEY EREN PLANT PROJECT CZX-02 2016/1/15 POWER PLANT TURKEY
EQUIPMENT
CO.,LTD
BEIJING ZHONGLI
LIYUAN
US ELECTRICAL SOLAR POWER PLANT PCS-931,PCS-978,PCS-9611 ELECTRICAL 2016/1/18 POWER PLANT USA
EQUIPMENT CO.,
LTD
FUZHOU FENGNAN
PCS-9794A,PCS-9693A,PCS- RELAYS ELECTRIC
INDONESIA 10KV SULAWESI ZHONGHAO
9693D,PCS-9705C,PCS- POWER 2016/1/20 INDUSTRY INDONESIA
NICKEL PROJEC
9882AD,RCS-9212B,RCS-9211B TECHNOLOGY
CO.,LTD
NEW NORTHEAST
INDIA 400KV DEHAR SUBSTATION PCS-9830 2016/1/25 SUBSTATION INDIA
ELECTRIC GROUP
RCS-9794,RCS-9785,RCS-
9698,RCS-9671,RCS-9661,
FEDDERS LLOYD
NIGERIA 132KV DAN AGUNDI SUBSTATION RCS-902,PCS-9882,PCS-978, 2016/1/26 SUBSTATION NIGERIA
CORPORATION LTD
PCS-974,PCS-9705,PCS-
9611.PCS-921,PCS-915
FUZHOU FENGNAN
RELAYS ELECTRIC
INDONESIA QINGSHAN STAINLESS STEEL
PCS-9693D,PCS-9693A,PCS-9691 POWER 2017/7/6 INDUSTRY INDONESIA
COMPANY PROJECT
TECHNOLOGY
CO.,LTD
CHANGYUAN
HONDURAS PATUCAIII POWER STATION SHENRUI RELAY
PCS-9882,PCS-996R 2017/7/6 POWER PLANT HONDURAS
PROTECT. AUTOMATION CO.
LTD.
SHANGHAI HENGYU
INDONESIA POSO 365 MW HYDROPOWER
SERVICE INTERNATIONAL 2017/7/7 SUBSTATION INDONESIA
STATION PROJECT
TRADE CO. LTD
TONGXIANG HUAYU
THE DEMOCRATIC REPUBLIC OF CONGO 122KV POWER
PCS-9882 2017/7/11 INDUSTRY CONGO, DEM. REP.
RUSI SUBSTATION PROJECT EQUIPMENT CO.
LTD.
MD1501,MD1701,PCS-931,
BANGLADESH GULACO POWER STATION ENERGY CHINA
CJX,PCS-9655,PCS-974,PCS- 2017/7/11 POWER PLANT BANGLADESH
PROJECT GPEC
985,PCS-9882
HEBEI ELECTRIC
POWER
INDONESIA'S SURABAYA PROJECT PCS-9691C 2017/7/12 POWER PLANT INDONESIA
EQUIPMENT
CO.,LTD
KUNMING
ZHONGHUA
THE CAMBODIAN TECHNICAL SERVICE. WORKSTATION 2017/7/13 SUBSTATION CAMBODIA
ECONOMIC AND
TRADE CO. LTD.
SHENYANG
ZHONGZHEN
TAJIK OIL 10KV REACTIVE POWER
PCS-9663D POWER 2017/7/17 INDUSTRY TAJIKISTAN
COMPENSATION PROJECT
TECHNOLOGY CO.
LTD.
SHANDONG LUDIAN
INDONESIA SHENHUA 2*350MV COAL FIRED CJX,PCS-974,PCS-985,PCS-
INTERNATIONAL 2017/7/19 POWER PLANT INDONESIA
PROJECT 996,PCS-986,PCS-9882
TRADING LIMITED
NANJING SETH
CAMBODIA 230 KV SUBSTATION LOOSE MOTONG
PCS-9611 2017/7/21 SUBSTATION CAMBODIA
RELAYS TECHNOLOGY CO.
LTD.
SHANDONG
ECUADOR ESMERALDA PROJECT AC DC FENGHUI
DC SYSTEM 2017/7/21 SUBSTATION ECUADOR
SYSTEM. LOGISTICS
TRADING CO. LTD.
CONSULTANT
VIETNAM DISTRIBUTION NETWORK SUPPLY PCS-9691 2017/7/21 SUBSTATION VIETNAM
EQUIPMENT AND
LJ POWER CO.,
VIETNAM VT4 LINE PROTECT PCS-931 2017/7/25 POWER PLANT VIETNAM
LTD.
NR ELECTRIC
HONG KONG POWERNETS LOOSE RELAY_430 PCS-9611,PCS-978 INTERNATIONAL 2017/7/26 SUBSTATION HONG KONG
COMPANY L
HANNAN PINGGAO
INDIA GUDBO EXPANSION S PROJECT PCS-9830B 2017/7/28 SUBSTATION INDIA
ELECTRIC CO.,LTD
MD1501,MD1701,MUX-
INDONESIA GIS 150 KV JATINEGARA 64D,PCS-902,PCS-915,PCS- PT. TIGA DIMENSI
2017/7/28 SUBSTATION INDONESIA
SUBSTATION AUTOMATION SYSTEM. 931,PCS-9611,PCS-9705, KARYA KONTRUKSI
PCS-978,PCS-9799,PCS-9882
MEXICO 120MVAR STATCOM+60MVAR FC PCS-9631,PCS-9671,PCS- GRUPO ACERERO
2018/8/24 INDUSTRY MEXICO
PROJECT 9785,PCS-9882 SA DE CV
CONGO, DEM. REP. HITULU COPPER MINE PCS-9611, PCS-9705B, PCS- CHINT ELECTRIC
2018/8/27 INDUSTRIAL CONGO, DEM. REP.
PROJECT 9794D, PCS-9882AD-S CO.,LTD
CHINA NATIONAL
BRUNEI PMB PETROCHEMICAL INDUSTRY ENERGY POWER
LOOSE RELAYS 2018/8/27 POWER PLANT BRUNEI
STATION EPC PROJECT ENGINEERING CO.
LTD.
PCS-902,PCS-915,PCS-921,PCS-
9611,PCS-9671,PCS-9705,PCS- L&T
BOTSWANA 400KV MAWANA PROJECT 2018/8/29 SUBSTATION BOTSWANA
9710,PCS-9785,PC-978,PCS- CONSTRUCTION
9794,PCS-9799,PCS-9882
PCS-9611,PCS-9671,PCS- NR ELECTRIC
KENYA KEMP COAST REGION LOT2 9705,PCS-9785,PCS-9794,PCS- INTERNATIONAL 2018/8/29 SUBSTATION KENYA
9799,PCS-9882 COMPANY L
SHENZHEN
XINWANGDA
BRITISH MALTON 5MW/5MWH ENERGY PCS-9567, PCS-9726A, PCS-9785,
INTEGRATED 2018/8/29 SUBSTATION UK
STORAGE SYSTEM PCS-9799D, PCS-9882BD-D, PCS-
ENERGY SERVICE
9882ED-D, PCS-9893C
CO., LTD.
PCS-902, PCS-915IC, PCS-931,
PCS-9611, PCS-9705A, PCS-9785, YANTAI DONGFANG
ZAMBIA ZESCO-141-2013 132KV STATION PCS-978, PCS-9794A, PCS-9799D, WISDOM ELECTRIC 2018/8/29 SUBSTATION ZAMBIA
PCS-9882BD-S, PCS-9882ED-S, CO., LTD.
MD1501, MD1701
JIANGSU JIYI
GHANA POWER PLANT I #4-#6 PROJECT CJX, PCS-974, PCS-985 INDUSTRIAL CO. 2018/8/30 POWER PLANT GHANA
LTD.
PENGXIN GLOBAL
CONGO, DEM. REP. HITULU COPPER MINE RCS-9611C, RCS-9613C RESOURCES CO., 2018/8/31 POWER PLANT CONGO, DEM. REP.
LTD.
SHANDONG
CJX, CZX-12G, PCS-902, PCS- ELECTRIC
INDONESIA WEST KALIMANTAN 2X100MW
915, PCS-931, PCS-921, PCS- CONSTRUCTION 2018/8/31 POWER PLANT INDONESIA
COAL-FIRED POWER PLANT
9882AD-S, PCS-996R, MD1501 IRON POWER
ENGINEERING CO.,
CJX, PCS-915ID, PCS-921, PCS-
931, PCS-9611, PCS-9705A, PCS-
CHINT ELECTRIC
SRI LANKA 245KV HAMBATOTA SUBSTATION 9705C, PCS-9785, PCS-978, PCS- 2018/8/31 POWER PLANT SRI LANKA
CO.,LTD
9882ED-S, RCS-9698H, MD1501,
MD1701
PCS-902, PCS-915, PCS-921,PCS- BEIJING GUODIAN
9611, PCS-9705A, PCS-9705C, NORTH CHINA
NIGERIA 132KV AMASIRI & ABAKALIKI
PCS-9785, PCS-9794A, PCS- ELECTRIC POWER 2018/8/31 SUBSTATION NIGERIA
SUBSTATION
9799D, PCS-9882AD-S, PCS- ENGINEERING CO.,
996R, RCS-9661C, MD1501, LTD.
PCS-9567,PCS-9617,PCS-
GUNKUL POWER
THAILAND ILAND PEA MAESARIANG 9651,PCS-9710,PCS-9721,PCS-
DEVELOPMENT 2018/8/31 SUBSTATION THAILAND
MICROGRID PROJECT 9726,PCS-9785,PCS-9794,PCS-
COMPANY
9882,PCS-9892,PCS-9895
FUZHOU FENGNAN
RELAYS ELECTRIC
INDONESIA POWER PLANT II PCS-9691C POWER 2018/9/4 INDUSTRIAL INDONESIA
TECHNOLOGY
CO.,LTD
NARI BRASIL
BRAZIL TPT I SPARE PARTS MUX,PCS-902,PCS-915 2018/9/4 SUBSTATION BRAZIL
HOLDING LTDA.
NR ELECTRIC
HONG KONG CLP LOOSE RELAY_180828 PCS-9611 INTERNATIONAL 2018/9/4 SUBSTATION HONG KONG
COMPANY L
FUJIAN ELECTRIC
POWER
PHILIPPINES 69KV EASTERN ALBAY PROJECT PCS-974C 2018/9/4 SUBSTATION PHILIPPINES
ENGINEERING CO.,
LTD.
PCS-902,PCS-931,PCS-915,PCS-
ETHIOPIA ADAMA II LOT 1 TRANSMISSION 9611,PCS-9705,PCS-974,PCS- SIEYUAN ELECTRIC
2019/9/29 SUBSTATION ETHIOPIA
PROJECT 978,PCS-9785,PCS-9794,PCS- CO., LTD
9799,PCS-9882,MD1501,MD1701
MUX,PCS-931,PCS-9611,PCS-
PT. NR ELECTRIC
INDONESIA GI BUNTUK AND GI KALSELTENG 1 9705,PCS-978,PCS- 2019/9/29 SUBSTATION INDONESIA
JAKARTA
9882,MD1501,MD1701
CHINA MACHINERY
PCS-9705,PCS-9794,PCS-
MALAYSIA 45MWP BGMC PROJECT EQUIPMENT HONG 2019/9/29 SUBSTATION MALAYSIA
9799,PCS-9882
KONG CO., LTD.
POWER
PHILIPPINES 230KV NORTH LUZON MUX,PCS-931,PCS-9785,PCS- CONSTRUCTION
2019/9/29 SUBSTATION PHILIPPINES
SUBSTATION SUBSTATION 9882,PCS-996 CORPORATION OF
CHINA
CHINA ELETRIC
POWER
ETHIOPIA QORIE, MINO, UNGOGE, ALBASA PCS-9617,PCS-9705,PCS-
EQUIPMENT AND 2019/9/30 POWER PLANT ETHIOPIA
MICROGRID PROJECT 9785,PCS-9794,PCS-9882
TECHNOLOGY CO.,
LTD.
SEPCOIII ELECTRIC
UNITED ARAB EMIRATES DUBAL 550MW POWER
PCS-9705,PCS-9882 2019/9/30 POWER PLANT UAE
COMBINED CYCLE POWER PLANT CONSTRUCTION
CORPORATION
PCS-9705,PCS-9799,PCS-
9882,RCS-9698,RCS-9702,RCS- S.M.O.N TRADING
CAMBODIA EDC 2019 SPARE PARTS 2019/9/30 SUBSTATION CAMBODIA
9703,RCS-9698,RCS-9705,RCS- CO., LTD
9709,RCS-9785,RCS-9794
YOTEK JOINT
VIETNAM 220KV LAO CAI SUBSTATION MUX,PCS-931 2019/10/8 SUBSTATION VIETNAM
STOCK COMPANY
CHINT ELECTRIC
PAKISTAN NTDC 220KV AIS PROJECT SPARE PARTS 2019/10/9 SUBSTATION PAKISTAN
CO.,LTD
CJX,CZX,PCS-931,PCS-9611,PCS-
SHANGHAI DINGXIN
INDONESIA WEIDABE 150KV 2 # 3 # 9621,PCS-9631,PCS-9651,PCS-
INVESTMENT 2019/10/10 POWER PLANT INDONESIA
SUBSTATION PROJECT 9662,PCS-9705,PCS-974,PCS-
(GROUP) CO., LTD.
978,PCS-9882,PCS-996RA
S.M.O.N TRADING
CAMBODIA EDC 2019 SCADA SPARE PARTS RCS-9698,RCS-9705,RCS-9785 2019/10/10 SUBSTATION CAMBODIA
CO., LTD
THAILAND EGAT FEEDER PROTECTION DEVICE PCS-9611 SIEMENS LTD 2019/10/11 SUBSTATION THAILAND
YOTEK JOINT
VIETNAM 220KV THAP CHAM STATION SERVICE SERVICE 2019/10/14 SUBSTATION VIETNAM
STOCK COMPANY
PT. NR ELECTRIC
INDONESIA CILACAP POWER PLANT MODULE 2019/10/16 POWER PLANT INDONESIA
JAKARTA
PCS-902,PCS-931,PCS-9611,PCS- VISION
BRAZIL CEMIG-D LOOSE RELAYS 9705,PCS-978,PCS-9785,PCS- ENGENHARIA E 2019/10/16 SUBSTATION BRAZIL
9799,PCS-9882 CONSULTORIA LTD
PCS-221,PCS-9570,PCS-
INDIA 400 / 220KV JEYPORE, RENGALI AND POWER GRID
9705,PCS-996R,MD1501, 2019/11/28 SUBSTATION INDIA
BALLABHGARH SUBSTATION CORPORATION OF
MD1701
PCS-902,PCS-915,PCS-9611,PCS-
9705,PCS-9785,PCS-978,PCS-
EGYPT 66KV BENI SWEF SUBSTATION ENBLOM 2019/11/28 SUBSTATION EGYPT
9794,PCS-9799,PCS-9882,PCS-
9884,MD1501,MD1701
SHANDONG LUDIAN
INDONESIA JAVA 7 2×1050MW COAL-FIRED CJX,PCS-9655,PCS-974,PCS-
INTERNATIONAL 2019/11/28 SUBSTATION INDONESIA
POWER PROJECT 985,PCS-986,PCS-9882
TRADE CO., LTD.
JIANGSU
HAIFATONG
INDONESIA KALBAR-1 2 × 100 MW COAL-FIRED
PCS-9641 POWER 2019/11/29 POWER PLANT INDONESIA
POWER STATION PROJECT
ENGINEERING CO.,
LTD.
BEIJING
LAOS LUANG PRABANG 2000T / D CLINKER
PCS-931,PCS-9611 ZHANHONG 2019/11/29 INDUSTRY LAOS
PRODUCTION LINE PROJECT
ELECTRIC CO.,LTD
CJX,PCS-902,PCS-915,PCS-
NR ENERGY
921,PCS-9611,PCS-9705,PCS-
INDIA PGCIL 400KV SIMBHAVALI SS SOLUTIONS INDIA 2019/11/29 SUBSTATION INDIA
978,PCS-9794,PCS-996,RCS-
PVT. LTD.
9787,MD1501,MD1701
PCS-902,PCS-915,PCS-931,PCS-
9611,PCS-9705,PCS-978,PCS-
EGYPT 66KV TEBIN SUBSTATION ENBLOM 2019/11/29 SUBSTATION EGYPT
9794,PCS-9799,PCS-9882,PCS-
9884,MD1501,MD1701
PCS-902,PCS-915,PCS-921,PCS-
9611,PCS-9671,PCS-9705,PCS- SIEYUAN ELECTRIC
NIGERIA NIGERIA TNC-PIU-LOT5 & 6 PROJECT 2019/11/29 SUBSTATION NIGERIA
9799,PCS-9882,PCS- CO., LTD
996R,MD1501
PCS-902,PCS-915,PCS-9611,PCS- VISION
BRAZIL CEMIG-D LOOSE RELAYS 9705,PCS-9785,PCS-978,PCS- ENGENHARIA E 2019/12/2 SUBSTATION BRAZIL
9882 CONSULTORIA LTD
JIANGXI
SHENGGUANG
INDONESIA FAJAR 1X55MW COAL FIRED
PCS-9659 ELECTRIC POWER 2019/12/3 POWER PLANT INDONESIA
POWER PLANT
ENGINEERING CO.,
LTD.
RIZHAO SIMMENT
CEMENT
INDONESIA SB1 EPC PROJECT RCS-9624CN 2019/12/3 INDUSTRY INDONESIA
TECHNOLOGY CO.,
LTD.
NR ENERGY
INDIA TNEB 400KV THIRUVALAM SS SPARE PARTS SOLUTIONS INDIA 2019/12/3 SUBSTATION INDIA
PVT. LTD.
SHANGHAI NASIN
SERBIA KOSTOZLA POWER PLANT PCS-985 2019/12/4 POWER PLANT SERBIA
INDUSTRY CO., LTD.
PCS-902,PCS-915,PCS-9611,PCS- JSC «
TAJIKISTAN 110KV ROMIT SUBSTATION 9705,PCS-974,PCS- TOJIKGIDROELEKT 2019/12/4 SUBSTATION TAJIKISTAN
978,MD1501,MD1701 ROMONTAJ»
SCI ELECTRIC
THAILAND EGAT TS12-S-19 SARABURI 6
PCS-931,PCS-9611,PCS-978 PUBLIC COMPANY 2019/12/4 SUBSTATION THAILAND
SUBSTATION
LIMITED
CJX,PCS-902,PCS-915,PCS-
NR ENERGY
9611,PCS-9671,PCS-9705,PCS-
INDIA KPTCL 220KV MUGHELKHOD SS SOLUTIONS INDIA 2019/12/5 SUBSTATION INDIA
9785,PCS-978,PCS-9794,PCS-
PVT. LTD.
9799,PCS-9882,MD1501,MD1701
YOTEK JOINT
VIETNAM 220KV BIM SON SUBSTATION PCS-915,PCS-9611,PCS-9705 2019/12/5 SUBSTATION VIETNAM
STOCK COMPANY
CONECTA
CHILE CONECTA DEMO SYSTEM PCS-931,PCS-9641,PCS-978 2019/12/6 INDUSTRY CHILE
INGENIERIA S.A.
CJX,CZX,MUX,PCS-915IC,PCS-
THE PHILIPPINES 500KV MARILAO SUBSTATION 921,PCS-931,PCS-9611,PCS- LARSEN & TOUBRO
ORDERS PROTECTION INTEGRATED 9705C,PCS-9705CS,PCS- LIMITED, 2020/4/29 SUBSTATION PHILIPPINES
AUTOMATIC SYSTEM 978,PCS-9785,PCS-9794DS,PCS- CONSTRUCTIO
9798A,PCS-9799DS,PCS-
ARAVALI
ADANI ALWAR SUBSTATION SPARES PCS-9705A TRANSMISSION 2020/5/7 SUBSTATION INDIA
SERVICE COMPAN
FUZHOU FENGNAN
INDONESIA QINGSHAN STAINLESS STEEL RELAYS ELECTRIC
NICKEL-IRON DRYING KILN AND WEIDABE PCS-9693A,PCS-9693D POWER 2020/5/8 INDUSTRIAL INDONESIA
PROJECT TECHNOLOGY
CO.,LTD
NGK INSULATORS,
JAPAN YAMAICHI 400KW NAS PCS-9726,PCS-9882,PCS 2020/5/9 SUBSTATION JAPAN
LTD.
TBEA XINJIANG
EGYPT SUN RISE SOLAR 60MW DEVELOPMENT
PCS-915,PCS-9611 NEW ENERGY CO., 2020/5/11 POWER PLANT EGYPT
PROJECT SCADA SPARE PARTS
LTD.
FUZHOU FENGNAN
RELAYS ELECTRIC
INDONESIA KOYAMA SMELTING CO., LTD.
PCS-9693A,PCS-9693D POWER 2020/5/12 INDUSTRIAL INDONESIA
NICKEL-IRON PROJECT SUPPLEMENT
TECHNOLOGY
CO.,LTD
NATIONAL GRID
NATIONAL GRID GRIMSBY WEST-SOUTH PCS-902,PCS-931,PCS-9785,PCS-
ELECTRICITY 2020/5/15 SUBSTATION UK
HUMBERBANK SPAR 9882
TRANSMIS
TAMILNADU
INDIA TNEB 220KV NALLAMANAICKENPATTI SS RELAY 2020/5/15 SUBSTATION INDIA
TRANSMISSION C
ADVANCED
VIETNAM TEXHONG INDUSTRIAL PARK PCS-9611S,PCS-9785,PCS-
INFORMATION 2020/5/15 SUBSTATION VIETNAM
PROJECT 9794,PCS-9882
TECHNOLOGIES C
MD1501,MD1701,PCS-902,PCS-
915,PCS-9611,PCS-9705,PCS-
EGYPT 220KV EI KOM EI AHMAR SS GIZA SYSTEMS 2020/5/21 SUBSTATION EGYPT
978,PCS-9785,PCS-9882.PCS-
9884,PCS-9794,PCS-9799
CLP POWER HONG
HONG KONG CLP SERVICE_201109 SEVER 2012 2020/11/10 SUBSTATION HONG KONG
KONG LIMITED
SHANGHAI NASIN
INDONESIA QINGSHAN 350MW PROJECT PCS-985RE 2020/11/10 INDUSTRIAL INDONESIA
INDUSTRY CO., LTD.
MAAMBA
ZAMBIA MAAMBA NON-POWER PROTECTION
MODULE COLLIERIES 2020/11/10 POWER PLANT ZAMBIA
POWER BOARD
LIMITED
ZHEJIANG
INDONESIA GEELIPDO SECOND PHASE SPARE THERMAL POWER
MODULE 2020/11/11 POWER PLANT INDONESIA
PARTS CONSTRUCTION
COMPANY
SHENZHEN YITE
DEMOCRATIC REPUBLIC OF CONGO KAIPENG
RCS-9681C SUPPLY CHAIN CO., 2020/11/12 INDUSTRIAL CONGO (DRC)
TONGKUANG
LTD.
MD1501,MUX-64D,PCS-931,PCS-
PT. INFORMATION
INDONESIA 150KV LAPO SUMBA 9611,PCS-9705,PCS-9785,PCS- 2020/11/13 SUBSTATION INDONESIA
DATASYSTEM
9882BD,PCS-996R
YOTEK JOINT
VIETNAM VINH TAN SUBSTATION PCS-931 2020/11/16 SUBSTATION VIETNAM
STOCK COMPANY
PT BIRA JAYA
INDONESIA 150KV GI JATIWARINGIN PCS-9799D,PCS-9882BD 2020/11/17 SUBSTATION INDONESIA
MANDIRI PERKASA
LJ POWER CO.,
KOREA KEPCO 154KV SUBSTATION PCS-931,PCS-9611S 2020/11/17 SUBSTATION SOUTH KOREA
LTD.
PCS-9700,CJX-02,PCS-
BULGARIA SVILOCELL BIOMASS POWER 9611S,PCS-9659D,PCS-9705,PCS- JINAN BOILER
2020/11/19 POWER PLANT BULGARIA
GENERATION PROJECT 9785,PCS-9794A,PCS- GROUP CO., LTD
985GE,PCS-9882AD,PCS-9691
MD1501,MD1701,PCS-9700,MUX-
2MD,PCS-902,PCS-915IC,PCS- NARI TECHNOLOGY
EGYPT RAILWAY PROJECT ON THE 10TH OF
931,PCS-9611,PCS-9688T,PCS- DEVELOPMENT 2020/11/20 INDUSTRIAL EGYPT
RAMADAN
9705C,PCS-9785,PCS-978,PCS- CO.,LTD
9794D,PCS-9799D,PCS-
NR Reference in Tanzania
No. Project Main Product Client Status
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
400kV Singida
1 TANESCO Construction
Substation
Protection Relay:
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
400kV Dodoma (ZuZu)
2 TANESCO Construction
Substation
Protection Relay:
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
400kV LEMUGUR
3 TANESCO Construction
Substation
Protection Relay:
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
220kV Nyakanazi
4 TANESCO Construction
Substation
Protection Relay:
Protection Relay:
220kV Ubungo
5 TANESCO Construction
Substation
PCS931S / PCS902 / MD1501
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
220kV Buluyanhulu
6 TANESCO Operation
Substation
Protection Relay:
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
220kV Makambako
7 TANESCO Operation
Substation
Protection Relay:
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
220kV Songea
8 TANESCO Operation
Substation
Protection Relay:
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
220kV Madaba
9 TANESCO Operation
Substation
Protection Relay:
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
220kV Iringa
10 TANESCO Operation
Substation
Protection Relay:
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
220kV Dodoma
11 TANESCO Operation
Substation
Protection Relay:
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
220kV Singida
12 TANESCO Operation
Substation
Protection Relay:
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
220kV Shinyanga
13 TANESCO Operation
Substation
Protection Relay:
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
220kV Geita
14 TANESCO Construction
Substation
Protection Relay:
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
220kV Lugurini
15 TANESCO Construction
Substation
Protection Relay:
Substation SCADA:
PCS-9710
220kV Mtera
16 TANESCO Construction
Substation
Protection Relay:
PCS-915,PCS-9611,PCS-9705,PCS-9710,PCS-978
Address: 69, Suyuan Avenue, Jiangning, Nanjing, China
Tel: +86-25-87178888 Fax: +86-25-87178999
E-mail:NRsales@nrec.com http://www.nrec.com
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
132kV Majani Mapana
17 TANESCO Construction
Substation
Protection Relay:
Protection Relay:
132kV Kunduchi
18 TANESCO Construction
Substation
PCS978 PCS9611 MD1501
Protection Relay:
132kV MBEYA
19 TANESCO Operation
SUBSTATION
RCS-9665, RCS-9671C, PCS-9611
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
132 kV URAMBO
20 TANESCO Construction
Substation
Protection Relay:
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
132 kV NGURUKA
21 TANESCO Construction
Substation
Protection Relay:
Protection Relay:
132 kV Tabora
22 TANESCO Construction
Substation
PCS902S PCS-921S PCS978S PCS915S PCS9611S
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
132 kV IPOLE
23 TANESCO Construction
Substation
Protection Relay:
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
132 kV Inyonga
24 TANESCO Construction
Substation
Protection Relay:
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
132 kV Mpanda
25 TANESCO Construction
Substation
Protection Relay:
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
33kV Ubungo
26 TANESCO Construction
Substation
Protection Relay:
Protection Relay:
33kV Mzakawe
27 TANESCO Operation
SUBSTATION
PCS-915S PCS-978S PCS611S MD1501
Protection Relay:
28 TANGA SUBSTATION TANESCO Operation
RCS-9631C
Protection Relays:
29 Supply of Spare Relay TANESCO Construction
PCS978 PCS9611
Protection Relays:
Supply of Spare Relay-
30 TANESCO Construction
Lot1
PCS-931/PCS-902/PCS978/ PCS9611
Protection Relay:
31 33kV TOL substation TANESCO Operation
RCS-9671, RCS-9681, RCS-9611, RCS-9661
Substation SCADA:
Thisis to certificate
thatNR ElectricCo.,Ltd.Withaddressat No.99, Shengtai
Road,JiangningNanjing,P.R. China 211100,whose productshave been
appliedfor NGGP500kVSan Jose SubstationProjectin Philippines.The
productshave been successfully energizedin 500kVSan Jose Substation
since2010.5as follows:
PCS-978 Transformer
ProtectionRelay,4 Sets.
Thankyou.
BestRegards.
Date: 2012-2-1
VERIFICATION REPORT
Reference to part of this verification report which may lead to misinterpretation is not permissible. The Rules and regulations for an
Attestation of Conformity or a Certificate based on testing of communication interfaces performed by DNV GL, June 2014 is applicable
2 REFERENCES .................................................................................................................. 5
2.1 Normative 5
2.2 Other 5
APPENDIX A ................................................................................................................................ 1
A1 Documentation (IEC 61850-4) 1
A2 Configuration file (IEC 61850-6) 2
A3 Data model (IEC 61850-7-3 and IEC 61850-7-4) 3
A4 Mapping of ACSI models and services (IEC 61850-7-2 and applicable SCSM) 6
A4.1 Application association 10
A4.2 Server & Logical Device & Logical Node & Data 14
A4.3 Data set 21
A4.4 Service Tracking 25
A4.5 Substitution 29
A4.6 Setting group control 31
A4.7 Unbuffered Reporting 40
A4.8 Buffered Reporting 53
A4.10a GOOSE Publish 72
A4.10b GOOSE Subscribe 78
A4.11 Control 85
A4.11a Control DOns 97
A4.11b Control SBOns 98
A4.11c Control DOes 100
A4.11d Control SBOes 102
A4.12 Time synchronization 105
A4.13 File transfer 108
1.1 Identifications
The following table gives the exact identification of tested equipment and test environment used for this
conformance test.
PCS-9611S
FEEDER RELAY
Communication software version: Ed2 2.00
DUT (fully tested)
Application software version: 1.00
Hardware version: NR6106-3
S/N: 3P2318150430T
NR Electric CO., Ltd.
69 Suyuan Avenue
MANUFACTURER
211102 Nanjing
China
PICS PICS for the IEC61850 Ed2 interface in PCS-S Product Family V1.0
MICS MICS for the IEC61850 Ed2 interface in PCS-S Product Family V1.0
TICS TICS for the IEC61850 Ed2 interface in PCS-S Product Family V1.0
PIXIT PIXIT for the IEC61850 Ed2 interface in PCS-S Product Family V1.0
ICD PCS-9611S.cid
SCD PCS-9611S.icd
TEST INITIATOR NR Electric CO., Ltd.
DNV GL Netherlands B.V.
Protocol Competence & Test Center
TEST FACILITY
Utrechtseweg 310-B50, Arnhem, The Netherlands
Accredited as independent Level A test lab by the UCAiug
TEST ENGINEER Sjoerd Willemsen<Sjoerd.Willemsen@dnvgl.com>
TEST SESSION May, Nanjing China
CLIENT SIMULATOR Unigrid 1.4
ANALYSER UniCA 61850 Analyzer 5.31.01
EQUIPMENT SIMULATOR Omicron ISIO-200
TIME MASTER DNVGL_SNTP.exe
PCS-902S LINE DISTANCE RELAY
PCS-931S LINE DIFFERENTIAL RELAY
DUT variants partly PCS-978S TRANSFORMER RELAY
tested PCS-9705S BAY CONTROL UNIT
PCS-915SC BUSBAR RELAY
PCS-902S.icd
PCS-931S.icd
ICD variants PCS-978S.icd
PCS-9705S.icd
PCS-915SC.icd
“Does the protocol implementation of the DUT conform to the Edition 2 of the IEC 61850 standard and the PICS, MICS,
PIXIT and ICD specifications as configured with SCD?”
To answer this question, TEST FACILITY has performed a conformance test of the IEC 61850
implementation in the DUT. This test has been performed according procedures and conditions set forth
in IEC 61850 part 10 and UCAIUG Quality Assurance Program.
TEST FACILITY is accredited/recognized by the UCAIUG to perform formal conformance tests and issue
the Level A UCAIUG certificate.
The described procedures and test results are the basis for the DNV GL Attestation of Conformity and the
UCAIug Level A certificate.
Chapter 3 describes the various relevant components for the conformance test and their configuration as
used in the conformance test, including the DUT. This chapter also gives an overview and introduction to
the various test groups that together constitute the conformance test.
Chapter 4 and 5 give an overview and summary of the test results, the conclusion(s) and
recommendations.
1.5 Glossary
2.1 Normative
The tests defined in this document are based on the following IEC 61850 documents.
IEC 61850-4, Communication networks and systems for power utility automation – Part 4: System and
project management; Edition 2.0; 2011-04.
IEC 61850-6, Communication networks and systems for power utility automation – Part 6: Configuration
description language for communication in electrical substations related to IEDs; Edition 2.0; 2009-12.
IEC 61850-7-1, Communication networks and systems for power utility automation – Part 7-1: Basic
communication structure – Principles and models; Edition 2.0; 2011-07.
IEC 61850-7-2, Communication networks and systems for power utility automation – Part 7-2: Basic
information and communication structure – Abstract communication service interface (ACSI); Edition 2.0;
2010-08.
IEC 61850-7-3, Communication networks and systems for power utility automation – Part 7-3: Basic
communication structure – Common data classes; Edition 2.0; 2010-12.
IEC 61850-7-4, Communication networks and systems for power utility automation – Part 7-4: Basic
communication structure – Compatible logical node classes and data object classes; Edition 2.0; 2010-03.
IEC 61850-8-1, Communication networks and systems for power utility automation – Part 8-1: Specific
communication service mapping (SCSM) – Mappings to MMS (ISO/IEC 9506-1 and ISO/IEC 9506-2) and
to ISO/IEC 8802-3; Edition 2.0; 2011-06.
IEC 61850-10, Communication networks and systems for power utility automation – Part 10:
Conformance testing; Edition 2.0; 2012-12.
2.2 Other
IS 9646 – OSI – Conformance testing methodology and framework.
UCA International User Group: Conformance Test Procedures for Server Devices with IEC 61850-8-1
Edition 2 Interface Revision 1.0, April 2013.
UCA International User Group: Fast Track Test Procedures Change List (TPCL) version 1.2.4 for IEC
61850 Edition 2 server test procedures revision 1.0
UCA International User Group: Quality Assurance Program for IEC Device Implementation Testing and
Test System Accreditation and Recognition, Version 2.0, 17 June, 2006.
UCA International User Group: Quality Assurance Program Addendum for IEC 61850 Specific Product
Testing, Version 1.0, March 8, 2006.
http://tissues.iec61850.com/.
CLIENT SIMULATOR
Ethernet switch
Device Under
ANALYZER Time Master
Test (DUT)
EQUIPMENT SIMULATOR
The PICS is used to select the applicable test procedures to be included in the test.
1: Basic Exchange sAss1, sAss2, sAss3, sAssN2, sAssN3, sAssN6, sSrv6, sSrv8, sSrv11, sSrv12,
sAssN4, sAssN5, sSrv1, sSrv2, sSrv3, sSrvN1e, sSrvN1f, sSrvN2, sSrvN3
sSrv4, sSrv5, sSrvN1abcd, sSrvN4
2: Data Sets sDs1, sDs10a, sDsN1ae sDs15
3: Substitution sSub1, sSub2, sSub3
4: Setting Group sSg1, sSg3, sSgN1 sSg11
Selection
4+: Setting Group sSg2, sSg4, sSg7, sSg8, sSg10, sSg12, sSg5, sSg9
Definition sSgN2, sSgN3, sSgN4, sSgN5
5: Unbuffered sRp1, sRp2, sRp3, sRp4, sRp5, sRp9, sRp8, sRp10, sRp11, sRp12, sRpN5
Reporting sRp14, sRp15, sRpN1, sRpN2, sRpN3,
sRpN4, sRpN8
6: Buffered Reporting sBr1, sBr2, sBr3, sBr4, sBr5, sBr9, sBr8, sBr10, sBr11, sBr12, sBr23, sBr24
sBr14, sBr15, sBr20, sBr21, sBr22,
sBr25, sBr26, sBr27, sBr28, sBrN1,
sBrN2, sBrN3, sBrN4, sBrN5, sBrN8
9a: GOOSE publish sGop2a, sGop3, sGop4, sGop9, sGop10, sGop1, sGop5, sGop6, sGop7, sGopN1,
sGop11 sGopN2
9b: GOOSE subscribe sGos1, sGos2, sGos3, sGos5, sGos6a, sGos4, sGos6b
sGos7, sGosN1, sGosN2, sGosN3,
sGosN4, sGosN5, sGosN6
12a: Direct control sCtl5, sCtl10, sDOns1, sDOns2 sCtl2, sCtl7, sCtl13, sCtl15, sCtl16, sCtl17,
sCtl18, sCtl19
12b: SBO control sCtl5, sCtl8, sCtl9, sCtl10, sCtl11, sCtl2, sCtl4, sCtl6, sCtl7, sCtl15, sCtl16,
sCtl25, sSBOns1, sSBOns2, sSBOns6 sCtl17, sCtl18, sCtl19, sCtl27
12c: Enhanced Direct sCtl5, sCtl10, sDOes1, sDOes2 sCtl2, sCtl7, sCtl13, sCtl14, sCtl15, sCtl16,
Control sCtl17, sCtl18, sCtl19, sCtl26
12d: Enhanced SBO sCtl5, sCtl8, sCtl9, sCtl10, sCtl11, sCtl2, sCtl4, sCtl6, sCtl7, sCtl15, sCtl16,
Control sCtl25, sSBOes1, sSBOes2, sSBOes6, sCtl17, sCtl18, sCtl19, sCtl26
sSBOes8
13: Time sync sTm1, sTm2, sTmN1 sTm3
14: File transfer sFt1, sFt2ab, sFt4, sFt5, sFtN1ab sFt2c, sFtN1c
15: Service tracking sTrk1, sTrk2, sTrk3, sTrk4, sTrk7, sTrk8,
sTrk9, sTrk17
-None
Check if the major/minor software version in the PICS documentation and the DUT Passed
sDoc1 do match (IEC61850-4). PICS shall contain the ACSI conformance statement Failed
according to IEC 61850-7-2 Annex A Inconclusive
PIXIT shall keep the entry identifiers from the PIXIT template
Check if the major/minor software version in the MICS documentation and software Passed
sDoc3 version of the DUT does match (IEC61850-4). MICS shall indicate the semantics of Failed
all non-standard Logical Nodes, Data Objects and enumerations Inconclusive
Check if the major/minor software version in the TICS documentation and software Passed
sDoc4 version of the DUT does match (IEC61850-4). TICS shall indicate that the Failed
mandatory and applicable technical issues are implemented Inconclusive
Passed
Test if the ICD configuration file validates according to the SCL schema: version
sCnf1 Failed
2007, revision B
Inconclusive
Check if the SCL configuration file used to configure the DUT corresponds with the
actual data object references, data types, data sets and pre-configured data values
Passed
(settings) exposed by the DUT on the network.
sCnf2 Failed
When more data objects are exposed, attach a list and set the test result to
Inconclusive
Passed. When less data objects are exposed the test result is Failed.
The format of the pre-configured values in SCL shall match IEC 61850-6 Table 45
Change at least 5 configurable parameters that are exposed by the DUT on the
network in the SCD configuration file, configure the DUT using the SCD Passed
sCnf3 configuration file (using the supplied configuration tool) and check the updated Failed
configuration using online services corresponds with the updated SCD file. Restore Inconclusive
the original SCD file and re-configure the DUT to its original state.
Passed
Check the ICD if the server capabilities in the IED “services” section(s) do
sCnf4 Failed
correspond with the ACSI services specified in the PICS (compare TISSUE #901)
Inconclusive
Passed
In case the control model is fixed (PIXIT) check if the ICD correctly initializes the
sCnf5 Failed
ctlModel values for all controllable objects
Inconclusive
Passed
sCnf6 Check the SCL version = "2007", revision = "B" and nameLength = 64 Failed
Inconclusive
Check the "ldName" naming structure when supported. All online object references Passed
(including data sets, control block references and object references - CDC ORG) Failed
sCnf7
shall start with the "LDevice ldName" value instead of the "IED name" + "LDevice Inconclusive
inst" Not applicable
Passed
When GOOSE subscription is supported and when SICS I43 is supported, check
Failed
sCnf8 that the IED does subscribe to the data attributes as specified in the IID or SCD
Inconclusive
Inputs – ExtRef elements.
Not applicable
The BDA for SBOw, Oper and Cancel DAtype’s and DA SBO shall be followed by a
Passed
ProtNS element with type = 8-MMS and its contents = IEC61850-8-1:2003 or
sCnf9 Failed
IEC61850-8-1:2007
Inconclusive
(IEC 61850-8-1 Subclause 25.5, TISSUE #853)
Passed
Verify presence of mandatory data objects for each LN type and data attributes for
sMdl1 Failed
each DO type. Passed when all objects/attributes are present
Inconclusive
Passed
Verify presence of conditional presence true data objects for each LN type and data
sMdl2 Failed
attributes for each DO type. Passed when all objects/attributes are present
Inconclusive
Verify non-presence of conditional presence false data objects for each LN type and Passed
sMdl3 data attributes for each DO type. Passed when these objects/attributes are not Failed
present Inconclusive
Passed
Verify data model mapping according to applicable SCSM concerning name length
sMdl4 Failed
and object expansion. Passed when mapping is according to applicable SCSM
Inconclusive
Verify data model mapping according to applicable SCSM concerning naming of Passed
sMdl6 control blocks and logs. Passed when mapping is according to applicable SCSM. Failed
Compare detailed test procedure Inconclusive
Verify type of all data objects for each LN type and all data attributes for each DO Passed
sMdl7 type. Passed when type of all objects/attributes do match with the IEC 61850-7-3, Failed
IEC 61850-7-4 and the applicable SCSM Inconclusive
Passed
Verify that the preconfigured enumerated data attribute values from the device and
sMdl8 Failed
SCL are in specified range. Passed when all values are in range
Inconclusive
Passed
Check if manufacturer specific data model extensions are implemented according to
sMdl9 Failed
the extension rules in IEC 61850-7-1 clause 14. Compare detailed test procedure
Inconclusive
Check if the order of the data attributes with the same functional constraint of the Passed
sMdl10 DO type match with IEC 61850-7-3. Passed when all attributes are in matching Failed
order Inconclusive
Check if the name length of IED, Logical Devices, Logical Nodes, data objects, data Passed
sMdl11 attributes, data sets and control blocks do not exceed the maximum length as Failed
specified in IEC 61850-7-2 clause 22.2 and SCSM Inconclusive
Passed
Check that the rules for multiple data object instantiation are kept (IEC 61850-7-1
sMdl12 Failed
clause 14.6, IEC 61850-7-4).
Inconclusive
Check if the logical device name space or the LLN0 logical node name space refers Passed
sMdl13 to Edition 2: IEC 61850-7-4:2007 or a newer revision of edition 2 (e.g. IEC 61850- Failed
7-4:2007B) Inconclusive
Passed
Check the correct use of name spaces for non-substation power utility applications Failed
sMdl14
like for example Hydro and DER. Compare detailed test procedure Inconclusive
Not applicable
ÜÒÊ ÙÔ Ò»¬¸»®´¿²¼- ÞòÊò ˬ®»½¸¬-»©»¹ íïðóÞëðô êèïî ßÎ ß®²¸»³ô ÐòÑò Þ±¨ çðíëô êèðð ÛÌ ß®²¸»³ô ¬¸» Ò»¬¸»®´¿²¼-
Ì õíï îê íëê çïïï Ú õíï îê íëï íê èí -¿´»-¼»-µà¼²ª¹´ò½±³ ©©©ò¼²ª¹´ò½±³ п¹» îñî
EMC TEST REPORT
No. 4852018222601
DIRECTORY - EMISSIONS
Pages
A) Documentation
Test Report 1 – 12
Directory 2
Test Regulations 3
B) Test Data
C) Appendix A
D) Appendix B
E) Appendix C
Title: EMC EMISSION Test Report Form ID-Number: EMC_WUX_F_25.01E Phone: +86 510 8820 3737 TÜV SÜD Certification and Testing (China)
Revision: 5.1 Author: Xiao Liu Fax: +86 510 8820 3636 Co., Ltd.
Effective: 2016-11-21 www.tuv-sud.cn
Developed: 2016-11-15 No.10 Huaxia Road (M), Dongting,
Wuxi, 214100
P.R.China
Page 3 of 16
Report Reference No.: 4852018222601
- EN 61000-6-3:2007
- EN 55013:2001/A2:2006
- EN 61000-3-2:2006/A1:2009/A2:2009
- EN 61000-3-3:2013
Title: EMC EMISSION Test Report Form ID-Number: EMC_WUX_F_25.01E Phone: +86 510 8820 3737 TÜV SÜD Certification and Testing (China)
Revision: 5.1 Author: Xiao Liu Fax: +86 510 8820 3636 Co., Ltd.
Effective: 2016-11-21 www.tuv-sud.cn
Developed: 2016-11-15 No.10 Huaxia Road (M), Dongting,
Wuxi, 214100
P.R.China
Page 4 of 16
Report Reference No.: 4852018222601
Symbol Definitions:
- Applicable
- Not Applicable
Title: EMC EMISSION Test Report Form ID-Number: EMC_WUX_F_25.01E Phone: +86 510 8820 3737 TÜV SÜD Certification and Testing (China)
Revision: 5.1 Author: Xiao Liu Fax: +86 510 8820 3636 Co., Ltd.
Effective: 2016-11-21 www.tuv-sud.cn
Developed: 2016-11-15 No.10 Huaxia Road (M), Dongting,
Wuxi, 214100
P.R.China
Page 5 of 16
Report Reference No.: 4852018222601
The CONDUCTED EMISSIONS (INTERFERENCE VOLTAGE) measurements were performed at the following test
location:
- Test Area - C
Title: EMC EMISSION Test Report Form ID-Number: EMC_WUX_F_25.01E Phone: +86 510 8820 3737 TÜV SÜD Certification and Testing (China)
Revision: 5.1 Author: Xiao Liu Fax: +86 510 8820 3636 Co., Ltd.
Effective: 2016-11-21 www.tuv-sud.cn
Developed: 2016-11-15 No.10 Huaxia Road (M), Dongting,
Wuxi, 214100
P.R.China
Page 6 of 16
Report Reference No.: 4852018222601
The RADIATED EMISSIONS (MAGNETIC FIELD) measurements were performed at the following test location:
- Test Area -
- 2 meters
- __ meters
Title: EMC EMISSION Test Report Form ID-Number: EMC_WUX_F_25.01E Phone: +86 510 8820 3737 TÜV SÜD Certification and Testing (China)
Revision: 5.1 Author: Xiao Liu Fax: +86 510 8820 3636 Co., Ltd.
Effective: 2016-11-21 www.tuv-sud.cn
Developed: 2016-11-15 No.10 Huaxia Road (M), Dongting,
Wuxi, 214100
P.R.China
Page 7 of 16
Report Reference No.: 4852018222601
The INTERFERENCE POWER measurements were performed by using the absorbing clamp on the mains and
interface cables in the frequency range 30 MHz - 300 MHz at the following test location :
- Test Area -
Title: EMC EMISSION Test Report Form ID-Number: EMC_WUX_F_25.01E Phone: +86 510 8820 3737 TÜV SÜD Certification and Testing (China)
Revision: 5.1 Author: Xiao Liu Fax: +86 510 8820 3636 Co., Ltd.
Effective: 2016-11-21 www.tuv-sud.cn
Developed: 2016-11-15 No.10 Huaxia Road (M), Dongting,
Wuxi, 214100
P.R.China
Page 8 of 16
Report Reference No.: 4852018222601
The RADIATED EMISSIONS (ELECTRIC FIELD) measurements, in the frequency range of 30 MHz-6000 MHz, were
tested in a horizontal and vertical polarization at the following test location:
- 3 meters
- 10 meters
Title: EMC EMISSION Test Report Form ID-Number: EMC_WUX_F_25.01E Phone: +86 510 8820 3737 TÜV SÜD Certification and Testing (China)
Revision: 5.1 Author: Xiao Liu Fax: +86 510 8820 3636 Co., Ltd.
Effective: 2016-11-21 www.tuv-sud.cn
Developed: 2016-11-15 No.10 Huaxia Road (M), Dongting,
Wuxi, 214100
P.R.China
Page 9 of 16
Report Reference No.: 4852018222601
- Test Area – H
Title: EMC EMISSION Test Report Form ID-Number: EMC_WUX_F_25.01E Phone: +86 510 8820 3737 TÜV SÜD Certification and Testing (China)
Revision: 5.1 Author: Xiao Liu Fax: +86 510 8820 3636 Co., Ltd.
Effective: 2016-11-21 www.tuv-sud.cn
Developed: 2016-11-15 No.10 Huaxia Road (M), Dongting,
Wuxi, 214100
P.R.China
Page 10 of 16
Report Reference No.: 4852018222601
- Standby
- Power on
The following peripheral devices and interface cables were connected during the testing:
Title: EMC EMISSION Test Report Form ID-Number: EMC_WUX_F_25.01E Phone: +86 510 8820 3737 TÜV SÜD Certification and Testing (China)
Revision: 5.1 Author: Xiao Liu Fax: +86 510 8820 3636 Co., Ltd.
Effective: 2016-11-21 www.tuv-sud.cn
Developed: 2016-11-15 No.10 Huaxia Road (M), Dongting,
Wuxi, 214100
P.R.China
Page 11 of 16
Report Reference No.: 4852018222601
Interference Power at the Mains and Interface Cables, 30 MHz - 300 MHz
- PASS - FAIL - NOT APPLICABLE
Minimum limit margin dB At MHz
Maximum limit exceeding -- dB At -- MHz
Comply with the limits reduces by Table 2b of EN 55014-1? - YES - NO - N/A
Remarks:
Title: EMC EMISSION Test Report Form ID-Number: EMC_WUX_F_25.01E Phone: +86 510 8820 3737 TÜV SÜD Certification and Testing (China)
Revision: 5.1 Author: Xiao Liu Fax: +86 510 8820 3636 Co., Ltd.
Effective: 2016-11-21 www.tuv-sud.cn
Developed: 2016-11-15 No.10 Huaxia Road (M), Dongting,
Wuxi, 214100
P.R.China
Technical Report No. 70.500.18.037.03-01
Dated 2019-10-23
Purpose of examination: • Inspection according to the observance of the protection aims of the
following EC directives:
2014/35/EU
• Test according to the test specification
Test result: The test results show that the presented product is in compliance with the
TPS_GCN_F_09.20E – Rev. 1
specified requirements.
2012-10-29
This technical report may only be quoted in full. Any use for advertising purposes must be granted in writing. This report is the
result of a single examination of the object in question and is not generally applicable evaluation of the quality of other products in
regular production.
1.1 Function
Not applicable
Covered through the applied standard
Covered by the following comment
Covered by attached risk analysis
2 Order
2019-10-11
2012-10-29
2019-10-16
69 Suyuan Avenue, Jiangning, 211102 Nanjing, Jiangsu, People's Republic of China
2019-10-16 to 2019-10-18
None
3 Test Results
4 Remark
The user manual has been examined according to the minimum requirements described
in the product standard. The manufacturer is responsible for the accuracy of further par-
ticulars as well as of the composition and layout.
The assembly of the product has to comply with the documentation (CDF). Before the
implementation of safety relevant modifications to the product into the ongoing produc-
TPS_GCN_F_09.20E – Rev. 1
tion the product must be retested for acceptance. The results must be implemented to
the documentation and if necessary the certificate must be updated.
4.2 The user manual has been examined according to the minimum requirements de-
scribed in the product standard. The manufacturer is responsible for the accuracy of
further particulars as well as of the composition and layout.
4.3 When the product is placed on the market, it must be accompanied with safety Instruc-
2012-10-29
tions written in official language of the country. The instructions shall give information
regarding safe operation, installation and maintenance.
4.5 The manufacturer/ Importer has to ensure the appliance placing on the EU market con-
forms to the applicable EU directives which provide the affixing of the CE marking,
such as LVD, EMC, RoHS, ErP, and so on. (for EU directive project of electrical equip-
ment)
4.6 All applicable hazards from EU directive LVD 2014/35/EU are covered by harmonized
standard EN 60255-27:2014 (for EU directive project which risk analysis is required by
directive)
5 Documentation
6 Summary
TÜV SÜD Certification and Testing (China) Co., Ltd. Shanghai Branch
TÜV SÜD Group
TPS_GCN_F_09.20E – Rev. 1
The product has not been shown to be non-conforming to the specified protocol standard. The conformance
test has been performed according to IEC 62439-3 Edition 3 (IS 2016) with and the NR Electric default
Protocol Implementation Conformance Statement for PRP/HSR PICS version 1.0.
This Attestation is granted on account of tests made at location of NR Electric in Nanjing, China and performed
with DNV GL UniSwitch version 1.6 (September 2018). The results, including remarks and limitations, are laid
down in DNV GL report no. 10080975-INC 18-2416 for PRP and 10080975-INC 18-2906 for HSR.
The tests have been carried out on one single specimen of the product, submitted by NR Electric. The
Attestation does not include an assessment of the manufacturer's production. Conformity of his production with
the specimen tested by DNV GL is not the responsibility of DNV GL.
Arnhem, 21-09-2018
The product has not been shown to be non-conforming to the specified protocol standard. The conformance
test has been performed according to IEC 62439-3 Edition 3 (IS 2016) with and the NR Electric default
Protocol Implementation Conformance Statement for PRP/HSR PICS version 1.1.
This Attestation is granted on account of tests made at location of NR Electric in Nanjing, China and performed
with DNV GL UniSwitch version 1.7 (June 2019). The results, including remarks and limitations, are laid down
in DNV GL report no. 10159938 INC 19-2750 for PRP and 10159938 INC 19-2751 for HSR.
The tests have been carried out on one single specimen of the product, submitted by NR Electric. The
Attestation does not include an assessment of the manufacturer's production. Conformity of his production with
the specimen tested by DNV GL is not the responsibility of DNV GL.
Arnhem, 26-07-2019
The product has not been shown to be non-conforming to the specified protocol standard. The conformance
test has been performed according to IEC 62439-3 Edition 3 (IS 2016) with and the NR Electric default
Protocol Implementation Conformance Statement for PRP/HSR PICS version 1.0.
This Attestation is granted on account of tests made at location of NR Electric in Nanjing, China and performed
with DNV GL UniSwitch version 1.6 (September 2018). The results, including remarks and limitations, are laid
down in DNV GL report no. 10080975-INC 18-2410 for PRP and 10080975-INC 18-2904 for HSR.
The tests have been carried out on one single specimen of the product, submitted by NR Electric. The
Attestation does not include an assessment of the manufacturer's production. Conformity of his production with
the specimen tested by DNV GL is not the responsibility of DNV GL.
Arnhem, 21-09-2018
The product has not been shown to be non-conforming to the specified protocol standard. The conformance
test has been performed according to IEC 62439-3 Edition 3 (IS 2016) with and the NR Electric default
Protocol Implementation Conformance Statement for PRP/HSR PICS version 1.0.
This Attestation is granted on account of tests made at location of NR Electric in Nanjing, China and performed
with DNV GL UniSwitch version 1.6 (September 2018). The results, including remarks and limitations, are laid
down in DNV GL report no. 10080975-INC 18-2444 for PRP and 10080975-INC 18-2898 for HSR.
The tests have been carried out on one single specimen of the product, submitted by NR Electric. The
Attestation does not include an assessment of the manufacturer's production. Conformity of his production with
the specimen tested by DNV GL is not the responsibility of DNV GL.
Arnhem, 21-09-2018
The product has not been shown to be non-conforming to the specified protocol standard. The conformance
test has been performed according to IEC 62439-3 Edition 3 (IS 2016) with and the NR Electric default
Protocol Implementation Conformance Statement for PRP/HSR PICS version 1.0.
This Attestation is granted on account of tests made at location of NR Electric in Nanjing, China and performed
with DNV GL UniSwitch version 1.6 (September 2018). The results, including remarks and limitations, are laid
down in DNV GL report no. 10080975-INC 18-2447 for PRP and 10080975-INC 18-2902 for HSR.
The tests have been carried out on one single specimen of the product, submitted by NR Electric. The
Attestation does not include an assessment of the manufacturer's production. Conformity of his production with
the specimen tested by DNV GL is not the responsibility of DNV GL.
Arnhem, 21-09-2018
The product has not been shown to be non-conforming to the specified protocol standard. The conformance
test has been performed according to IEC 62439-3 Edition 3 (IS 2016) with and the NR Electric default
Protocol Implementation Conformance Statement for PRP/HSR PICS version 1.0.
This Attestation is granted on account of tests made at location of NR Electric in Nanjing, China and performed
with DNV GL UniSwitch version 1.6 (September 2018). The results, including remarks and limitations, are laid
down in DNV GL report no. 10080975-INC 18-2448 for PRP and 10080975-INC 18-2896 for HSR.
The tests have been carried out on one single specimen of the product, submitted by NR Electric. The
Attestation does not include an assessment of the manufacturer's production. Conformity of his production with
the specimen tested by DNV GL is not the responsibility of DNV GL.
Arnhem, 21-09-2018
The product has not been shown to be non-conforming to the specified protocol standard. The conformance
test has been performed according to IEC 62439-3 Edition 3 (IS 2016) with and the NR Electric default
Protocol Implementation Conformance Statement for PRP/HSR PICS version 1.0.
This Attestation is granted on account of tests made at location of NR Electric in Nanjing, China and performed
with DNV GL UniSwitch version 1.6 (September 2018). The results, including remarks and limitations, are laid
down in DNV GL report no. 10080975-INC 18-2422 for PRP and 10080975-INC 18-2900 for HSR.
The tests have been carried out on one single specimen of the product, submitted by NR Electric. The
Attestation does not include an assessment of the manufacturer's production. Conformity of his production with
the specimen tested by DNV GL is not the responsibility of DNV GL.
Arnhem, 21-09-2018
(Copy)
Business Scope: R&D, production, sales and technical services of power automatic control and protection
equipment, power electronic equipment, intelligent switches and monitoring equipment, industrial
automatic control systems and supporting computer equipment; sales of electronic components;
photovoltaic power generation; Contact for overseas projects that are consistent with company’s ability,
scale and achievement. Dispatch necessary labors for the implementation of above-mentioned overseas
projects. Import and export of various goods and technologies (excluding those dealt with by designated
companies or prohibited from import or export by the State). Manufacture of power transmission,
distribution and control equipment; Sales of intelligent power transmission, distribution and control
equipment; Lease of non-residential real estate; (For the projects legally subject to the approval, before
carrying out business activities, it has to obtain the approval from relevant departments.)
Registration Authority:
01
www.nrec.com/en
ABOUT
NR ELECTRIC
NR Electric (NR), as a power stability expert, is dedicated to provide smart, reliable and
environmental friendly solutions for power generations, power grid and industries. The products
and solutions covers protection, automation & control, HVDC & FACTS, renewable & microgrid
and engineering consulting & services.
Our power solutions with distinctive expertise that bridges both AC & DC power technology and
spans both conventional & renewable energy platforms, servespower systems from mega
power generations, long distance high capacity HVAC and HVDC transmissions,
sub-transmissions, medium & low voltage distribution, energy-intensive industry to eco-friendly
renewable wind and solar farms. Our feedback oriented approach and non-stop innovation
helps clients to maximize investment efficiency, safety and reliability. NR’ s valuable mission,
innovative technology, high quality products and practical experience permit the company to
expand for more contributions to the power utilities and industrial needs.
02
Corporate Profile
03
www.nrec.com/en
Mission >
Non-Stop Innovation
NR believes that technology innovations make world wonderful and effective. Since
establishment, we never stop researching new technologies and seeking better solutions to
serve power grids all over the world. As a technology-oriented company, NR Electric has own
many creative technologies and patents.
As a leading system solution provider, NR has gained solid experiences in cooperating with
utilities to help them solve troublesome and emergent situations. We commit to realize
customers’ success and contribute to significant projects.
04
Corporate Profile
OUR
BUSINESS
NR is one of the largest & ambitious protection and control manufactures and leads
to one of the best protection & control solution providers across the world. It
occupies a distinct position in FACTS & HVDC system and renewable energy
generation. With complete focus on research and development of innovative
products and solutions, NR Electric provides comprehensive solutions to utility and
industry customers.
05
www.nrec.com/en
Protection, Automation
& Control (PAC)
Built upon decades' of research and development excellence with field proven application
experience in power system. NR’ s intelligent PAC with ease of use and utility to make
deployment, operation and maintenance of protection systems as smart, flexible and reliable as
possible. The utility consumers can benefit from NR’ s PAC solution to optimize energy
generation, transmission, distribution and utilization.
06
Corporate Profile
Innovation Highlight
In 1980’ s, China power grid was encountered with frequently regional blackouts. To solve this technical
dilemma, Mr. Guorong Shen, the founder of NR Electric (former as Nari-Relays) has developed Deviation of
Power Frequency Component (DPFC) principles, effectively speeding up fault clearance time by 30% and
improving relay protection detection time by 100%.
Late 2010’ s, the digital substation concept became trendy in the whole world. NR blend IEC61850 technology
with DPFC principles, creating new PCS series protection, automation and control devices to safeguard the
operation of digital substations. So far, NR’ s PCS series products have been applied to over thousands of
substations all over the world and its performance is upto the record levels.
07
www.nrec.com/en
China Southern Grid (CSG) invests, constructs and operates power networks in Guangdong, Guangxi,
Yunnan, Guizhou and Hainan Provinces. The main power grid of CSG transmits power from Yunnan and
Guizhou grids to load centers in Guangdong. The grid is operating close to stability margin all the year.
Transient stability problems, such as transient power angle instability and voltage fluctuations, had become
major issues that threatened the safe operation of whole southern grid.
In the year 2003, CSG joined hands with NR to build a customized stability control system to deal with stability
issues. After a deep research on the situation that CSG faced with, in the year 2004, experts from NR have
developed PCS-992 series Power Stability Control System (PSCS), the world’ s most complex stability control
system for HVAC & HVDC interconnecting. Totally, the whole system covers the control of 150 substations.
Since then, the PSCS has correctly operated many times that it has created a reliable protective barrier for
CSG.
08
Corporate Profile
09
www.nrec.com/en
Innovation Highlight
In January 2008, Southern China was deteriorate from frozen rain disaster. Many transmission lines and
towers were damaged which have led to large area blackouts and huge amounts of commercial losses. Faced
with this emergent situation that never happened in Southern part of China, CSG worked closely with NR to
find out a solution to defend power grid from ice disaster in half-year time. NR organized an expert team to
tackle this problem. In three-month time, NR has completed the research and development work of PCS-9590
DC De-Icer. In the year 2009, the DC De-Icer passed all the tests and put into service. In the year 2010, when
CSG was experiencing large area frozen rain disaster again, the PCS-9590 DC De-Icer operated normally that
it successfully melted the ice coating on towers and transmission lines, avoiding a large area blackout and
saving millions of money for CSG. In order to fully use the DC De-Icer during warming time, NR integrated SVC
function in the DC De-Icer. Now, the updated PCS-9590 DC De-Icer can work as a SVC to increase the
transmission capability of the transmission line during the normal weather.
10
Corporate Profile
On December 19th 2017, NR has successfully launched commercial operation of the world’s first 500kV/750MVA
UPFC project, awarded by State Grid Corporation of China (SGCC). This UPFC project is located in the southern
part of Suzhou city, Jiangsu, China. In the scope of supply, NR delivered all core equipment inclusively UPFC
converter valves, valve cooling systems, thyristor bypass switches, electronic measurement transformers and
executed more than 190 comprehensive and strict test features.
11
www.nrec.com/en
NR brought its VSC-HVDC solution to solve the grid interconnection problem for the world’ s first 5-terminal
VSC-HVDC transmission project. The advanced solution includes VSC-HVDC valves, DC electronic CTs/VTs,
and control & protection system.
In June 2014, Zhoushan multi-terminal VSC-HVDC project was successfully commissioned by NR. The
connection has established an important link between the mainland and isolated islands, enhancing grid
reliability and security of electricity supplies between Zhoushan and its associated islands.
In the following two years, to conduct detailed system analysis and study fast fault recovery system, NR built
an electromagnetic transient simulation system comprising of AC system, VSC-HVDC valves, bridge dampers,
control & protection system, resonant DC switch. Based on the analysis results, NR successfully introduces
resonant DC switch solution with patented high reliable bridge damper for VSC-HVDC application. The system
will effectively isolate DC short-circuit and will restore it within a very short period of time, where switching
on/off of single converter station is enabled to enhance the reliability and availability of the whole VSC HVDC.
12
Corporate Profile
Renewable Energy
& Microgrid
NR has specialized in renewable energy and microgrid energy technology offering customers a solution to
their energy generation and efficiency needs. NR has designed and installed numerous renewable energy
projects across the globe with practical experience and an in-depth understanding of a wide range of
renewable technologies. The solutions features inclusive of high flexibility, safety, availability and reliability. NR
will fully protect your renewable energy station and make your microgrid as effective as possible.
13
www.nrec.com/en
Innovation Highlight
We developed the culture of renewable energy integration for a sustainable world. The fast development of
renewable energy generation causes grid integration and operation efficiency problems, such as wide area
maintenance and monitoring information collection. Furthermore, the mass monitoring data is usually collected
from renewable stations without any necessary analysis. To overcome the issues, NR combines power
forecast and centralized monitoring & management in one automation system to improve the efficient
management and optimize operation of renewable generation. In 2015, NR customized the PCS-9700 central
SCADA system for Three Gorges Energy project in China. The project is composed of wind farms, solar farms
and small hydropower plants. The PCS-9700 central SCADA system offers remote management of 87
renewable stations, including remote generation monitoring and management, comprehensive data analysis,
unified operation and maintenance, etc. The real-time data processing function improves operation efficiency
by enabling centralized control and remote monitoring of multi-million data points. A mobile app of monitoring
system is developed based on live data models of PCS-9700 to obtain real-time and historic data of all 87
renewable stations.
14
Corporate Profile
Engineering, Consulting
& Service
NR’ s engineering, consulting and services solutions will deliver the desired technological results and efficient
production processes. NR’ s primary goal is to minimize the consumption of your resources, the amount of
capital tied-up and our competent service organization is within easy reach and helps to ensure high
operational efficiency and performance.
15
www.nrec.com/en
Top-Notch Quality
Strict Manufacturing Quality Control to Protect Power System & Operation Personnel.
NR believes the quality of products and services are essential to long-term safety and reliability of electricity
delivery. We implemented stringent quality control processes through our procurement, manufacturing,
configuration, delivery and services. Starting from board soldering, module inspection, to final equipment
assembly, every step is performed by our professional technicians, verified by our testing engineers and
monitored by our quality control managers.
16
Corporate Profile
World-Class Facilities
NR Electric’ s headquarters is situated in Nanjing, China with four independent campuses for management,
research & development, manufacturing and testing. With world class standards and systems, the IED and
power electronic equipment factories are situated over 500,000 square-meters (5,400,000 square feet) of area
with annual manufacturing capability of 1,600,000 IEDs, 37,000 panels and 1,300 power electronics
equipment. The IED factory adopts intelligent manufacturing system with rooftop PV generation system, which
helps to save around 865 tons of coal and ultimately reduce 2155 tons of CO2 emissions each year.
17
www.nrec.com/en
Engineering Experiences
NR strives to offer a wide range of system and service solutions with the most updated techniques to our
customers, assisting them to solve power system stability issues and develop to secure power supply. NR
insists on working closely with power utilities and industrial enterprises, understanding their actual situations,
and focusing on trouble shooting with down-to-earth attitude. With vast engineering experience gained from
thousands of projects worldwide, NR is committed to customers’ satisfaction and maximizing their benefits.
In the past 20 years, NR has successfully fulfilled executed many mission critical projects all over the world.
Through the implementation of these projects, NR has gained well reputation for its high quality products and
superior services, including consulting, design, testing, supply, commissioning and training.
Service-Oriented Globalization
NR Electric has sets up fully owned subsidiary companies and technical service centers globally to better serve
and deliver our customers worldwide. Via the local subsidiaries, our customers can access NR Electric’ s
solutions and services promptly and easily with full understanding and compliance to the local legislation,
culture, linguistic, and business requirement.
By localizing our operations and building a global value chain, NR helps local and global clients to maximize
their global value and share win-win outcomes.
18
Headquarters > Sales Representative Office and
NR Electric Co.,Ltd. Technical Service Center >
69 Suyuan Avenue, Nanjing 211102, China NR Electric – Kazakhstan Office
Tel:+86 25 87178888 Fax:+86 25 87178999
NR Electric (Kazakhstan) Representative Office & TSC
Email: NRservices@nrec.com, NRsales@nrec.com
Қазақстан, астана ханов Керей и Жанибек, д.18 офис 307
Tel: +7 702 3688159
Email: cis@nrec.com
Subsidiaries >
NR Electric – Philippines Office
NR Engineering Co., Ltd.
NR Electric (Philippines) Representative Office & TSC
69 Suyuan Avenue, Nanjing 211102, China 1408, 14 st Floor, Raffles Corporation Center, Emerald Avenue,
Tel:+86 25 87178888 Fax:+86 25 87178999 Bgry. San Antonio, Ortigas Center, Pasig City 1605, Philippines
Email: NRservices@nrec.com, NRsales@nrec.com Tel: + 63 2 5841533; + 63 2 5841471
Fax: + 63 2 5709511
NR Electric – Hongkong Subsidiary Email: philippine@nrec.com
NR Electric International Co., Ltd.
Unit C, 7/F, Ford Glory Plaza, 37-39 Wing Hong Street, NR Electric – Vietnam Office
Cheung Sha Wan Kowloon, Hong Kong NR Electric (Viet Nam) Representative Office & TSC
Tel: +852 23703773 5th floor, CDC Building, 25 Le Dai Hanh, Hai Ba Trung, Ha Noi,
Fax: +852 27439555 Vietnam
Email: international@nrec.com Tel: +84 24 32202069
Fax: +84 24 32202069
NR Electric – Indonesia Subsidiary Email: vietnam@nrec.com
PT. NR Electric Jakarta
F Square – Komplek Pergudangan Taman Tekno, F1/FB Jl NR Electric – Canada Office
Taman Tekno Widya, BSD, Tangerang Selatan. 15314 NR Electric USA LLC (Canada)
Indonesia Tel: +1 9492328154(Canada); +86-15251820737 (China)
Tel : +62 21 7567 2445 Email: wangbin3@nrec.com
Email: indonesia@nrec.com
PCS-996S-G
PCS-994S
PCS-902S PCS-996S-G
PCS-931S PCS-994S
PCS-9705S PCS-9705S
M
PCS-978S
PCS-9671S PCS-9631S
G C
PCS-221S
PCS-9611S
M
PCS-9613S
Device List
Application Device Types
Line Protection
Transformer Protection
Busbar Protection
Capacitor Protection
Bay Control
002
PCS S Series www.nrec.com/en
Auxiliary Software
003
PCS S Series www.nrec.com/en
PCS-931S Line Differential Relay ° Current differential protection has the excellent resistance
to CT saturation when external fault. As long as the
correct transfer time is no less than 3ms, current differential
protection will ensure fast clearance of internal fault and
non-operation of external fault.
• Distance Protection
032
PCS S Series www.nrec.com/en
• Both dedicated fiber channel and multiplexing fiber channel • Pilot directional earth-fault protection (85)
are supported, and single mode and multi-mode channel Directional zero-sequence comparison element for pilot
combination operation mode is enabled. Communication rate scheme, such as PTT, Blocking and Unblocking. The scheme
supports 64kbit/s and 2Mbit/s, and communication protocol integrates current reversal logic, weak-infeed echo and open
supports C37.94 and G.703. breaker echo.
033
PCS S Series www.nrec.com/en
Frequency is calculated by using the positive-sequence voltage. Single-/Three-pole reclosing mode is provided. Up to four-shot
Positive-sequence undervoltage is provided as blocking element. breaker auto-reclosing with synchro-check and voltage check
logic. Both protection operating and external binary input can
be used as triggering condition.
• Six stages underfrequency protection (81U)
Frequency is calculated by using the positive-sequence voltage. • Switchgear control
Positive-sequence undervoltage is provided as blocking element.
The control of circuit breaker, disconnector and earth switch
can be implemented via communication, LCD menu and binary
• Six stages frequency rate-of-change protection (81R) inputs. It can switch between remote mode and local mode.
Frequency is calculated by using the positive-sequence voltage. Double point status synthesis, trip statistics, interlocking, direct
Positive-sequence undervoltage is provided as blocking element. control and manual control are available.
034
PCS S Series www.nrec.com/en
1. Front-panel status indication and control of switches 1.Current and voltage analog inputs
7. Target reset
035
PCS S Series www.nrec.com/en
PCS-902S Line Distance Relay • The unique phase selector has the same protection zone as
operation element. The phase selection is automatically
resulted according to the reliability of phase selector, so that
to avoid probable mistaken multi-phase selection by adopting
overreaching phase selector.
Functions
Protection and Control
• High-speed DPFC distance protection (21D)
Innovative Deviation of Power Frequency Component (DPFC)
distance protection quickly clears faults in a sub- cycle. DPFC
is immune to the load fluctuation, weak-infeed and power
swing.
011
PCS S Series www.nrec.com/en
• Pilot directional earth-fault protection (85) • Two stages residual overvoltage protection (59G)
Directional zero-sequence comparison element for pilot Selectable tripping purpose or alarm purpose.
scheme, such as PTT, Blocking and Unblocking. The scheme
integrates current reversal logic, weak-infeed echo and open
• Six stages overfrequency protection (81O)
breaker echo.
Frequency is calculated by using the positive-sequence
voltage. Positive-sequence undervoltage is provided as
• Unique power swing blocking releasing logic (PSBR)
blocking element.
The power swing blocking releasing logic prevents mal-operations
during external faults in power swing situations. It quickly clears
• Six stages underfrequency protection (81U)
the internal faults in power swing scenarios.
Frequency is calculated by using the positive-sequence
voltage. Positive-sequence undervoltage is provided as
• Six stages phase overcurrent protection (67P, 50/51P)
blocking element.
Selectable time characteristics (definite-time or inverse-time),
voltage control elements and directional control elements (forward,
reverse or non-directional) are provided. A harmonic blocking • Six stages frequency rate-of-change protection (81R)
function is integrated to restrain each stage independently. Frequency is calculated by using the positive-sequence
voltage. Positive-sequence undervoltage is provided as
• Six stages earth-fault protection (67G, 50/51G) blocking element.
012
PCS S Series www.nrec.com/en
• Stub differential protection (87STB) • Realize high accurate measurement of the phasors and
It can protect the T-zone in one-and-a-half breaker and ring analogs according to the IEEE C37.118.1-2011 and IEEE
breaker arrangements. C37.118.1a-2014 standard.
The control of circuit breaker, disconnector and earth switch • Fault Locator with parallel-line compensation
can be implemented via communication, LCD menu and binary
• Self diagnostic
inputs. It can switch between remote mode and local mode.
Double point status synthesis, trip statistics, interlocking, direct • Event recorder including 1024 change-of-binary-input events,
control and manual control are available. 1024 supervision events, 256 control logs and 1024 device
logs
• Synchronism Check (25) • Disturbance recorder including 64 disturbance records with
Synchronism check can be used for auto-reclosing and manual waveforms (The format is compatible with COMTRADE.)
closing for single-breaker and dual-breaker. The synchronism
• Pilot communication channel supervision
check function compensates for breaker close time, frequency,
magnitude, and angle differences between the two voltage • System frequency supervision
sources used for synchronism. • Clock synchronization using IRIG-B, SNTP, PPS (Pulse-Per-
Second) and PPM (Pulse-Per-Minute) , IEEE 1588
• Voltage selection
Based on "Near priority" principle, the reference and
synchronization voltages in double busbars and one-and-half
Communication
circuit breakers, or three-phases voltage among double busbars • Optional single- or dual- pilot channels (fiber optic)
used by protection calculations or measurements can be
switched among different input sources. • Support G.703 and C37.94
The relay continually and automatically traces the voltage and • Up to four 100Base-FX optical Ethernet ports using IEC
current drifts and adjusts the zero point to acquire accurate 61850, DNP3.0 or IEC 60870-5-103 over TCP/IP
measurements.
• Two RS-485 serial ports using IEC 60870-5-103 or Modbus
• Single-ended impedance-based fault location • One RS-485 serial port for clock synchronization
013
PCS S Series www.nrec.com/en
• Support IEC 61850-8-1 GOOSE via extendable electrical or • Support IEC 61850-9-2LE SV via extendable electrical or
optical Ethernet port optical Ethernet port
1. Front-panel status indication and control of switches 1.Current and voltage analog inputs
7. Target reset
Installation
Dimensions
Note: The dimensions of device depth include the dimension of terminal connector without wire harness 22mm.
Certain mounting method needs special mounting accessory for support.
014
PCS S Series www.nrec.com/en
054
PCS S Series www.nrec.com/en
element can be set as no direction, forward direction and reverse CT. Sensitive earth fault protection can operate to trip or alarm,
direction. The zero-sequence current used by earth fault it can be enabled or blocked by the external binary input.
overcurrent protection can be calculated zero-sequence current or
the measured zero-sequence current, it can operate to trip or • RMS overcurrent protection (50/51R)
alarm, it can be enabled or blocked by the external binary input.
The device can provide two stages of RMS overcurrent protection
with independent logic. When the fault current with more harmonic
• Another group of earth fault overcurrent protection
components is generated in the system, the amplitude is larger
The device can provide six stages of another group of earth than the current threshold of RMS overcurrent protection, the RMS
fault overcurrent protection with independent logic. Each stage overcurrent protection will operate.
can be independently set as definite-time characteristics or
inverse-time characteristics. The dropout characteristics can be The operating characteristics of RMS overcurrent protection is
set as immediate dropout, definite-time dropout or inverse-time definite-time characteristics. The dropout characteristics can be
dropout. The protection fixedly adopts the measured residual set as immediate dropout or definite-time dropout. RMS
current, the calculated residual current is not supported. It can overcurrent current can operate to trip or alarm, it can be
operate to trip or alarm, it can be enabled or blocked by the enabled or blocked by the external binary input.
external binary input.
• Phase overvoltage protection (59P)
• Negative-sequence overcurrent protection (50/51Q)
The device can provide two stages of phase overvoltage
The device can provide two stages of negative-sequence protection with independent logic. When a high voltage occurs in
overcurrent protection with independent logic. Each stage can the system, it is greater than the voltage threshold, phase
be independently set as definite-time characteristics or overvoltage protection will operate to remove the device from the
inverse-time characteristics. The dropout characteristics can be system after a time delay. In addition, the overvoltage protection
set as immediate dropout, definite-time dropout or inverse-time also provides the alarm function, prompting the overvoltage of the
dropout. For a double-circuit or a ring network line, the system, it allows users to find the cause timely, and preventing
negative-sequence fault current may have different flow further deterioration of the fault. Each stage of phase overvoltage
d i r e c t i o n . C o n s i d e r i n g t h e p r o t e c t i o n s e l e c t i v i t y, t h e protection can be independently set as definite-time characteristics
negative-sequence overcurrent protection can be blocked by or inverse-time characteristics. The dropout characteristics can be
the direction control element. Negative-sequence overcurrent set as immediate dropout and definite-time dropout.
current can operate to trip or alarm, it can be enabled or
Users can select phase voltage or phase-to-phase voltage for
blocked by the external binary input.
the protection calculation.
• Broken conductor protection (46BC) “1-out-of-3” or “3-out-of-3” logic can be selected for the
Broken-conductor fault mainly is single-phase broken or protection criterion. (1-out-of-3 means any of three phase
two-phases broken. According to the ratio of negative-sequence voltages, 3-out-of-3 means all three phase voltages).
current to positive-sequence current (I2/I1), it is used to judge
whether there is a broken-conductor fault. Negative-sequence • Residual overvoltage protection (59G)
current under normal operating condition (i.e. unbalance
The device can provide two stages of residual overvoltage
current) is due to CT error and unbalance load, so the ratio of
protection with independent logic. When the residual voltage is
negative-sequence current to positive-sequence current
greater than the voltage threshold, the residual overvoltage
(amplitude) is relative steady. The value with margin can then
protection will operate to remove the device from the system after
be used as the setting of broken conductor protection. It is
a time delay. In addition, the residual overvoltage protection also
mainly used to detect broken-conductor fault and CT circuit
provides the alarm function, it prompt that there is an earth fault
failure as well.
leading to residual voltage generation, it allows users to find the
cause timely, and preventing further deterioration of the fault. The
• Sensitive earth fault protection (50/51SEF)
dropout characteristics of residual overvoltage protection can be
The device can provide six stages of sensitive earth fault set as immediate dropout and definite-time dropout.
protection with independent logic. Each stage can be
independently set as definite-time characteristics or
• Negative-sequence overvoltage protection (59Q)
inverse-time characteristics. The dropout characteristics can be
This device can provide two stages of negative sequence
set as immediate dropout, definite-time dropout or inverse-time
overvoltage protection. If the negative sequence voltage is greater
dropout. Users can choose whether it is blocked by the
than the predefined setting, this protection will operate. The
direction control element. The direction control element can be
negative-sequence overvoltage protection can operate with a
set as no direction, forward direction and reverse direction. The
definite-time limit, and the supported dropout characteristics
zero-sequence current used by sensitive earth fault protection
include instantaneous dropout and definite-time dropout.
is the measured zero-sequence current from the high-precision
055
PCS S Series www.nrec.com/en
• Underfrequency protection (81U) According to the tripping information from the device and the
auxiliary information (the current and the position) of target
This device provides six stages of underfrequency protection. If
circuit breaker, breaker failure protection constitutes the
the system frequency is less than the predefined setting, this
criterion to discriminate whether the target circuit fails to open.
protection will operate for shedding some part of loads from the
If the criterion is confirmed, breaker failure protection will
system. The underfrequency protection is with independent
operate to trip the target circuit breaker with the re-trip time
definite time delay characteristic and with instantaneous
delay, trip it again with the first time delay and trip the adjacent
dropout characteristic.
circuit breakers with the second time delay. As a special backup
protection, breaker failure protection can quickly isolate the
fault, reduce the affected range by the fault, keep system
stability and prevent generators, transformers and other primary
equipments from seriously damaged.
056
PCS S Series www.nrec.com/en
057
PCS S Series www.nrec.com/en
3 1
1
6
6
4
4
2 7
5 7 5
3
1. Front-panel status indication and control of switches 1.Current and voltage analog inputs
2. Easy-to-use keypad aids simple navigation and set-point 2.Power supply and binary I/O
adjustment
3.Copper Ethernet port
3. Push buttons for open/close, switch for selection between
4.Fiber-optic Ethernet port
local and remote control, and user's login and logout authority
management 5.RS-232 or RS-485 serial port
5. RJ45 Interface
7. Target reset
058
PCS S Series www.nrec.com/en
Installation
Dimensions
Note: The dimensions of device depth include the dimension of terminal connector without wire harness 22mm.
Certain mounting method needs special mounting accessory for support.
059
PCS S Series www.nrec.com/en
52 when it is in maintenance.
Busbar 2
Bus coupler
153
PCS S Series www.nrec.com/en
154
PCS S Series www.nrec.com/en
• Self-diagnostic
• Disturbance recorder including 32 disturbance records with 2. Easy-to-use keypad aids simple navigation and set-point
waveforms (The format is compatible with COMTRADE.) adjustment
• Clock synchronization using IRIG-B, SNTP, PPS (Pulse-Per- 3. Push buttons for open/close, switch for selection between local
Second) and PPM (Pulse-Per-Minute) , IEEE1588 and remote control, and user's login and logout authority
management
Rear Panel
Communication
• Up to four 10Base-T/100Base-TX copper Ethernet ports using
IEC 61850, DNP3.0 or IEC 60870-5-103 over TCP/IP
• Redundancy protocols PRP and HSR 4.Power supply and binary I/O
155
PCS S Series www.nrec.com/en
Installation
Dimensions
Note: The dimensions of device depth include the dimension of terminal connector without wire harness 22mm.
Certain mounting method needs special mounting accessory for support.
156
PCS S Series www.nrec.com/en
Functions
Protection
• Transformer differential protection (87T)
Conventional and sensitive biased differential elements are
available for fast and sensitive fault clearance. The
conventional biased differential element can be with inrush
current blocking, while the sensitive biased differential element
can be further blocked by CT saturation, over excitation and CT
failure. Instantaneous differential element instantaneously
responds and clears serious internal faults without any
restraining characteristics and blocking elements. DPFC
differential element is immune to load fluctuations and provides
high sensitivity for turn-to-turn faults and high impedance faults.
109
PCS S Series www.nrec.com/en
Winding differential protection can be applied where winding Time characteristics is selectable between definite-time and
CTs exist. In comparison to REF, it provides high sensitivity for inverse-time. Phase voltage or phase-to-phase voltage can be
both earth faults and phase-to-phase faults. Up to three winding selected for protection calculation. “1-out-of-3” or “3-out-of-3”
differential protections are provided for the different sides of a logic can be selected for protection criterion.
transformer, and up to five 3-phase CTs can be integrated in
110
PCS S Series www.nrec.com/en
• Overfrequency protection (81O) Modbus, DNP3.0, IEC 60870-5-103, IEC 61850 Ed.1 & Ed.2,
IEC 61850 MMS Server, IEC 61850-8-1 GOOSE, IEC
Frequency is calculated by using the positive-sequence voltage.
61850-9-2LE SV, IEC 62439 Parallel Redundancy Protocol,
Positive-sequence undervoltage is provided as blocking element.
IEC 62439 HSR Ring Redundancy Protocol.
Frequency is calculated by using the positive-sequence voltage. • Up to two 100Base-FX optical Ethernet ports
Positive-sequence undervoltage is provided as blocking element.
• Two RS-485 serial ports for communication or printer
• Direct control
111
PCS S Series www.nrec.com/en
Installation
Dimensions
Note: The dimensions of device depth include the dimension of terminal connector without wire harness 22mm.
Certain mounting method needs special mounting accessory for support.
112
Project : Construction of Substation for Kigoma-Nyakanazi Transmission Project
Customer : Tanzania Electric Supply Company Ltd (TANESCO) TECHNICAL BID
RFB No. : PA/001/2021-2022/HQ/W/04
2. Panel
2.1 Manufacturer to be specified NR Electric
2.2 Country of manufacturer to be specified CHINA
2.3 Standards IEC 60529 IEC 60529
2.4 Protection class IP 52 IP 54
2.5 Pre-wired Yes Yes
2.6 Floor mounted Yes Yes
2.7 Sheet steel thickness mm >2 >2
2.8 Max. height mm 2000 2000
2.9 Max. width mm 800 800
2.10 Max. depth mm 600 600
2.11 Front door material Glass Glass
2.12 Coloring RAL 7035 RAL 7035
3. HV Line Protection
3.1 Line Differential Protection (87L)
1) Manufacturer to be specified NR Electric
2) Country of manufacturer to be specified CHINA
3) Type of reference to be specified PCS-931S
4) Auxiliary voltage range V DC 77 - 150 88~300Vdc
5) Input frequency range Hz 47.5 - 52.5 47.5 - 52.5
6) Independent settings for each zone
range of values of restricted protection 0.05 - 2.00 0.05 - 2.00
range of values of unrestricted protection 0.5 - 35.00 0.5 - 35.00
range of times sec. 0.00 - 30.00 0.00 - 30.00
7) Sensitivity
For phase fault ms to be specified < 30
For earth fault ms < 30 < 30
Operating time ms to be specified < 30
3.3 Non Directional Over Current and Earth Fault Protection (50/51, 50N/51N)
1) Manufacturer to be specified NR Electric
2) Country of manufacturer to be specified CHINA
3) Type of reference to be specified PCS-9611S
4) Auxiliary voltage range V DC 77 - 150 88~300Vdc
5) Input frequency range Hz 47.5 - 52.5 47.5 - 52.5
6) Number of phase CT inputs Refer to SLD Refer to SLD
7) Number of earth fault CT input Refer to SLD Refer to SLD
Standard, very and extreme inverse and definite time
8) yes yes
characteristics curves conforming to IEC 60255
9) Settings
IMDT over current 0.5 In - 2.4 In 0.05 In - 40 In
Earth fault 0.05 In - 0.8 In 0.05 In - 40 In
Times setting multiplier 0.05 - 1.0 0.05 - 1.0
Instantaneous 2 - 30 times 2 - 30 times
10) Operating time ms < 40 < 40
11) Number of IDMT characteristics 5 5
12) Requirement
Dedicated breaker fail protection yes yes
Integral metering function yes yes
Opto-isolator inputs yes yes
Event/disturbance/fault recorder yes yes
Integral operator interface yes yes
Programmable scheme logic yes yes
User friendly HMI, window based software for
relay setting, relay configuration and event, yes yes
disturbance and fault record management
Make 6A max. for 0.2s yes yes
Self checking facilities yes yes
13) Communication
Protection: Direct optic fiber 1300mm and
yes yes
1550mm single mode
3.4 Directional Over Current and Earth Fault Protection (67, 67N)
1) Manufacturer to be specified NR Electric
2) Country of manufacture to be specified CHINA
3) Type of reference to be specified PCS-9611S
4) Auxiliary voltage range V DC 77 - 150 88~300Vdc
5) Input frequency range Hz 47.5 - 52.5 47.5 - 52.5
6) Number of phase CT inputs Refer to SLD Refer to SLD
7) Number of earth fault CT inputs Refer to SLD Refer to SLD
Standard, very and extreme inverse and definite time
8) yes yes
characteristics, IEC 60255
9) Settings
Over current 0.5 In - 2.4 In 0.05 In - 40 In
Earth fault 0.05 In - 0.8 In 0.05 In - 40 In
Quadrature connection for polarising voltage V 110V 110V
High set element 1 In - 32 In 1 In - 32 In
Time setting multiplier 0.05 - 1.0 0.05 - 1.0
10) Operating time ms < 40 < 40
11) Three phase VT inputs yes yes
Method of determining zero sequence voltage,
12) yes yes
derived mathematically
13) Number of DOC/DEF function characteristics 5 5
14) Requirement
Integral metering function yes yes
Opto-isolator inputs yes yes
Event/disturbance/fault recorder yes yes
Programmable scheme logic yes yes
User friendly HMI, window based software for
relay setting, relay configuration and event, yes yes
disturbance and fault record management
Make 6A max. for 0.2s yes yes
Self checking facilities yes yes
15) Communication
Protection: Direct optic fiber 1300mm and
yes yes
1550mm single mode
6.21 Break dc 50W resistive, 25W inductive (L/R 40ms) yes yes
8.10 Break dc 50W resistive 25W inductive (L/R 40ms) yes yes
Station Bus:
1. Physical Medium Glass fibre optic Glass fibre optic
Each communication devices shall have dual
2. Yes Yes
connection, hot and standby.
Interbay Bus
1. Physical Medium Glass fibre optic Glass fibre optic
Printer server
1. MTBF Hrs to be specified >10000hr
13 System Performance:
1. Exchange of display (First reaction) S <1S <1S
2. Presentation of a binary change in the process display S < 0.5 S < 0.5 S
Manufacturer’s Authorization
ISO Certificate
Supply Records
CNNC CHINA
GENERATOR PROTECTION FOR UNIT 2
ZHONGYUAN NUCLEAR
GENERATOR OF 340MW CHASHMA NUCLEAR RCS-985, RCS-974 2006 PAKISTAN
ENGINEERIING POWER PLANT
POWER PLANT, PAKISTAN
CORP
SEPCOIII ELECTRIC
BUSBAR PROTECTION FOR JHARSUGUDA POWER
RCS-915 2006 POWER PLANT INDIA
POWER PLANT, INDIA CONSTRUCTION
CORPORATION
HUNAN
FEEDER LINE PROTECTION FOR 4×25MW
RCS-9625 CREATWALL SWICH 2006 POWER PLANT INDIA
GUJARAT POWER PLANT, INDIA
CO.,LTD
SVC PROJECT FOR TAIXING, VIETNAM RCS-9700C, RCS-9698, RCS-9794 RXPE 2008 INDUSTRIAL VIETNAM
SHENZHEN
SHANDONG
33KV SUBSTATION AUTOMATION SYSTEM FOR RCS-9700C, RCS-9700, RCS-
NUCLEAR POWER 2008 POWER PLANT INDIA
210MW LANJIGARH POWER PLANT, INDIA 9698, RCS-9794
ENGINEERING CO.,
LTD
SHANGHAI HUA
AUXILIARY POWER SYSTEM PROTECTION FOR RCS-9622, RCS-9624, RCS-9625, TONG
2008 POWER PLANT INDIA
4*135MW WPCPL POWER PLANT, INDIA RCS-9626, RCS-9627, SWITCHGEAR
WORKS CO.,LTD
SEPCOIII ELECTRIC
400KV REACTOR PROTECTION, TRANSFORMER
POWER
PROTECTION, CIRCUIT BREAKER PROTECTION RCS-917, RCS-978, RCS-921 2008 POWER PLANT INDIA
CONSTRUCTION
FOR 5*660MW APL POWER PLANT, INDIA
CORPORATION
SHENZHEN
SHANDONG
GENERATOR PROTECTION FOR 210MW
RCS-985, RCS-974 NUCLEAR POWER 2008 POWER PLANT INDIA
LANJIGARH POWER PLANT, INDIA
ENGINEERING CO.,
LTD
GENERATOR PROTECTION, SEPCOIII ELECTRIC
STARTUP/STANDBY TRANSFORMER POWER
RCS-985, RCS-974 2008 POWER PLANT INDIA
PROTECTION FOR 5*660MW APL POWER CONSTRUCTION
PLANT, INDIA CORPORATION
SEPCOIII ELECTRIC
SUBSTATION AUTOMATION SYSTEM FOR POWER
RCS-9700C, RCS-9698, RCS-9794 2008 POWER PLANT INDIA
5*660MW APL POWER PLANT, INDIA CONSTRUCTION
CORPORATION
TIANSHUI
AUXILIARY POWER PROTECTION FOR 9*135MW RCS-9622, RCS-9624, RCS-9625,
CREATWALL SWICH 2008 POWER PLANT INDIA
JHARSUGUDA POWER PLANT, INDIA RCS-9626, RCS-9627
CO.,LTD
TIANSHUI
AUXILIARY POWER PROTECTION FOR 9*135MW RCS-9622, RCS-9624, RCS-9625,
CREATWALL SWICH 2008 POWER PLANT INDIA
JHARSUGUDA POWER PLANT, INDIA RCS-9626, RCS-9627
CO.,LTD
SPARE PARTS FOR POWER PLANT, INDIA RCS-985 TIANAN ELECTRIC 2008 POWER PLANT INDIA
GENERATOR PROTECTION FOR SREPOK 4A
RCS-985, RCS-974, RCS-902 DONGFANG GROUP 2009 HPP VIETNAM
HYDROPOWER PLANT
ANSHAN HENGLI
ELECTRICAL
PROTECTIVE RELAY FOR EIL STEEL PLANT,
RCS-9600CN EQUIPMENT 2009 INDUSTRIAL INDIA
INDIA
MANUFACTURING
CO., LTD
SHANDONG
PROVINCE
PROTECTION AND AUTOMANTION SYSTEM
RCS-9700C, RCS-9698, RCS-9794 METALLURGICAL 2009 INDUSTRIAL INDIA
FOR EIL STEEL PLANT, INDIA
ENGINEERING
CO.,LTD
SHANDONG
PROVINCE
PROTECTION AND AUTOMATION SYSTEM FOR RCS-9600CN, RCS-9794, RCS-
METALLURGICAL 2009 INDUSTRIAL INDIA
35KV SUBSTATION OF EIL STEEL PLANT, INDIA 9698, RCS-9700
ENGINEERING
CO.,LTD
SHANDONG
PROVINCE
PROTECTION AND AUTOMATION SYSTEM FOR RCS-9600CN, RCS-9794, RCS-
METALLURGICAL 2009 INDUSTRIAL INDIA
6.6KV SUBSTATION OF EIL STEEL PLANT, INDIA 9698, RCS-9700
ENGINEERING
CO.,LTD
SHANDONG
PROVINCE
EMS FOR EIL STEEL PLANT, INDIA RCS-9001 METALLURGICAL 2009 INDUSTRIAL INDIA
ENGINEERING
CO.,LTD
SHENZHEN
SHANDONG
ECS FOR 210MW LANJIGARH POWER PLANT, RCS-9600CN, RCS-9794, RCS-
NUCLEAR POWER 2009 POWER PLANT INDIA
INDIA 9698, RCS-9700
ENGINEERING CO.,
LTD
SHANGHAI
AUXILIARY POWER PROTECTION FOR APL RCS-9622, RCS-9624, RCS-9625, GUANGDIAN
2009 POWER PLANT INDIA
POWER PLANT, INDIA RCS-9626, RCS-9627 ELECTRIC GROUP
CO.,LTD
SHANGHAI
AUXILIARY POWER PROTECTION FOR APL GUANGDIAN
RCS-9600CN 2009 POWER PLANT INDIA
POWER PLANT, INDIA ELECTRIC GROUP
CO.,LTD
SHANGHAI
AUXILAIRY POWER PROTECTION FOR APL GUANGDIAN
RCS-9600CN 2009 POWER PLANT INDIA
POWER PLANT, INDIA ELECTRIC GROUP
CO.,LTD
SEPCOIII ELECTRIC
GENERATOR PROTECTION FOR 2*660MW POWER
RCS-985, RCS-974 2009 POWER PLANT INDIA
JHAJJAR POWER PLANT, INDIA CONSTRUCTION
CORPORATION
XIAN ELECTRIC
ECT AND EVT FOR 132KV QIDONGDAO DIGITAL
PCS9250 ENGINEERING 2010/9/30 SUBSTATION HONG KONG
SUBSTATION
CO.,LTD
SUZHOU TENGRUI
PROTECTIVE RELAY FOR POWER PLANT IN POWER
RCS9611C 2010/10/8 POWER PLANT INDONESIA
INDONESIA ENGINEERING CO.,
LTD
COLOR SCIENCE
PROTECTIVE RELAYS FOR CAIPU
PCS931, AND TECHNOLOGY 2010/10/9 SUBSTATION TAIWAN
TECHNOLOGY CO., LTD.
CO., LTD
SEPCO ELECTRIC
PROTECTIVE RELAYS FOR 9*135MW POWER
PCS9882,RCS9794 2010/10/12 POWER PLANT INDIA
JHARSUGUDA POWER PLANT CONSTRUCTION
CORP
NARI-RELAYS
NIGERIA PROJECT RCS9658CU ELECTRIC NIGERIA 2010/10/14 SUBSTATION NIGERIA
LTD.
SEPCO ELECTRIC
POWER
GMR KAMALANGA THERMAL POWER PLANT SPARE PARTS 2010/10/18 POWER PLANT INDIA
CONSTRUCTION
CORP
NATIONAL GRID
SUBSTATION OF NGCP PCS902,CJX-02 CORPORATION OF 2010/10/20 SUBSTATION PHILIPPINES
THE PHILIPPINES
RCS985TS,PCS985A,RCS974FG, SINOHYDRO
GHANA 161KV BUWEI HYDROPOWER STATION
RCS9661,RCS922A,RCS921A,RC CORPORATION 2010/10/27 HPP GHANA
S915E,PCS996R,CZX-12R LIMITED
HANGZHOU YATAI
GENERATOR PROTECTION PANEL FOR ELECTRIC POWER HYDRO POWER
CJX02,RCS974,RCS985, 2010/11/2 KAZAKHSTAN
KAZAKHSTAN 45MW HYDROPOWER STATION TECHNOLOGY CO., STATION
LTD
CJX11,CZX12R2,PCS9882,RCS93
1BM,RCS9611C,RCS9631C,RCS9
CONGO(D.R) SHITURU COPPER MINE 220KV CHINT ELECTRIC
698G,RCS9703C,RCS9705C,RCS9 2010/11/12 SUBSTATION CONGO, DEM. REP.
SMCO STEP-DOWN SUBSTATION CO.,LTD
706C,RCS974A,RCS9784A,RCS97
85C,RCS978E
GUANGDONG
BENGAL 132KV DOHAZARI 100MW GENERATOR COAL POWER
PCS-996R PCS-9882C IPC POWER 2011/1/10 BENGAL
PROJECT SUBSTATION PLANT
ENGINEERING
CORP
INCONTROL TECH
MALAYSIA 1P9 6112 UTM SKUDAI SUBSTATION PCS-9882B PCS-9882C 2011/1/14 SUBSTATION MALAYSIA
SDN BHD
UNION ELECTRICA
COLUMBIA 115KV MOCORONGO SUBSTATION PCS-931 PCS-9611 CJX-02 2011/1/17 SUBSTATION COLUMBIA
S.A.
ZHEJIANG
RCS-943A-CPU RCS-915AB-CPU
TURKMENISTAN 110KV TURKMENISTAN CHANGJIANG
RCS-9794A-COM RCS-9700C- 2011/1/27 SUBSTATION TURKMENISTAN
SUBSTATION ELECTRIC CO., LTD
CPU
SHANGHAI
RCS-9622CN RCS-9624CN RCS-
GUANGDIAN COAL POWER
INDIA APL5*660MW POWER PLANT 9625CN RCS-9626CN RCS- 2011/1/29 INDIA
ELECTRIC GROUP PLANT
9627CN RCS-9628CN
CO.,LTD
SEPCO ELECTRIC
COAL POWER
INDIA JHARSUGUDA 9*135MW POWER PLANT SPARE PARTS POWER 2011/2/14 INDIA
PLANT
CONSTRUCTION
CORP(SEPCO)
CHINA COMMODITY
SAUDI ARABIA 660MW SAUDI ARABIA POWER COAL POWER
RCS-9627CN NET 2011/2/14 SAUDI ARABIA
PLANT PLANT
GUODIAN NANJING
SRI LANKA 220KV VEYANGODASUBSTATION; COAL POWER
SPARE PARTS AUTOMATION 2011/2/14 SRI LANKA
KOTUGODA SUBSTATION PLANT
CO.,LTD
MOZAMBIQUE 220KV ALTO MOLOQUE HIGH VOLTAGE
PCS-9611 2012/5/17 SUBSTATION MOZAMBIQUE
SUBSTATION TECHNOLGY
CNMC
ZAMBIA 10KV SUBSTATION Spare Parts(Module) INTERNATIONAL 2012/5/17 SUBSTATION ZAMBIA
TRADE LTD.
BEIJING SIFANG
PHILIPPINES 230KV PACO SUBSTATION NR0552N AUTOMATION 2012/5/22 SUBSTATION PHILIPPINES
CO.,LTD
TIANJIN HONGLIAN
TRADE
INDONESIA GUOHUA POWER PLANT DSP2-4A DEVELOPMENT 2012/5/23 POWER PLANT INDONESIA
CO.,LTD
WORLDWIDE
PHILIPPINES LAOYING CEMENT PLANT
RCS-9641CS ELECTRIC STOCK 2012/5/25 INDUSTRIAL PHILIPPINES
CO.,LTD
APL(BEIJING) EXIM
INDIA MUNDRA PHASE COAL POWER PLANT RCS-985RE 2012/5/25 POWER PLANT INDIA
CO.LTD
PSI INCONTROL
MALAYSIA 35KV CRP TESTING PROJECT Spare Part 2012/6/1 SUBSTATION MALAYSIA
SDN.BHD
CNMC
ZAMBIA 10KV CNMC INTERNATIONAL TRADE
RCS-9613C INTERNATIONAL 2012/6/5 INDUSTRIAL ZAMBIA
LTD PROJECT
TRADE LTD.
YANGZHONG
PAKISTAN GUDU COAL POWER PLANT RCS-9651C HAOYANG 2013/1/6 POWER PLANT PAKISTAN
ELECTRIC CO.,LTD
SHANGHAI
TURKEY 400V ATLAS COAL POWER PLANT PCS-9691 PCS-9692 TENGSAI TRADING 2013/1/6 POWER PLANT TURKEY
COMPANY LTD
INDIA SIEMENS LTD INDIA PROJECT SERVICE SIEMENS LTD 2013/1/6 SUBSTATION INDIA
PSI INCONTROL
MALAYSIA 33KV TANCO SUBSTATION RCS-9671C RCS-931 2013/1/6 SUBSTATION MALAYSIA
SDN.BHD
ZHENJIANG
HUAYUAN
PAKISTAN QIAXIMA NUCLEAR POWER STATION SERVICE ELECTRIC POWER 2013/1/7 POWER PLANT PAKISTAN
ENGINEERING CO.,
LTD
PSI INCONTROL
VARIOUS SUBSTATION Spare Parts 2013/1/7 SUBSTATION MALAYSIA
SDN.BHD
JIANGSU JIUSEHNG
PCS-985B RCS-9786A INTERNATIONAL
INDONESIA KALIMANTAN TIMUR EMBALUT
RCS-974AG2 CJX POWER 2013/1/8 POWER PLANT INDONESIA
1*60MW COAL POWER PLANT
SPARE PART MODULE ENGINEERING CO.,
LTD
CENTRAL POWER +
RCS-9794A SPARE PART
BAHRAIN 400KV EWA SUBSTATION PROCESS 2013/1/8 SUBSTATION BAHRAIN
MODULE
SYSTEMS
PSI INCONTROL
VARIOUS SUBSTATION RCS-9671 RCS-921 2013/1/15 SUBSTATION MALAYSIA
SDN.BHD
R&A POWER
VARIOUS SUBSTATION RCS-9631C INDUSTRIAL 2013/1/15 SUBSTATION MALAYSIA
DISTRIBUTION
THE NORTHERN
DELL PCS-9700SOFTWARE VIETNAM POWER
VIETNAM TUYEN QUANG 220KV SUBSTATION PCS-9882ED RCS-9698G PROJECTS 2013/1/16 SUBSTATION VIETNAM
RCS-9785C RCS-9794A PCS-9705 MANAGEMENT
BOARD
SOLUCIONES
VARIOUS SUBSTATION PCS-978 PCS-902 PCS-9611 TELEINFORMATICA 2013/1/17 SUBSTATION PERU
SY
CHINA ELECTRIC
SVC MD1501 PCS-915 PCS-9519H POWER
CAMBODIA GDHA 500KV SUBSTATION PCS-9532A PCS-9532S PCS- EQUIPMENT AND 2014/3/25 SUBSTATION CAMBODIA
9580A TECHNOLOGY
CO.,LTD(HK)
FUZHOU FENGNAN
RELAYS ELECTRIC
INDONESIA SULAWESI 2×65MW POWER PLANT CJX-02 PCS-974A PCS-985B POWER 2014/4/1 POWER PLANT INDONESIA
TECHNOLOGY
CO.,LTD
LJ POWER CO.,
KOREA LJPOWER PROJECT PCS-915IC 2014/4/1 SUBSTATION KOREA
LTD.
NATIONAL GRID
PHILIPPINES BAY SUBSTATION AC MODULE CORPORATION OF 2014/4/3 SUBSTATION PHILIPPINES
THE
NR ELECTRIC
MYANMAR THAPYEWA,BELIN SUBSTATION SERVICE INTERNATIONAL 2014/4/8 SUBSTATION MYANMAR
COMPANY L
NR ENERGY
INDIA BARMER POWER PLANT SPARE PARTS AC MODULE SOLUTIONS INDIA 2014/4/11 POWER PLANT INDIA
PVT. LTD.
SHANGHAI
HUATONG
INDONESIA MEDAN 2×200MW POWER PLANT PCS-9691 2014/4/14 POWER PLANT INDONESIA
ELECTRIC (GROUP)
CO., LTD
SHANDONG
PROVINCE
INDIA ELECTRICAL STEEL COMPOSITE CO.,
RCS-9626CN METALLURGICAL 2014/4/15 INDUSTRY INDIA
LTD 220KV EIL STATION
DESIGN INSTITUTE
CO., LTD
KSHEMA POWER &
CJX, PCS-902,PCS-9705,PCS-
INDIA TNEB 231KV KAYATHAR SUBSTATION INFRASTRUCTURE 2015/8/28 SUBSTATION INDIA
9882
COMPA
ETHIOPIAN
PCS-902,PCS-978,PCS-9611,PCS-
ETHIOPIAN EEU PROJECT ELECTRIC UTILITY 2015/8/28 SUBSTATION ETHIOPIA
915
(EEU)
RCS-9698,RCS-9785,RCS-9794,
NR ELECTRIC
HONG KONG CLP PONT HONG KONG-ZHUHAI- PCS-9705, PCS-9882,PCS-
INTERNATIONAL 2015/8/28 SUBSTATION HONG KONG
MACAO SUBSTATION(HMB) 9611,PCS-9700
COMPANY L
CHINT ELECTRIC
PAKISTAN 230KV MANSEHRA GRID PROJECT PCS-996R 2015/8/28 SUBSTATION PAKISTAN
CO.,LTD
NS.91 TRADING
THAILAND YANNI COGENERATION PROJECT RCS-9659,RCS-985G, RCS-9708C 2015/8/31 INDUSTRY THAILAND
CO,.LTD
PCS-9580,PCS-9580CD,PCS- ZONERGY
PAKISTAN 200MW PV POWERSVC PROJECT 9580S,PCS-9586C,PCS-9611,PCS- COMPANY 2015/8/31 POWER PLANT PAKISTAN
9882AD,RCS-9794A LIMITED(TIANJIN)
PCS-9611,PCS-9671,PCS-
9705A,PCS-9705B,PCS-
PAKISTAN 200MW PV POWER PROJECT CREST ZONERGY
9726A,PCS-9799B,PCS- 2015/8/31 POWER PLANT PAKISTAN
SUBSTATION COMPANY LIMITED
9882AD,PCS-9882ED,PCS-
996R,RCS-9663D,RCS-
PCS-9611,PCS-9671,PCS-
9705A,PCS-9705B,PCS-
PAKISTAN 200MW PV POWER PROJECT BEST ZONERGY
9726A,PCS-9799B,PCS- 2015/8/31 POWER PLANT PAKISTAN
GREEN SUBSTATION COMPANY LIMITED
9882AD,PCS-9882ED,PCS-
996R,RCS-9663D,RCS-
PCS-931,PCS-915,CJX, PCS-
978,PCS-974,PCS-9705,PCS-9882,
PHILIPPINE SUBIC 14.5MW PV POWER
RCS-9698,RCS-9785,RCS-9794, CSUN 2015/8/31 POWER PLANT PHILIPPINES
PROJECT
PCS-996R,PCS-9641,PCS-
9726,PCS-9611,PCS-9700
TRANSMISSION
CJX, PCS-902, PCS-9705, PCS-
INDIA 220KV TSTRANSCO PARIGI SUBSTATION CORPORATION OF 2015/8/31 SUBSTATION INDIA
9882
TELANGA
RCS-9698,RCS-9785,RCS-9794,
NR ELECTRIC
HONG KONG CLP HEUNG YUEN WAI PCS-9705, PCS-9882,PCS-
INTERNATIONAL 2015/8/31 SUBSTATION HONG KONG
SUBSTATION(HYW) 9611,PCS-9700
COMPANY L
POWERNETS
HONG KONG 132KV VARIOUS SUBSTATIONS PCS-9882BD MARKETING 2015/8/31 SUBSTATION HONG KONG
LIMITED
NR ELECTRIC
HONG KONG POWERNET LOOSE RELAY PCS-9882BD INTERNATIONAL 2015/8/31 SUBSTATION HONG KONG
COMPANY L
PCS-915IC,PCS-921,PCS-
931,PCS-9611,PCS-9651,PCS-
KENYA NAIROBI 220KV & 66KV POWER GRID
9656D,PCS-9671,PCS-9705A,PCS- TBEA 2015/8/31 SUBSTATION KENYA
PROJECT
9705BS,PCS-9705C,PCS-
974C,PCS-978,PCS-9799B,
PCS-902,PCS-9705,PCS-
9611,PCS-978, PCS-915,,PCS-
YOTEK JOINT
VIETNAM 220KV SON HA SUBSTATION 931,MUX-2M, RCS-9698,RCS- 2015/8/31 SUBSTATION VIETNAM
STOCK COMPANY
9785,RCS-9794, PCS-9882,PCS-
9700
ENERGY CHINA
GHANA POWER PLANT PROJECT CJX-02 2015/9/2 POWER PLANT GHANA
GPEC
CJ_NR1102J,CJ_NR1301T,CJ_NR
PHILIPPINE SP12.ASUP.LT-0108 PROJECT NARI GOURP 2015/9/2 SUBSTATION PHILIPPINES
1504A,CJ_NR1401
FUZHOU FENGNAN
RELAYS ELECTRIC
INDONESIA QINGSHAN INDUSTRIAL PARK
RCS-9794A,PCS-9882AD POWER 2015/9/6 INDUSTRY INDONESIA
PLANT
TECHNOLOGY
CO.,LTD
PT.PERMATA PRIMA
INDONESIA 150 KV GI SANUR, 150 KV GI ANCOL
PCS-915,PCS-9882 ELECTRICAL 2015/12/29 SUBSTATION INDONESIA
SUBSTATIONS
ENGINEE
PCS-921,PCS-9611,PCS-
INDONESIA PT. DIMENSI MULTI CAHAYA PT. DIMENSI MULTI
9671,PCS-9705C,PCS-9882ED- 2015/12/29 SUBSTATION INDONESIA
PROJECT CAHAYA
D,MD1501,MD1701
PCS-902,PCS-915IC,PCS-
LAOS 115KV THAFA SUBSTATION、115KV
9611,PCS-9705A,PCS-9794A,PCS- CCC ENGINEERING
LOUANG NAMTHA SUBSTATION、115KV NAMO 2015/12/29 SUBSTATION LAOS
9799B,PCS-9882AD,RCS- LTD
SUBSTATION
9661C,RCS-9785C
PCS-921,PCS-915,PCS-9705,RCS-
9785, PCS-221G-I-EN, PCS-221N-
COLUMBIA SURIA DIGITAL SUBSTATION INGEMA S.A. 2015/12/30 SUBSTATION COLUMBIA
I-N, PCS-222B-EN-I, PCS-
9882,PCS-9799,PCS-9700
NATIONAL GRID
BRITAIN NGC SUBSTATIONS SCS PCS-9705,PCS-9799,PCS-
ELECTRICITY 2015/12/30 SUBSTATION UK
REPLACEMENT 9882,RCS-9785,PCS-9700
TRANSMISS
NEW NORTHEAST
INDIA 400KV HAMIRPUR SUBSTATION PCS-9830 2016/1/5 SUBSTATION INDIA
ELECTRIC GROUP
LJ POWER CO.,
KOREA KEPCO 345KV SUBSTATION PCS-931,PCS-902 2016/1/7 SUBSTATION KOREA
LTD.
NR ENERGY
RCS-9622,RCS-9626,RCS-
INDIA KMPCL PLANT SPARES SOLUTIONS INDIA 2016/1/11 SUBSTATION INDIA
9627,RCS-9625
PVT. LTD.
SHANGHAI
CZX,PCS-978,PCS-974,PCS-
HENDENDI
PHILIPPINES SAN JOSE & MEXICO SUBSTATION 915,PCS-9611,MUX-2MD,PCS- 2016/1/11 SUBSTATION PHILIPPINES
INDUSTRY&TRADE
931,PCS-902
CO.,LTD
JIANGSU XINFUDA
GENERAL
INDONESIA PROJECT NR0202 2016/1/15 OTHERS INDONESIA
EQUIPMENT CO.
LTD.
SHANGHAI POWER
EQUIPMENT
PCS-985RS,PCS-9671,PCS-
INDONESIA FAJAR1×55MW PLANT PROJECT COMPLETE 2016/1/15 POWER PLANT INDONESIA
974,PCS-985TS,PCS-9659D
RESEARCH
INSTITUTE
NANJING FUTAI
ELECTRIC
TURKEY EREN PLANT PROJECT CZX-02 2016/1/15 POWER PLANT TURKEY
EQUIPMENT
CO.,LTD
BEIJING ZHONGLI
LIYUAN
US ELECTRICAL SOLAR POWER PLANT PCS-931,PCS-978,PCS-9611 ELECTRICAL 2016/1/18 POWER PLANT USA
EQUIPMENT CO.,
LTD
FUZHOU FENGNAN
PCS-9794A,PCS-9693A,PCS- RELAYS ELECTRIC
INDONESIA 10KV SULAWESI ZHONGHAO
9693D,PCS-9705C,PCS- POWER 2016/1/20 INDUSTRY INDONESIA
NICKEL PROJEC
9882AD,RCS-9212B,RCS-9211B TECHNOLOGY
CO.,LTD
NEW NORTHEAST
INDIA 400KV DEHAR SUBSTATION PCS-9830 2016/1/25 SUBSTATION INDIA
ELECTRIC GROUP
RCS-9794,RCS-9785,RCS-
9698,RCS-9671,RCS-9661,
FEDDERS LLOYD
NIGERIA 132KV DAN AGUNDI SUBSTATION RCS-902,PCS-9882,PCS-978, 2016/1/26 SUBSTATION NIGERIA
CORPORATION LTD
PCS-974,PCS-9705,PCS-
9611.PCS-921,PCS-915
FUZHOU FENGNAN
RELAYS ELECTRIC
INDONESIA QINGSHAN STAINLESS STEEL
PCS-9693D,PCS-9693A,PCS-9691 POWER 2017/7/6 INDUSTRY INDONESIA
COMPANY PROJECT
TECHNOLOGY
CO.,LTD
CHANGYUAN
HONDURAS PATUCAIII POWER STATION SHENRUI RELAY
PCS-9882,PCS-996R 2017/7/6 POWER PLANT HONDURAS
PROTECT. AUTOMATION CO.
LTD.
SHANGHAI HENGYU
INDONESIA POSO 365 MW HYDROPOWER
SERVICE INTERNATIONAL 2017/7/7 SUBSTATION INDONESIA
STATION PROJECT
TRADE CO. LTD
TONGXIANG HUAYU
THE DEMOCRATIC REPUBLIC OF CONGO 122KV POWER
PCS-9882 2017/7/11 INDUSTRY CONGO, DEM. REP.
RUSI SUBSTATION PROJECT EQUIPMENT CO.
LTD.
MD1501,MD1701,PCS-931,
BANGLADESH GULACO POWER STATION ENERGY CHINA
CJX,PCS-9655,PCS-974,PCS- 2017/7/11 POWER PLANT BANGLADESH
PROJECT GPEC
985,PCS-9882
HEBEI ELECTRIC
POWER
INDONESIA'S SURABAYA PROJECT PCS-9691C 2017/7/12 POWER PLANT INDONESIA
EQUIPMENT
CO.,LTD
KUNMING
ZHONGHUA
THE CAMBODIAN TECHNICAL SERVICE. WORKSTATION 2017/7/13 SUBSTATION CAMBODIA
ECONOMIC AND
TRADE CO. LTD.
SHENYANG
ZHONGZHEN
TAJIK OIL 10KV REACTIVE POWER
PCS-9663D POWER 2017/7/17 INDUSTRY TAJIKISTAN
COMPENSATION PROJECT
TECHNOLOGY CO.
LTD.
SHANDONG LUDIAN
INDONESIA SHENHUA 2*350MV COAL FIRED CJX,PCS-974,PCS-985,PCS-
INTERNATIONAL 2017/7/19 POWER PLANT INDONESIA
PROJECT 996,PCS-986,PCS-9882
TRADING LIMITED
NANJING SETH
CAMBODIA 230 KV SUBSTATION LOOSE MOTONG
PCS-9611 2017/7/21 SUBSTATION CAMBODIA
RELAYS TECHNOLOGY CO.
LTD.
SHANDONG
ECUADOR ESMERALDA PROJECT AC DC FENGHUI
DC SYSTEM 2017/7/21 SUBSTATION ECUADOR
SYSTEM. LOGISTICS
TRADING CO. LTD.
CONSULTANT
VIETNAM DISTRIBUTION NETWORK SUPPLY PCS-9691 2017/7/21 SUBSTATION VIETNAM
EQUIPMENT AND
LJ POWER CO.,
VIETNAM VT4 LINE PROTECT PCS-931 2017/7/25 POWER PLANT VIETNAM
LTD.
NR ELECTRIC
HONG KONG POWERNETS LOOSE RELAY_430 PCS-9611,PCS-978 INTERNATIONAL 2017/7/26 SUBSTATION HONG KONG
COMPANY L
HANNAN PINGGAO
INDIA GUDBO EXPANSION S PROJECT PCS-9830B 2017/7/28 SUBSTATION INDIA
ELECTRIC CO.,LTD
MD1501,MD1701,MUX-
INDONESIA GIS 150 KV JATINEGARA 64D,PCS-902,PCS-915,PCS- PT. TIGA DIMENSI
2017/7/28 SUBSTATION INDONESIA
SUBSTATION AUTOMATION SYSTEM. 931,PCS-9611,PCS-9705, KARYA KONTRUKSI
PCS-978,PCS-9799,PCS-9882
MEXICO 120MVAR STATCOM+60MVAR FC PCS-9631,PCS-9671,PCS- GRUPO ACERERO
2018/8/24 INDUSTRY MEXICO
PROJECT 9785,PCS-9882 SA DE CV
CONGO, DEM. REP. HITULU COPPER MINE PCS-9611, PCS-9705B, PCS- CHINT ELECTRIC
2018/8/27 INDUSTRIAL CONGO, DEM. REP.
PROJECT 9794D, PCS-9882AD-S CO.,LTD
CHINA NATIONAL
BRUNEI PMB PETROCHEMICAL INDUSTRY ENERGY POWER
LOOSE RELAYS 2018/8/27 POWER PLANT BRUNEI
STATION EPC PROJECT ENGINEERING CO.
LTD.
PCS-902,PCS-915,PCS-921,PCS-
9611,PCS-9671,PCS-9705,PCS- L&T
BOTSWANA 400KV MAWANA PROJECT 2018/8/29 SUBSTATION BOTSWANA
9710,PCS-9785,PC-978,PCS- CONSTRUCTION
9794,PCS-9799,PCS-9882
PCS-9611,PCS-9671,PCS- NR ELECTRIC
KENYA KEMP COAST REGION LOT2 9705,PCS-9785,PCS-9794,PCS- INTERNATIONAL 2018/8/29 SUBSTATION KENYA
9799,PCS-9882 COMPANY L
SHENZHEN
XINWANGDA
BRITISH MALTON 5MW/5MWH ENERGY PCS-9567, PCS-9726A, PCS-9785,
INTEGRATED 2018/8/29 SUBSTATION UK
STORAGE SYSTEM PCS-9799D, PCS-9882BD-D, PCS-
ENERGY SERVICE
9882ED-D, PCS-9893C
CO., LTD.
PCS-902, PCS-915IC, PCS-931,
PCS-9611, PCS-9705A, PCS-9785, YANTAI DONGFANG
ZAMBIA ZESCO-141-2013 132KV STATION PCS-978, PCS-9794A, PCS-9799D, WISDOM ELECTRIC 2018/8/29 SUBSTATION ZAMBIA
PCS-9882BD-S, PCS-9882ED-S, CO., LTD.
MD1501, MD1701
JIANGSU JIYI
GHANA POWER PLANT I #4-#6 PROJECT CJX, PCS-974, PCS-985 INDUSTRIAL CO. 2018/8/30 POWER PLANT GHANA
LTD.
PENGXIN GLOBAL
CONGO, DEM. REP. HITULU COPPER MINE RCS-9611C, RCS-9613C RESOURCES CO., 2018/8/31 POWER PLANT CONGO, DEM. REP.
LTD.
SHANDONG
CJX, CZX-12G, PCS-902, PCS- ELECTRIC
INDONESIA WEST KALIMANTAN 2X100MW
915, PCS-931, PCS-921, PCS- CONSTRUCTION 2018/8/31 POWER PLANT INDONESIA
COAL-FIRED POWER PLANT
9882AD-S, PCS-996R, MD1501 IRON POWER
ENGINEERING CO.,
CJX, PCS-915ID, PCS-921, PCS-
931, PCS-9611, PCS-9705A, PCS-
CHINT ELECTRIC
SRI LANKA 245KV HAMBATOTA SUBSTATION 9705C, PCS-9785, PCS-978, PCS- 2018/8/31 POWER PLANT SRI LANKA
CO.,LTD
9882ED-S, RCS-9698H, MD1501,
MD1701
PCS-902, PCS-915, PCS-921,PCS- BEIJING GUODIAN
9611, PCS-9705A, PCS-9705C, NORTH CHINA
NIGERIA 132KV AMASIRI & ABAKALIKI
PCS-9785, PCS-9794A, PCS- ELECTRIC POWER 2018/8/31 SUBSTATION NIGERIA
SUBSTATION
9799D, PCS-9882AD-S, PCS- ENGINEERING CO.,
996R, RCS-9661C, MD1501, LTD.
PCS-9567,PCS-9617,PCS-
GUNKUL POWER
THAILAND ILAND PEA MAESARIANG 9651,PCS-9710,PCS-9721,PCS-
DEVELOPMENT 2018/8/31 SUBSTATION THAILAND
MICROGRID PROJECT 9726,PCS-9785,PCS-9794,PCS-
COMPANY
9882,PCS-9892,PCS-9895
FUZHOU FENGNAN
RELAYS ELECTRIC
INDONESIA POWER PLANT II PCS-9691C POWER 2018/9/4 INDUSTRIAL INDONESIA
TECHNOLOGY
CO.,LTD
NARI BRASIL
BRAZIL TPT I SPARE PARTS MUX,PCS-902,PCS-915 2018/9/4 SUBSTATION BRAZIL
HOLDING LTDA.
NR ELECTRIC
HONG KONG CLP LOOSE RELAY_180828 PCS-9611 INTERNATIONAL 2018/9/4 SUBSTATION HONG KONG
COMPANY L
FUJIAN ELECTRIC
POWER
PHILIPPINES 69KV EASTERN ALBAY PROJECT PCS-974C 2018/9/4 SUBSTATION PHILIPPINES
ENGINEERING CO.,
LTD.
PCS-902,PCS-931,PCS-915,PCS-
ETHIOPIA ADAMA II LOT 1 TRANSMISSION 9611,PCS-9705,PCS-974,PCS- SIEYUAN ELECTRIC
2019/9/29 SUBSTATION ETHIOPIA
PROJECT 978,PCS-9785,PCS-9794,PCS- CO., LTD
9799,PCS-9882,MD1501,MD1701
MUX,PCS-931,PCS-9611,PCS-
PT. NR ELECTRIC
INDONESIA GI BUNTUK AND GI KALSELTENG 1 9705,PCS-978,PCS- 2019/9/29 SUBSTATION INDONESIA
JAKARTA
9882,MD1501,MD1701
CHINA MACHINERY
PCS-9705,PCS-9794,PCS-
MALAYSIA 45MWP BGMC PROJECT EQUIPMENT HONG 2019/9/29 SUBSTATION MALAYSIA
9799,PCS-9882
KONG CO., LTD.
POWER
PHILIPPINES 230KV NORTH LUZON MUX,PCS-931,PCS-9785,PCS- CONSTRUCTION
2019/9/29 SUBSTATION PHILIPPINES
SUBSTATION SUBSTATION 9882,PCS-996 CORPORATION OF
CHINA
CHINA ELETRIC
POWER
ETHIOPIA QORIE, MINO, UNGOGE, ALBASA PCS-9617,PCS-9705,PCS-
EQUIPMENT AND 2019/9/30 POWER PLANT ETHIOPIA
MICROGRID PROJECT 9785,PCS-9794,PCS-9882
TECHNOLOGY CO.,
LTD.
SEPCOIII ELECTRIC
UNITED ARAB EMIRATES DUBAL 550MW POWER
PCS-9705,PCS-9882 2019/9/30 POWER PLANT UAE
COMBINED CYCLE POWER PLANT CONSTRUCTION
CORPORATION
PCS-9705,PCS-9799,PCS-
9882,RCS-9698,RCS-9702,RCS- S.M.O.N TRADING
CAMBODIA EDC 2019 SPARE PARTS 2019/9/30 SUBSTATION CAMBODIA
9703,RCS-9698,RCS-9705,RCS- CO., LTD
9709,RCS-9785,RCS-9794
YOTEK JOINT
VIETNAM 220KV LAO CAI SUBSTATION MUX,PCS-931 2019/10/8 SUBSTATION VIETNAM
STOCK COMPANY
CHINT ELECTRIC
PAKISTAN NTDC 220KV AIS PROJECT SPARE PARTS 2019/10/9 SUBSTATION PAKISTAN
CO.,LTD
CJX,CZX,PCS-931,PCS-9611,PCS-
SHANGHAI DINGXIN
INDONESIA WEIDABE 150KV 2 # 3 # 9621,PCS-9631,PCS-9651,PCS-
INVESTMENT 2019/10/10 POWER PLANT INDONESIA
SUBSTATION PROJECT 9662,PCS-9705,PCS-974,PCS-
(GROUP) CO., LTD.
978,PCS-9882,PCS-996RA
S.M.O.N TRADING
CAMBODIA EDC 2019 SCADA SPARE PARTS RCS-9698,RCS-9705,RCS-9785 2019/10/10 SUBSTATION CAMBODIA
CO., LTD
THAILAND EGAT FEEDER PROTECTION DEVICE PCS-9611 SIEMENS LTD 2019/10/11 SUBSTATION THAILAND
YOTEK JOINT
VIETNAM 220KV THAP CHAM STATION SERVICE SERVICE 2019/10/14 SUBSTATION VIETNAM
STOCK COMPANY
PT. NR ELECTRIC
INDONESIA CILACAP POWER PLANT MODULE 2019/10/16 POWER PLANT INDONESIA
JAKARTA
PCS-902,PCS-931,PCS-9611,PCS- VISION
BRAZIL CEMIG-D LOOSE RELAYS 9705,PCS-978,PCS-9785,PCS- ENGENHARIA E 2019/10/16 SUBSTATION BRAZIL
9799,PCS-9882 CONSULTORIA LTD
PCS-221,PCS-9570,PCS-
INDIA 400 / 220KV JEYPORE, RENGALI AND POWER GRID
9705,PCS-996R,MD1501, 2019/11/28 SUBSTATION INDIA
BALLABHGARH SUBSTATION CORPORATION OF
MD1701
PCS-902,PCS-915,PCS-9611,PCS-
9705,PCS-9785,PCS-978,PCS-
EGYPT 66KV BENI SWEF SUBSTATION ENBLOM 2019/11/28 SUBSTATION EGYPT
9794,PCS-9799,PCS-9882,PCS-
9884,MD1501,MD1701
SHANDONG LUDIAN
INDONESIA JAVA 7 2×1050MW COAL-FIRED CJX,PCS-9655,PCS-974,PCS-
INTERNATIONAL 2019/11/28 SUBSTATION INDONESIA
POWER PROJECT 985,PCS-986,PCS-9882
TRADE CO., LTD.
JIANGSU
HAIFATONG
INDONESIA KALBAR-1 2 × 100 MW COAL-FIRED
PCS-9641 POWER 2019/11/29 POWER PLANT INDONESIA
POWER STATION PROJECT
ENGINEERING CO.,
LTD.
BEIJING
LAOS LUANG PRABANG 2000T / D CLINKER
PCS-931,PCS-9611 ZHANHONG 2019/11/29 INDUSTRY LAOS
PRODUCTION LINE PROJECT
ELECTRIC CO.,LTD
CJX,PCS-902,PCS-915,PCS-
NR ENERGY
921,PCS-9611,PCS-9705,PCS-
INDIA PGCIL 400KV SIMBHAVALI SS SOLUTIONS INDIA 2019/11/29 SUBSTATION INDIA
978,PCS-9794,PCS-996,RCS-
PVT. LTD.
9787,MD1501,MD1701
PCS-902,PCS-915,PCS-931,PCS-
9611,PCS-9705,PCS-978,PCS-
EGYPT 66KV TEBIN SUBSTATION ENBLOM 2019/11/29 SUBSTATION EGYPT
9794,PCS-9799,PCS-9882,PCS-
9884,MD1501,MD1701
PCS-902,PCS-915,PCS-921,PCS-
9611,PCS-9671,PCS-9705,PCS- SIEYUAN ELECTRIC
NIGERIA NIGERIA TNC-PIU-LOT5 & 6 PROJECT 2019/11/29 SUBSTATION NIGERIA
9799,PCS-9882,PCS- CO., LTD
996R,MD1501
PCS-902,PCS-915,PCS-9611,PCS- VISION
BRAZIL CEMIG-D LOOSE RELAYS 9705,PCS-9785,PCS-978,PCS- ENGENHARIA E 2019/12/2 SUBSTATION BRAZIL
9882 CONSULTORIA LTD
JIANGXI
SHENGGUANG
INDONESIA FAJAR 1X55MW COAL FIRED
PCS-9659 ELECTRIC POWER 2019/12/3 POWER PLANT INDONESIA
POWER PLANT
ENGINEERING CO.,
LTD.
RIZHAO SIMMENT
CEMENT
INDONESIA SB1 EPC PROJECT RCS-9624CN 2019/12/3 INDUSTRY INDONESIA
TECHNOLOGY CO.,
LTD.
NR ENERGY
INDIA TNEB 400KV THIRUVALAM SS SPARE PARTS SOLUTIONS INDIA 2019/12/3 SUBSTATION INDIA
PVT. LTD.
SHANGHAI NASIN
SERBIA KOSTOZLA POWER PLANT PCS-985 2019/12/4 POWER PLANT SERBIA
INDUSTRY CO., LTD.
PCS-902,PCS-915,PCS-9611,PCS- JSC «
TAJIKISTAN 110KV ROMIT SUBSTATION 9705,PCS-974,PCS- TOJIKGIDROELEKT 2019/12/4 SUBSTATION TAJIKISTAN
978,MD1501,MD1701 ROMONTAJ»
SCI ELECTRIC
THAILAND EGAT TS12-S-19 SARABURI 6
PCS-931,PCS-9611,PCS-978 PUBLIC COMPANY 2019/12/4 SUBSTATION THAILAND
SUBSTATION
LIMITED
CJX,PCS-902,PCS-915,PCS-
NR ENERGY
9611,PCS-9671,PCS-9705,PCS-
INDIA KPTCL 220KV MUGHELKHOD SS SOLUTIONS INDIA 2019/12/5 SUBSTATION INDIA
9785,PCS-978,PCS-9794,PCS-
PVT. LTD.
9799,PCS-9882,MD1501,MD1701
YOTEK JOINT
VIETNAM 220KV BIM SON SUBSTATION PCS-915,PCS-9611,PCS-9705 2019/12/5 SUBSTATION VIETNAM
STOCK COMPANY
CONECTA
CHILE CONECTA DEMO SYSTEM PCS-931,PCS-9641,PCS-978 2019/12/6 INDUSTRY CHILE
INGENIERIA S.A.
CJX,CZX,MUX,PCS-915IC,PCS-
THE PHILIPPINES 500KV MARILAO SUBSTATION 921,PCS-931,PCS-9611,PCS- LARSEN & TOUBRO
ORDERS PROTECTION INTEGRATED 9705C,PCS-9705CS,PCS- LIMITED, 2020/4/29 SUBSTATION PHILIPPINES
AUTOMATIC SYSTEM 978,PCS-9785,PCS-9794DS,PCS- CONSTRUCTIO
9798A,PCS-9799DS,PCS-
ARAVALI
ADANI ALWAR SUBSTATION SPARES PCS-9705A TRANSMISSION 2020/5/7 SUBSTATION INDIA
SERVICE COMPAN
FUZHOU FENGNAN
INDONESIA QINGSHAN STAINLESS STEEL RELAYS ELECTRIC
NICKEL-IRON DRYING KILN AND WEIDABE PCS-9693A,PCS-9693D POWER 2020/5/8 INDUSTRIAL INDONESIA
PROJECT TECHNOLOGY
CO.,LTD
NGK INSULATORS,
JAPAN YAMAICHI 400KW NAS PCS-9726,PCS-9882,PCS 2020/5/9 SUBSTATION JAPAN
LTD.
TBEA XINJIANG
EGYPT SUN RISE SOLAR 60MW DEVELOPMENT
PCS-915,PCS-9611 NEW ENERGY CO., 2020/5/11 POWER PLANT EGYPT
PROJECT SCADA SPARE PARTS
LTD.
FUZHOU FENGNAN
RELAYS ELECTRIC
INDONESIA KOYAMA SMELTING CO., LTD.
PCS-9693A,PCS-9693D POWER 2020/5/12 INDUSTRIAL INDONESIA
NICKEL-IRON PROJECT SUPPLEMENT
TECHNOLOGY
CO.,LTD
NATIONAL GRID
NATIONAL GRID GRIMSBY WEST-SOUTH PCS-902,PCS-931,PCS-9785,PCS-
ELECTRICITY 2020/5/15 SUBSTATION UK
HUMBERBANK SPAR 9882
TRANSMIS
TAMILNADU
INDIA TNEB 220KV NALLAMANAICKENPATTI SS RELAY 2020/5/15 SUBSTATION INDIA
TRANSMISSION C
ADVANCED
VIETNAM TEXHONG INDUSTRIAL PARK PCS-9611S,PCS-9785,PCS-
INFORMATION 2020/5/15 SUBSTATION VIETNAM
PROJECT 9794,PCS-9882
TECHNOLOGIES C
MD1501,MD1701,PCS-902,PCS-
915,PCS-9611,PCS-9705,PCS-
EGYPT 220KV EI KOM EI AHMAR SS GIZA SYSTEMS 2020/5/21 SUBSTATION EGYPT
978,PCS-9785,PCS-9882.PCS-
9884,PCS-9794,PCS-9799
CLP POWER HONG
HONG KONG CLP SERVICE_201109 SEVER 2012 2020/11/10 SUBSTATION HONG KONG
KONG LIMITED
SHANGHAI NASIN
INDONESIA QINGSHAN 350MW PROJECT PCS-985RE 2020/11/10 INDUSTRIAL INDONESIA
INDUSTRY CO., LTD.
MAAMBA
ZAMBIA MAAMBA NON-POWER PROTECTION
MODULE COLLIERIES 2020/11/10 POWER PLANT ZAMBIA
POWER BOARD
LIMITED
ZHEJIANG
INDONESIA GEELIPDO SECOND PHASE SPARE THERMAL POWER
MODULE 2020/11/11 POWER PLANT INDONESIA
PARTS CONSTRUCTION
COMPANY
SHENZHEN YITE
DEMOCRATIC REPUBLIC OF CONGO KAIPENG
RCS-9681C SUPPLY CHAIN CO., 2020/11/12 INDUSTRIAL CONGO (DRC)
TONGKUANG
LTD.
MD1501,MUX-64D,PCS-931,PCS-
PT. INFORMATION
INDONESIA 150KV LAPO SUMBA 9611,PCS-9705,PCS-9785,PCS- 2020/11/13 SUBSTATION INDONESIA
DATASYSTEM
9882BD,PCS-996R
YOTEK JOINT
VIETNAM VINH TAN SUBSTATION PCS-931 2020/11/16 SUBSTATION VIETNAM
STOCK COMPANY
PT BIRA JAYA
INDONESIA 150KV GI JATIWARINGIN PCS-9799D,PCS-9882BD 2020/11/17 SUBSTATION INDONESIA
MANDIRI PERKASA
LJ POWER CO.,
KOREA KEPCO 154KV SUBSTATION PCS-931,PCS-9611S 2020/11/17 SUBSTATION SOUTH KOREA
LTD.
PCS-9700,CJX-02,PCS-
BULGARIA SVILOCELL BIOMASS POWER 9611S,PCS-9659D,PCS-9705,PCS- JINAN BOILER
2020/11/19 POWER PLANT BULGARIA
GENERATION PROJECT 9785,PCS-9794A,PCS- GROUP CO., LTD
985GE,PCS-9882AD,PCS-9691
MD1501,MD1701,PCS-9700,MUX-
2MD,PCS-902,PCS-915IC,PCS- NARI TECHNOLOGY
EGYPT RAILWAY PROJECT ON THE 10TH OF
931,PCS-9611,PCS-9688T,PCS- DEVELOPMENT 2020/11/20 INDUSTRIAL EGYPT
RAMADAN
9705C,PCS-9785,PCS-978,PCS- CO.,LTD
9794D,PCS-9799D,PCS-
NR Reference in Tanzania
No. Project Main Product Client Status
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
400kV Singida
1 TANESCO Construction
Substation
Protection Relay:
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
400kV Dodoma (ZuZu)
2 TANESCO Construction
Substation
Protection Relay:
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
400kV LEMUGUR
3 TANESCO Construction
Substation
Protection Relay:
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
220kV Nyakanazi
4 TANESCO Construction
Substation
Protection Relay:
Protection Relay:
220kV Ubungo
5 TANESCO Construction
Substation
PCS931S / PCS902 / MD1501
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
220kV Buluyanhulu
6 TANESCO Operation
Substation
Protection Relay:
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
220kV Makambako
7 TANESCO Operation
Substation
Protection Relay:
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
220kV Songea
8 TANESCO Operation
Substation
Protection Relay:
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
220kV Madaba
9 TANESCO Operation
Substation
Protection Relay:
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
220kV Iringa
10 TANESCO Operation
Substation
Protection Relay:
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
220kV Dodoma
11 TANESCO Operation
Substation
Protection Relay:
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
220kV Singida
12 TANESCO Operation
Substation
Protection Relay:
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
220kV Shinyanga
13 TANESCO Operation
Substation
Protection Relay:
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
220kV Geita
14 TANESCO Construction
Substation
Protection Relay:
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
220kV Lugurini
15 TANESCO Construction
Substation
Protection Relay:
Substation SCADA:
PCS-9710
220kV Mtera
16 TANESCO Construction
Substation
Protection Relay:
PCS-915,PCS-9611,PCS-9705,PCS-9710,PCS-978
Address: 69, Suyuan Avenue, Jiangning, Nanjing, China
Tel: +86-25-87178888 Fax: +86-25-87178999
E-mail:NRsales@nrec.com http://www.nrec.com
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
132kV Majani Mapana
17 TANESCO Construction
Substation
Protection Relay:
Protection Relay:
132kV Kunduchi
18 TANESCO Construction
Substation
PCS978 PCS9611 MD1501
Protection Relay:
132kV MBEYA
19 TANESCO Operation
SUBSTATION
RCS-9665, RCS-9671C, PCS-9611
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
132 kV URAMBO
20 TANESCO Construction
Substation
Protection Relay:
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
132 kV NGURUKA
21 TANESCO Construction
Substation
Protection Relay:
Protection Relay:
132 kV Tabora
22 TANESCO Construction
Substation
PCS902S PCS-921S PCS978S PCS915S PCS9611S
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
132 kV IPOLE
23 TANESCO Construction
Substation
Protection Relay:
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
132 kV Inyonga
24 TANESCO Construction
Substation
Protection Relay:
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
132 kV Mpanda
25 TANESCO Construction
Substation
Protection Relay:
Substation SCADA:
PCS-9700/PCS9705/RCS9785C/RCS9794/PCS9882
33kV Ubungo
26 TANESCO Construction
Substation
Protection Relay:
Protection Relay:
33kV Mzakawe
27 TANESCO Operation
SUBSTATION
PCS-915S PCS-978S PCS611S MD1501
Protection Relay:
28 TANGA SUBSTATION TANESCO Operation
RCS-9631C
Protection Relays:
29 Supply of Spare Relay TANESCO Construction
PCS978 PCS9611
Protection Relays:
Supply of Spare Relay-
30 TANESCO Construction
Lot1
PCS-931/PCS-902/PCS978/ PCS9611
Protection Relay:
31 33kV TOL substation TANESCO Operation
RCS-9671, RCS-9681, RCS-9611, RCS-9661
Substation SCADA:
End-User Certificate
Thisis to certificate
thatNR ElectricCo.,Ltd.Withaddressat No.99, Shengtai
Road,JiangningNanjing,P.R. China 211100,whose productshave been
appliedfor NGGP500kVSan Jose SubstationProjectin Philippines.The
productshave been successfully energizedin 500kVSan Jose Substation
since2010.5as follows:
PCS-978 Transformer
ProtectionRelay,4 Sets.
Thankyou.
BestRegards.
Date: 2012-2-1
Project : Construction of Substation for Kigoma-Nyakanazi Transmission Project
Customer : Tanzania Electric Supply Company Ltd (TANESCO) TECHNICAL BID
RFB No. : PA/001/2021-2022/HQ/W/04
Reference to part of this verification report which may lead to misinterpretation is not permissible. The Rules and regulations for an
Attestation of Conformity or a Certificate based on testing of communication interfaces performed by DNV GL, June 2014 is applicable
2 REFERENCES .................................................................................................................. 5
2.1 Normative 5
2.2 Other 5
APPENDIX A ................................................................................................................................ 1
A1 Documentation (IEC 61850-4) 1
A2 Configuration file (IEC 61850-6) 2
A3 Data model (IEC 61850-7-3 and IEC 61850-7-4) 3
A4 Mapping of ACSI models and services (IEC 61850-7-2 and applicable SCSM) 6
A4.1 Application association 10
A4.2 Server & Logical Device & Logical Node & Data 14
A4.3 Data set 21
A4.4 Service Tracking 25
A4.5 Substitution 29
A4.6 Setting group control 31
A4.7 Unbuffered Reporting 40
A4.8 Buffered Reporting 53
A4.10a GOOSE Publish 72
A4.10b GOOSE Subscribe 78
A4.11 Control 85
A4.11a Control DOns 97
A4.11b Control SBOns 98
A4.11c Control DOes 100
A4.11d Control SBOes 102
A4.12 Time synchronization 105
A4.13 File transfer 108
1.1 Identifications
The following table gives the exact identification of tested equipment and test environment used for this
conformance test.
PCS-9611S
FEEDER RELAY
Communication software version: Ed2 2.00
DUT (fully tested)
Application software version: 1.00
Hardware version: NR6106-3
S/N: 3P2318150430T
NR Electric CO., Ltd.
69 Suyuan Avenue
MANUFACTURER
211102 Nanjing
China
PICS PICS for the IEC61850 Ed2 interface in PCS-S Product Family V1.0
MICS MICS for the IEC61850 Ed2 interface in PCS-S Product Family V1.0
TICS TICS for the IEC61850 Ed2 interface in PCS-S Product Family V1.0
PIXIT PIXIT for the IEC61850 Ed2 interface in PCS-S Product Family V1.0
ICD PCS-9611S.cid
SCD PCS-9611S.icd
TEST INITIATOR NR Electric CO., Ltd.
DNV GL Netherlands B.V.
Protocol Competence & Test Center
TEST FACILITY
Utrechtseweg 310-B50, Arnhem, The Netherlands
Accredited as independent Level A test lab by the UCAiug
TEST ENGINEER Sjoerd Willemsen<Sjoerd.Willemsen@dnvgl.com>
TEST SESSION May, Nanjing China
CLIENT SIMULATOR Unigrid 1.4
ANALYSER UniCA 61850 Analyzer 5.31.01
EQUIPMENT SIMULATOR Omicron ISIO-200
TIME MASTER DNVGL_SNTP.exe
PCS-902S LINE DISTANCE RELAY
PCS-931S LINE DIFFERENTIAL RELAY
DUT variants partly PCS-978S TRANSFORMER RELAY
tested PCS-9705S BAY CONTROL UNIT
PCS-915SC BUSBAR RELAY
PCS-902S.icd
PCS-931S.icd
ICD variants PCS-978S.icd
PCS-9705S.icd
PCS-915SC.icd
“Does the protocol implementation of the DUT conform to the Edition 2 of the IEC 61850 standard and the PICS, MICS,
PIXIT and ICD specifications as configured with SCD?”
To answer this question, TEST FACILITY has performed a conformance test of the IEC 61850
implementation in the DUT. This test has been performed according procedures and conditions set forth
in IEC 61850 part 10 and UCAIUG Quality Assurance Program.
TEST FACILITY is accredited/recognized by the UCAIUG to perform formal conformance tests and issue
the Level A UCAIUG certificate.
The described procedures and test results are the basis for the DNV GL Attestation of Conformity and the
UCAIug Level A certificate.
Chapter 3 describes the various relevant components for the conformance test and their configuration as
used in the conformance test, including the DUT. This chapter also gives an overview and introduction to
the various test groups that together constitute the conformance test.
Chapter 4 and 5 give an overview and summary of the test results, the conclusion(s) and
recommendations.
1.5 Glossary
2.1 Normative
The tests defined in this document are based on the following IEC 61850 documents.
IEC 61850-4, Communication networks and systems for power utility automation – Part 4: System and
project management; Edition 2.0; 2011-04.
IEC 61850-6, Communication networks and systems for power utility automation – Part 6: Configuration
description language for communication in electrical substations related to IEDs; Edition 2.0; 2009-12.
IEC 61850-7-1, Communication networks and systems for power utility automation – Part 7-1: Basic
communication structure – Principles and models; Edition 2.0; 2011-07.
IEC 61850-7-2, Communication networks and systems for power utility automation – Part 7-2: Basic
information and communication structure – Abstract communication service interface (ACSI); Edition 2.0;
2010-08.
IEC 61850-7-3, Communication networks and systems for power utility automation – Part 7-3: Basic
communication structure – Common data classes; Edition 2.0; 2010-12.
IEC 61850-7-4, Communication networks and systems for power utility automation – Part 7-4: Basic
communication structure – Compatible logical node classes and data object classes; Edition 2.0; 2010-03.
IEC 61850-8-1, Communication networks and systems for power utility automation – Part 8-1: Specific
communication service mapping (SCSM) – Mappings to MMS (ISO/IEC 9506-1 and ISO/IEC 9506-2) and
to ISO/IEC 8802-3; Edition 2.0; 2011-06.
IEC 61850-10, Communication networks and systems for power utility automation – Part 10:
Conformance testing; Edition 2.0; 2012-12.
2.2 Other
IS 9646 – OSI – Conformance testing methodology and framework.
UCA International User Group: Conformance Test Procedures for Server Devices with IEC 61850-8-1
Edition 2 Interface Revision 1.0, April 2013.
UCA International User Group: Fast Track Test Procedures Change List (TPCL) version 1.2.4 for IEC
61850 Edition 2 server test procedures revision 1.0
UCA International User Group: Quality Assurance Program for IEC Device Implementation Testing and
Test System Accreditation and Recognition, Version 2.0, 17 June, 2006.
UCA International User Group: Quality Assurance Program Addendum for IEC 61850 Specific Product
Testing, Version 1.0, March 8, 2006.
http://tissues.iec61850.com/.
CLIENT SIMULATOR
Ethernet switch
Device Under
ANALYZER Time Master
Test (DUT)
EQUIPMENT SIMULATOR
The PICS is used to select the applicable test procedures to be included in the test.
1: Basic Exchange sAss1, sAss2, sAss3, sAssN2, sAssN3, sAssN6, sSrv6, sSrv8, sSrv11, sSrv12,
sAssN4, sAssN5, sSrv1, sSrv2, sSrv3, sSrvN1e, sSrvN1f, sSrvN2, sSrvN3
sSrv4, sSrv5, sSrvN1abcd, sSrvN4
2: Data Sets sDs1, sDs10a, sDsN1ae sDs15
3: Substitution sSub1, sSub2, sSub3
4: Setting Group sSg1, sSg3, sSgN1 sSg11
Selection
4+: Setting Group sSg2, sSg4, sSg7, sSg8, sSg10, sSg12, sSg5, sSg9
Definition sSgN2, sSgN3, sSgN4, sSgN5
5: Unbuffered sRp1, sRp2, sRp3, sRp4, sRp5, sRp9, sRp8, sRp10, sRp11, sRp12, sRpN5
Reporting sRp14, sRp15, sRpN1, sRpN2, sRpN3,
sRpN4, sRpN8
6: Buffered Reporting sBr1, sBr2, sBr3, sBr4, sBr5, sBr9, sBr8, sBr10, sBr11, sBr12, sBr23, sBr24
sBr14, sBr15, sBr20, sBr21, sBr22,
sBr25, sBr26, sBr27, sBr28, sBrN1,
sBrN2, sBrN3, sBrN4, sBrN5, sBrN8
9a: GOOSE publish sGop2a, sGop3, sGop4, sGop9, sGop10, sGop1, sGop5, sGop6, sGop7, sGopN1,
sGop11 sGopN2
9b: GOOSE subscribe sGos1, sGos2, sGos3, sGos5, sGos6a, sGos4, sGos6b
sGos7, sGosN1, sGosN2, sGosN3,
sGosN4, sGosN5, sGosN6
12a: Direct control sCtl5, sCtl10, sDOns1, sDOns2 sCtl2, sCtl7, sCtl13, sCtl15, sCtl16, sCtl17,
sCtl18, sCtl19
12b: SBO control sCtl5, sCtl8, sCtl9, sCtl10, sCtl11, sCtl2, sCtl4, sCtl6, sCtl7, sCtl15, sCtl16,
sCtl25, sSBOns1, sSBOns2, sSBOns6 sCtl17, sCtl18, sCtl19, sCtl27
12c: Enhanced Direct sCtl5, sCtl10, sDOes1, sDOes2 sCtl2, sCtl7, sCtl13, sCtl14, sCtl15, sCtl16,
Control sCtl17, sCtl18, sCtl19, sCtl26
12d: Enhanced SBO sCtl5, sCtl8, sCtl9, sCtl10, sCtl11, sCtl2, sCtl4, sCtl6, sCtl7, sCtl15, sCtl16,
Control sCtl25, sSBOes1, sSBOes2, sSBOes6, sCtl17, sCtl18, sCtl19, sCtl26
sSBOes8
13: Time sync sTm1, sTm2, sTmN1 sTm3
14: File transfer sFt1, sFt2ab, sFt4, sFt5, sFtN1ab sFt2c, sFtN1c
15: Service tracking sTrk1, sTrk2, sTrk3, sTrk4, sTrk7, sTrk8,
sTrk9, sTrk17
-None
Check if the major/minor software version in the PICS documentation and the DUT Passed
sDoc1 do match (IEC61850-4). PICS shall contain the ACSI conformance statement Failed
according to IEC 61850-7-2 Annex A Inconclusive
PIXIT shall keep the entry identifiers from the PIXIT template
Check if the major/minor software version in the MICS documentation and software Passed
sDoc3 version of the DUT does match (IEC61850-4). MICS shall indicate the semantics of Failed
all non-standard Logical Nodes, Data Objects and enumerations Inconclusive
Check if the major/minor software version in the TICS documentation and software Passed
sDoc4 version of the DUT does match (IEC61850-4). TICS shall indicate that the Failed
mandatory and applicable technical issues are implemented Inconclusive
Passed
Test if the ICD configuration file validates according to the SCL schema: version
sCnf1 Failed
2007, revision B
Inconclusive
Check if the SCL configuration file used to configure the DUT corresponds with the
actual data object references, data types, data sets and pre-configured data values
Passed
(settings) exposed by the DUT on the network.
sCnf2 Failed
When more data objects are exposed, attach a list and set the test result to
Inconclusive
Passed. When less data objects are exposed the test result is Failed.
The format of the pre-configured values in SCL shall match IEC 61850-6 Table 45
Change at least 5 configurable parameters that are exposed by the DUT on the
network in the SCD configuration file, configure the DUT using the SCD Passed
sCnf3 configuration file (using the supplied configuration tool) and check the updated Failed
configuration using online services corresponds with the updated SCD file. Restore Inconclusive
the original SCD file and re-configure the DUT to its original state.
Passed
Check the ICD if the server capabilities in the IED “services” section(s) do
sCnf4 Failed
correspond with the ACSI services specified in the PICS (compare TISSUE #901)
Inconclusive
Passed
In case the control model is fixed (PIXIT) check if the ICD correctly initializes the
sCnf5 Failed
ctlModel values for all controllable objects
Inconclusive
Passed
sCnf6 Check the SCL version = "2007", revision = "B" and nameLength = 64 Failed
Inconclusive
Check the "ldName" naming structure when supported. All online object references Passed
(including data sets, control block references and object references - CDC ORG) Failed
sCnf7
shall start with the "LDevice ldName" value instead of the "IED name" + "LDevice Inconclusive
inst" Not applicable
Passed
When GOOSE subscription is supported and when SICS I43 is supported, check
Failed
sCnf8 that the IED does subscribe to the data attributes as specified in the IID or SCD
Inconclusive
Inputs – ExtRef elements.
Not applicable
The BDA for SBOw, Oper and Cancel DAtype’s and DA SBO shall be followed by a
Passed
ProtNS element with type = 8-MMS and its contents = IEC61850-8-1:2003 or
sCnf9 Failed
IEC61850-8-1:2007
Inconclusive
(IEC 61850-8-1 Subclause 25.5, TISSUE #853)
Passed
Verify presence of mandatory data objects for each LN type and data attributes for
sMdl1 Failed
each DO type. Passed when all objects/attributes are present
Inconclusive
Passed
Verify presence of conditional presence true data objects for each LN type and data
sMdl2 Failed
attributes for each DO type. Passed when all objects/attributes are present
Inconclusive
Verify non-presence of conditional presence false data objects for each LN type and Passed
sMdl3 data attributes for each DO type. Passed when these objects/attributes are not Failed
present Inconclusive
Passed
Verify data model mapping according to applicable SCSM concerning name length
sMdl4 Failed
and object expansion. Passed when mapping is according to applicable SCSM
Inconclusive
Verify data model mapping according to applicable SCSM concerning naming of Passed
sMdl6 control blocks and logs. Passed when mapping is according to applicable SCSM. Failed
Compare detailed test procedure Inconclusive
Verify type of all data objects for each LN type and all data attributes for each DO Passed
sMdl7 type. Passed when type of all objects/attributes do match with the IEC 61850-7-3, Failed
IEC 61850-7-4 and the applicable SCSM Inconclusive
Passed
Verify that the preconfigured enumerated data attribute values from the device and
sMdl8 Failed
SCL are in specified range. Passed when all values are in range
Inconclusive
Passed
Check if manufacturer specific data model extensions are implemented according to
sMdl9 Failed
the extension rules in IEC 61850-7-1 clause 14. Compare detailed test procedure
Inconclusive
Check if the order of the data attributes with the same functional constraint of the Passed
sMdl10 DO type match with IEC 61850-7-3. Passed when all attributes are in matching Failed
order Inconclusive
Check if the name length of IED, Logical Devices, Logical Nodes, data objects, data Passed
sMdl11 attributes, data sets and control blocks do not exceed the maximum length as Failed
specified in IEC 61850-7-2 clause 22.2 and SCSM Inconclusive
Passed
Check that the rules for multiple data object instantiation are kept (IEC 61850-7-1
sMdl12 Failed
clause 14.6, IEC 61850-7-4).
Inconclusive
Check if the logical device name space or the LLN0 logical node name space refers Passed
sMdl13 to Edition 2: IEC 61850-7-4:2007 or a newer revision of edition 2 (e.g. IEC 61850- Failed
7-4:2007B) Inconclusive
Passed
Check the correct use of name spaces for non-substation power utility applications Failed
sMdl14
like for example Hydro and DER. Compare detailed test procedure Inconclusive
Not applicable
No. 4852018222601
DIRECTORY - EMISSIONS
Pages
A) Documentation
Test Report 1 – 12
Directory 2
Test Regulations 3
B) Test Data
C) Appendix A
D) Appendix B
E) Appendix C
Title: EMC EMISSION Test Report Form ID-Number: EMC_WUX_F_25.01E Phone: +86 510 8820 3737 TÜV SÜD Certification and Testing (China)
Revision: 5.1 Author: Xiao Liu Fax: +86 510 8820 3636 Co., Ltd.
Effective: 2016-11-21 www.tuv-sud.cn
Developed: 2016-11-15 No.10 Huaxia Road (M), Dongting,
Wuxi, 214100
P.R.China
Page 3 of 16
Report Reference No.: 4852018222601
- EN 61000-6-3:2007
- EN 55013:2001/A2:2006
- EN 61000-3-2:2006/A1:2009/A2:2009
- EN 61000-3-3:2013
Title: EMC EMISSION Test Report Form ID-Number: EMC_WUX_F_25.01E Phone: +86 510 8820 3737 TÜV SÜD Certification and Testing (China)
Revision: 5.1 Author: Xiao Liu Fax: +86 510 8820 3636 Co., Ltd.
Effective: 2016-11-21 www.tuv-sud.cn
Developed: 2016-11-15 No.10 Huaxia Road (M), Dongting,
Wuxi, 214100
P.R.China
Page 4 of 16
Report Reference No.: 4852018222601
Symbol Definitions:
- Applicable
- Not Applicable
Title: EMC EMISSION Test Report Form ID-Number: EMC_WUX_F_25.01E Phone: +86 510 8820 3737 TÜV SÜD Certification and Testing (China)
Revision: 5.1 Author: Xiao Liu Fax: +86 510 8820 3636 Co., Ltd.
Effective: 2016-11-21 www.tuv-sud.cn
Developed: 2016-11-15 No.10 Huaxia Road (M), Dongting,
Wuxi, 214100
P.R.China
Page 5 of 16
Report Reference No.: 4852018222601
The CONDUCTED EMISSIONS (INTERFERENCE VOLTAGE) measurements were performed at the following test
location:
- Test Area - C
Title: EMC EMISSION Test Report Form ID-Number: EMC_WUX_F_25.01E Phone: +86 510 8820 3737 TÜV SÜD Certification and Testing (China)
Revision: 5.1 Author: Xiao Liu Fax: +86 510 8820 3636 Co., Ltd.
Effective: 2016-11-21 www.tuv-sud.cn
Developed: 2016-11-15 No.10 Huaxia Road (M), Dongting,
Wuxi, 214100
P.R.China
Page 6 of 16
Report Reference No.: 4852018222601
The RADIATED EMISSIONS (MAGNETIC FIELD) measurements were performed at the following test location:
- Test Area -
- 2 meters
- __ meters
Title: EMC EMISSION Test Report Form ID-Number: EMC_WUX_F_25.01E Phone: +86 510 8820 3737 TÜV SÜD Certification and Testing (China)
Revision: 5.1 Author: Xiao Liu Fax: +86 510 8820 3636 Co., Ltd.
Effective: 2016-11-21 www.tuv-sud.cn
Developed: 2016-11-15 No.10 Huaxia Road (M), Dongting,
Wuxi, 214100
P.R.China
Page 7 of 16
Report Reference No.: 4852018222601
The INTERFERENCE POWER measurements were performed by using the absorbing clamp on the mains and
interface cables in the frequency range 30 MHz - 300 MHz at the following test location :
- Test Area -
Title: EMC EMISSION Test Report Form ID-Number: EMC_WUX_F_25.01E Phone: +86 510 8820 3737 TÜV SÜD Certification and Testing (China)
Revision: 5.1 Author: Xiao Liu Fax: +86 510 8820 3636 Co., Ltd.
Effective: 2016-11-21 www.tuv-sud.cn
Developed: 2016-11-15 No.10 Huaxia Road (M), Dongting,
Wuxi, 214100
P.R.China
Page 8 of 16
Report Reference No.: 4852018222601
The RADIATED EMISSIONS (ELECTRIC FIELD) measurements, in the frequency range of 30 MHz-6000 MHz, were
tested in a horizontal and vertical polarization at the following test location:
- 3 meters
- 10 meters
Title: EMC EMISSION Test Report Form ID-Number: EMC_WUX_F_25.01E Phone: +86 510 8820 3737 TÜV SÜD Certification and Testing (China)
Revision: 5.1 Author: Xiao Liu Fax: +86 510 8820 3636 Co., Ltd.
Effective: 2016-11-21 www.tuv-sud.cn
Developed: 2016-11-15 No.10 Huaxia Road (M), Dongting,
Wuxi, 214100
P.R.China
Page 9 of 16
Report Reference No.: 4852018222601
- Test Area – H
Title: EMC EMISSION Test Report Form ID-Number: EMC_WUX_F_25.01E Phone: +86 510 8820 3737 TÜV SÜD Certification and Testing (China)
Revision: 5.1 Author: Xiao Liu Fax: +86 510 8820 3636 Co., Ltd.
Effective: 2016-11-21 www.tuv-sud.cn
Developed: 2016-11-15 No.10 Huaxia Road (M), Dongting,
Wuxi, 214100
P.R.China
Page 10 of 16
Report Reference No.: 4852018222601
- Standby
- Power on
The following peripheral devices and interface cables were connected during the testing:
Title: EMC EMISSION Test Report Form ID-Number: EMC_WUX_F_25.01E Phone: +86 510 8820 3737 TÜV SÜD Certification and Testing (China)
Revision: 5.1 Author: Xiao Liu Fax: +86 510 8820 3636 Co., Ltd.
Effective: 2016-11-21 www.tuv-sud.cn
Developed: 2016-11-15 No.10 Huaxia Road (M), Dongting,
Wuxi, 214100
P.R.China
Page 11 of 16
Report Reference No.: 4852018222601
Interference Power at the Mains and Interface Cables, 30 MHz - 300 MHz
- PASS - FAIL - NOT APPLICABLE
Minimum limit margin dB At MHz
Maximum limit exceeding -- dB At -- MHz
Comply with the limits reduces by Table 2b of EN 55014-1? - YES - NO - N/A
Remarks:
Title: EMC EMISSION Test Report Form ID-Number: EMC_WUX_F_25.01E Phone: +86 510 8820 3737 TÜV SÜD Certification and Testing (China)
Revision: 5.1 Author: Xiao Liu Fax: +86 510 8820 3636 Co., Ltd.
Effective: 2016-11-21 www.tuv-sud.cn
Developed: 2016-11-15 No.10 Huaxia Road (M), Dongting,
Wuxi, 214100
P.R.China
Technical Report No. 70.500.18.037.03-01
Dated 2019-10-23
Purpose of examination: • Inspection according to the observance of the protection aims of the
following EC directives:
2014/35/EU
• Test according to the test specification
Test result: The test results show that the presented product is in compliance with the
TPS_GCN_F_09.20E – Rev. 1
specified requirements.
2012-10-29
This technical report may only be quoted in full. Any use for advertising purposes must be granted in writing. This report is the
result of a single examination of the object in question and is not generally applicable evaluation of the quality of other products in
regular production.
1.1 Function
Not applicable
Covered through the applied standard
Covered by the following comment
Covered by attached risk analysis
2 Order
2019-10-11
2012-10-29
2019-10-16
69 Suyuan Avenue, Jiangning, 211102 Nanjing, Jiangsu, People's Republic of China
2019-10-16 to 2019-10-18
None
3 Test Results
4 Remark
The user manual has been examined according to the minimum requirements described
in the product standard. The manufacturer is responsible for the accuracy of further par-
ticulars as well as of the composition and layout.
The assembly of the product has to comply with the documentation (CDF). Before the
implementation of safety relevant modifications to the product into the ongoing produc-
TPS_GCN_F_09.20E – Rev. 1
tion the product must be retested for acceptance. The results must be implemented to
the documentation and if necessary the certificate must be updated.
4.2 The user manual has been examined according to the minimum requirements de-
scribed in the product standard. The manufacturer is responsible for the accuracy of
further particulars as well as of the composition and layout.
4.3 When the product is placed on the market, it must be accompanied with safety Instruc-
2012-10-29
tions written in official language of the country. The instructions shall give information
regarding safe operation, installation and maintenance.
4.5 The manufacturer/ Importer has to ensure the appliance placing on the EU market con-
forms to the applicable EU directives which provide the affixing of the CE marking,
such as LVD, EMC, RoHS, ErP, and so on. (for EU directive project of electrical equip-
ment)
4.6 All applicable hazards from EU directive LVD 2014/35/EU are covered by harmonized
standard EN 60255-27:2014 (for EU directive project which risk analysis is required by
directive)
5 Documentation
6 Summary
TÜV SÜD Certification and Testing (China) Co., Ltd. Shanghai Branch
TÜV SÜD Group
TPS_GCN_F_09.20E – Rev. 1
No. 4852018222601
DIRECTORY - EMISSIONS
Pages
A) Documentation
Test Report 1 – 12
Directory 2
Test Regulations 3
B) Test Data
C) Appendix A
D) Appendix B
E) Appendix C
Title: EMC EMISSION Test Report Form ID-Number: EMC_WUX_F_25.01E Phone: +86 510 8820 3737 TÜV SÜD Certification and Testing (China)
Revision: 5.1 Author: Xiao Liu Fax: +86 510 8820 3636 Co., Ltd.
Effective: 2016-11-21 www.tuv-sud.cn
Developed: 2016-11-15 No.10 Huaxia Road (M), Dongting,
Wuxi, 214100
P.R.China
Page 3 of 16
Report Reference No.: 4852018222601
- EN 61000-6-3:2007
- EN 55013:2001/A2:2006
- EN 61000-3-2:2006/A1:2009/A2:2009
- EN 61000-3-3:2013
Title: EMC EMISSION Test Report Form ID-Number: EMC_WUX_F_25.01E Phone: +86 510 8820 3737 TÜV SÜD Certification and Testing (China)
Revision: 5.1 Author: Xiao Liu Fax: +86 510 8820 3636 Co., Ltd.
Effective: 2016-11-21 www.tuv-sud.cn
Developed: 2016-11-15 No.10 Huaxia Road (M), Dongting,
Wuxi, 214100
P.R.China
Page 4 of 16
Report Reference No.: 4852018222601
Symbol Definitions:
- Applicable
- Not Applicable
Title: EMC EMISSION Test Report Form ID-Number: EMC_WUX_F_25.01E Phone: +86 510 8820 3737 TÜV SÜD Certification and Testing (China)
Revision: 5.1 Author: Xiao Liu Fax: +86 510 8820 3636 Co., Ltd.
Effective: 2016-11-21 www.tuv-sud.cn
Developed: 2016-11-15 No.10 Huaxia Road (M), Dongting,
Wuxi, 214100
P.R.China
Page 5 of 16
Report Reference No.: 4852018222601
The CONDUCTED EMISSIONS (INTERFERENCE VOLTAGE) measurements were performed at the following test
location:
- Test Area - C
Title: EMC EMISSION Test Report Form ID-Number: EMC_WUX_F_25.01E Phone: +86 510 8820 3737 TÜV SÜD Certification and Testing (China)
Revision: 5.1 Author: Xiao Liu Fax: +86 510 8820 3636 Co., Ltd.
Effective: 2016-11-21 www.tuv-sud.cn
Developed: 2016-11-15 No.10 Huaxia Road (M), Dongting,
Wuxi, 214100
P.R.China
Page 6 of 16
Report Reference No.: 4852018222601
The RADIATED EMISSIONS (MAGNETIC FIELD) measurements were performed at the following test location:
- Test Area -
- 2 meters
- __ meters
Title: EMC EMISSION Test Report Form ID-Number: EMC_WUX_F_25.01E Phone: +86 510 8820 3737 TÜV SÜD Certification and Testing (China)
Revision: 5.1 Author: Xiao Liu Fax: +86 510 8820 3636 Co., Ltd.
Effective: 2016-11-21 www.tuv-sud.cn
Developed: 2016-11-15 No.10 Huaxia Road (M), Dongting,
Wuxi, 214100
P.R.China
Page 7 of 16
Report Reference No.: 4852018222601
The INTERFERENCE POWER measurements were performed by using the absorbing clamp on the mains and
interface cables in the frequency range 30 MHz - 300 MHz at the following test location :
- Test Area -
Title: EMC EMISSION Test Report Form ID-Number: EMC_WUX_F_25.01E Phone: +86 510 8820 3737 TÜV SÜD Certification and Testing (China)
Revision: 5.1 Author: Xiao Liu Fax: +86 510 8820 3636 Co., Ltd.
Effective: 2016-11-21 www.tuv-sud.cn
Developed: 2016-11-15 No.10 Huaxia Road (M), Dongting,
Wuxi, 214100
P.R.China
Page 8 of 16
Report Reference No.: 4852018222601
The RADIATED EMISSIONS (ELECTRIC FIELD) measurements, in the frequency range of 30 MHz-6000 MHz, were
tested in a horizontal and vertical polarization at the following test location:
- 3 meters
- 10 meters
Title: EMC EMISSION Test Report Form ID-Number: EMC_WUX_F_25.01E Phone: +86 510 8820 3737 TÜV SÜD Certification and Testing (China)
Revision: 5.1 Author: Xiao Liu Fax: +86 510 8820 3636 Co., Ltd.
Effective: 2016-11-21 www.tuv-sud.cn
Developed: 2016-11-15 No.10 Huaxia Road (M), Dongting,
Wuxi, 214100
P.R.China
Page 9 of 16
Report Reference No.: 4852018222601
- Test Area – H
Title: EMC EMISSION Test Report Form ID-Number: EMC_WUX_F_25.01E Phone: +86 510 8820 3737 TÜV SÜD Certification and Testing (China)
Revision: 5.1 Author: Xiao Liu Fax: +86 510 8820 3636 Co., Ltd.
Effective: 2016-11-21 www.tuv-sud.cn
Developed: 2016-11-15 No.10 Huaxia Road (M), Dongting,
Wuxi, 214100
P.R.China
Page 10 of 16
Report Reference No.: 4852018222601
- Standby
- Power on
The following peripheral devices and interface cables were connected during the testing:
Title: EMC EMISSION Test Report Form ID-Number: EMC_WUX_F_25.01E Phone: +86 510 8820 3737 TÜV SÜD Certification and Testing (China)
Revision: 5.1 Author: Xiao Liu Fax: +86 510 8820 3636 Co., Ltd.
Effective: 2016-11-21 www.tuv-sud.cn
Developed: 2016-11-15 No.10 Huaxia Road (M), Dongting,
Wuxi, 214100
P.R.China
Page 11 of 16
Report Reference No.: 4852018222601
Interference Power at the Mains and Interface Cables, 30 MHz - 300 MHz
- PASS - FAIL - NOT APPLICABLE
Minimum limit margin dB At MHz
Maximum limit exceeding -- dB At -- MHz
Comply with the limits reduces by Table 2b of EN 55014-1? - YES - NO - N/A
Remarks:
Title: EMC EMISSION Test Report Form ID-Number: EMC_WUX_F_25.01E Phone: +86 510 8820 3737 TÜV SÜD Certification and Testing (China)
Revision: 5.1 Author: Xiao Liu Fax: +86 510 8820 3636 Co., Ltd.
Effective: 2016-11-21 www.tuv-sud.cn
Developed: 2016-11-15 No.10 Huaxia Road (M), Dongting,
Wuxi, 214100
P.R.China
Technical Report No. 70.500.18.037.03-01
Dated 2019-10-23
Purpose of examination: • Inspection according to the observance of the protection aims of the
following EC directives:
2014/35/EU
• Test according to the test specification
Test result: The test results show that the presented product is in compliance with the
TPS_GCN_F_09.20E – Rev. 1
specified requirements.
2012-10-29
This technical report may only be quoted in full. Any use for advertising purposes must be granted in writing. This report is the
result of a single examination of the object in question and is not generally applicable evaluation of the quality of other products in
regular production.
1.1 Function
Not applicable
Covered through the applied standard
Covered by the following comment
Covered by attached risk analysis
2 Order
2019-10-11
2012-10-29
2019-10-16
69 Suyuan Avenue, Jiangning, 211102 Nanjing, Jiangsu, People's Republic of China
2019-10-16 to 2019-10-18
None
3 Test Results
4 Remark
The user manual has been examined according to the minimum requirements described
in the product standard. The manufacturer is responsible for the accuracy of further par-
ticulars as well as of the composition and layout.
The assembly of the product has to comply with the documentation (CDF). Before the
implementation of safety relevant modifications to the product into the ongoing produc-
TPS_GCN_F_09.20E – Rev. 1
tion the product must be retested for acceptance. The results must be implemented to
the documentation and if necessary the certificate must be updated.
4.2 The user manual has been examined according to the minimum requirements de-
scribed in the product standard. The manufacturer is responsible for the accuracy of
further particulars as well as of the composition and layout.
4.3 When the product is placed on the market, it must be accompanied with safety Instruc-
2012-10-29
tions written in official language of the country. The instructions shall give information
regarding safe operation, installation and maintenance.
4.5 The manufacturer/ Importer has to ensure the appliance placing on the EU market con-
forms to the applicable EU directives which provide the affixing of the CE marking,
such as LVD, EMC, RoHS, ErP, and so on. (for EU directive project of electrical equip-
ment)
4.6 All applicable hazards from EU directive LVD 2014/35/EU are covered by harmonized
standard EN 60255-27:2014 (for EU directive project which risk analysis is required by
directive)
5 Documentation
6 Summary
TÜV SÜD Certification and Testing (China) Co., Ltd. Shanghai Branch
TÜV SÜD Group
TPS_GCN_F_09.20E – Rev. 1
Reference to part of this verification report which may lead to misinterpretation is not permissible. The Rules and regulations for an
Attestation of Conformity or a Certificate based on testing of communication interfaces performed by DNV GL, June 2014 is applicable
2 REFERENCES .................................................................................................................. 5
2.1 Normative 5
2.2 Other 5
APPENDIX A ................................................................................................................................ 1
A1 Documentation (IEC 61850-4) 1
A2 Configuration file (IEC 61850-6) 2
A3 Data model (IEC 61850-7-3 and IEC 61850-7-4) 3
A4 Mapping of ACSI models and services (IEC 61850-7-2 and applicable SCSM) 6
A4.1 Application association 10
A4.2 Server & Logical Device & Logical Node & Data 14
A4.3 Data set 21
A4.4 Service Tracking 25
A4.5 Substitution 29
A4.6 Setting group control 31
A4.7 Unbuffered Reporting 40
A4.8 Buffered Reporting 53
A4.10a GOOSE Publish 72
A4.10b GOOSE Subscribe 78
A4.11 Control 85
A4.11a Control DOns 97
A4.11b Control SBOns 98
A4.11c Control DOes 100
A4.11d Control SBOes 102
A4.12 Time synchronization 105
A4.13 File transfer 108
1.1 Identifications
The following table gives the exact identification of tested equipment and test environment used for this
conformance test.
PCS-9611S
FEEDER RELAY
Communication software version: Ed2 2.00
DUT (fully tested)
Application software version: 1.00
Hardware version: NR6106-3
S/N: 3P2318150430T
NR Electric CO., Ltd.
69 Suyuan Avenue
MANUFACTURER
211102 Nanjing
China
PICS PICS for the IEC61850 Ed2 interface in PCS-S Product Family V1.0
MICS MICS for the IEC61850 Ed2 interface in PCS-S Product Family V1.0
TICS TICS for the IEC61850 Ed2 interface in PCS-S Product Family V1.0
PIXIT PIXIT for the IEC61850 Ed2 interface in PCS-S Product Family V1.0
ICD PCS-9611S.cid
SCD PCS-9611S.icd
TEST INITIATOR NR Electric CO., Ltd.
DNV GL Netherlands B.V.
Protocol Competence & Test Center
TEST FACILITY
Utrechtseweg 310-B50, Arnhem, The Netherlands
Accredited as independent Level A test lab by the UCAiug
TEST ENGINEER Sjoerd Willemsen<Sjoerd.Willemsen@dnvgl.com>
TEST SESSION May, Nanjing China
CLIENT SIMULATOR Unigrid 1.4
ANALYSER UniCA 61850 Analyzer 5.31.01
EQUIPMENT SIMULATOR Omicron ISIO-200
TIME MASTER DNVGL_SNTP.exe
PCS-902S LINE DISTANCE RELAY
PCS-931S LINE DIFFERENTIAL RELAY
DUT variants partly PCS-978S TRANSFORMER RELAY
tested PCS-9705S BAY CONTROL UNIT
PCS-915SC BUSBAR RELAY
PCS-902S.icd
PCS-931S.icd
ICD variants PCS-978S.icd
PCS-9705S.icd
PCS-915SC.icd
“Does the protocol implementation of the DUT conform to the Edition 2 of the IEC 61850 standard and the PICS, MICS,
PIXIT and ICD specifications as configured with SCD?”
To answer this question, TEST FACILITY has performed a conformance test of the IEC 61850
implementation in the DUT. This test has been performed according procedures and conditions set forth
in IEC 61850 part 10 and UCAIUG Quality Assurance Program.
TEST FACILITY is accredited/recognized by the UCAIUG to perform formal conformance tests and issue
the Level A UCAIUG certificate.
The described procedures and test results are the basis for the DNV GL Attestation of Conformity and the
UCAIug Level A certificate.
Chapter 3 describes the various relevant components for the conformance test and their configuration as
used in the conformance test, including the DUT. This chapter also gives an overview and introduction to
the various test groups that together constitute the conformance test.
Chapter 4 and 5 give an overview and summary of the test results, the conclusion(s) and
recommendations.
1.5 Glossary
2.1 Normative
The tests defined in this document are based on the following IEC 61850 documents.
IEC 61850-4, Communication networks and systems for power utility automation – Part 4: System and
project management; Edition 2.0; 2011-04.
IEC 61850-6, Communication networks and systems for power utility automation – Part 6: Configuration
description language for communication in electrical substations related to IEDs; Edition 2.0; 2009-12.
IEC 61850-7-1, Communication networks and systems for power utility automation – Part 7-1: Basic
communication structure – Principles and models; Edition 2.0; 2011-07.
IEC 61850-7-2, Communication networks and systems for power utility automation – Part 7-2: Basic
information and communication structure – Abstract communication service interface (ACSI); Edition 2.0;
2010-08.
IEC 61850-7-3, Communication networks and systems for power utility automation – Part 7-3: Basic
communication structure – Common data classes; Edition 2.0; 2010-12.
IEC 61850-7-4, Communication networks and systems for power utility automation – Part 7-4: Basic
communication structure – Compatible logical node classes and data object classes; Edition 2.0; 2010-03.
IEC 61850-8-1, Communication networks and systems for power utility automation – Part 8-1: Specific
communication service mapping (SCSM) – Mappings to MMS (ISO/IEC 9506-1 and ISO/IEC 9506-2) and
to ISO/IEC 8802-3; Edition 2.0; 2011-06.
IEC 61850-10, Communication networks and systems for power utility automation – Part 10:
Conformance testing; Edition 2.0; 2012-12.
2.2 Other
IS 9646 – OSI – Conformance testing methodology and framework.
UCA International User Group: Conformance Test Procedures for Server Devices with IEC 61850-8-1
Edition 2 Interface Revision 1.0, April 2013.
UCA International User Group: Fast Track Test Procedures Change List (TPCL) version 1.2.4 for IEC
61850 Edition 2 server test procedures revision 1.0
UCA International User Group: Quality Assurance Program for IEC Device Implementation Testing and
Test System Accreditation and Recognition, Version 2.0, 17 June, 2006.
UCA International User Group: Quality Assurance Program Addendum for IEC 61850 Specific Product
Testing, Version 1.0, March 8, 2006.
http://tissues.iec61850.com/.
CLIENT SIMULATOR
Ethernet switch
Device Under
ANALYZER Time Master
Test (DUT)
EQUIPMENT SIMULATOR
The PICS is used to select the applicable test procedures to be included in the test.
1: Basic Exchange sAss1, sAss2, sAss3, sAssN2, sAssN3, sAssN6, sSrv6, sSrv8, sSrv11, sSrv12,
sAssN4, sAssN5, sSrv1, sSrv2, sSrv3, sSrvN1e, sSrvN1f, sSrvN2, sSrvN3
sSrv4, sSrv5, sSrvN1abcd, sSrvN4
2: Data Sets sDs1, sDs10a, sDsN1ae sDs15
3: Substitution sSub1, sSub2, sSub3
4: Setting Group sSg1, sSg3, sSgN1 sSg11
Selection
4+: Setting Group sSg2, sSg4, sSg7, sSg8, sSg10, sSg12, sSg5, sSg9
Definition sSgN2, sSgN3, sSgN4, sSgN5
5: Unbuffered sRp1, sRp2, sRp3, sRp4, sRp5, sRp9, sRp8, sRp10, sRp11, sRp12, sRpN5
Reporting sRp14, sRp15, sRpN1, sRpN2, sRpN3,
sRpN4, sRpN8
6: Buffered Reporting sBr1, sBr2, sBr3, sBr4, sBr5, sBr9, sBr8, sBr10, sBr11, sBr12, sBr23, sBr24
sBr14, sBr15, sBr20, sBr21, sBr22,
sBr25, sBr26, sBr27, sBr28, sBrN1,
sBrN2, sBrN3, sBrN4, sBrN5, sBrN8
9a: GOOSE publish sGop2a, sGop3, sGop4, sGop9, sGop10, sGop1, sGop5, sGop6, sGop7, sGopN1,
sGop11 sGopN2
9b: GOOSE subscribe sGos1, sGos2, sGos3, sGos5, sGos6a, sGos4, sGos6b
sGos7, sGosN1, sGosN2, sGosN3,
sGosN4, sGosN5, sGosN6
12a: Direct control sCtl5, sCtl10, sDOns1, sDOns2 sCtl2, sCtl7, sCtl13, sCtl15, sCtl16, sCtl17,
sCtl18, sCtl19
12b: SBO control sCtl5, sCtl8, sCtl9, sCtl10, sCtl11, sCtl2, sCtl4, sCtl6, sCtl7, sCtl15, sCtl16,
sCtl25, sSBOns1, sSBOns2, sSBOns6 sCtl17, sCtl18, sCtl19, sCtl27
12c: Enhanced Direct sCtl5, sCtl10, sDOes1, sDOes2 sCtl2, sCtl7, sCtl13, sCtl14, sCtl15, sCtl16,
Control sCtl17, sCtl18, sCtl19, sCtl26
12d: Enhanced SBO sCtl5, sCtl8, sCtl9, sCtl10, sCtl11, sCtl2, sCtl4, sCtl6, sCtl7, sCtl15, sCtl16,
Control sCtl25, sSBOes1, sSBOes2, sSBOes6, sCtl17, sCtl18, sCtl19, sCtl26
sSBOes8
13: Time sync sTm1, sTm2, sTmN1 sTm3
14: File transfer sFt1, sFt2ab, sFt4, sFt5, sFtN1ab sFt2c, sFtN1c
15: Service tracking sTrk1, sTrk2, sTrk3, sTrk4, sTrk7, sTrk8,
sTrk9, sTrk17
-None
Check if the major/minor software version in the PICS documentation and the DUT Passed
sDoc1 do match (IEC61850-4). PICS shall contain the ACSI conformance statement Failed
according to IEC 61850-7-2 Annex A Inconclusive
PIXIT shall keep the entry identifiers from the PIXIT template
Check if the major/minor software version in the MICS documentation and software Passed
sDoc3 version of the DUT does match (IEC61850-4). MICS shall indicate the semantics of Failed
all non-standard Logical Nodes, Data Objects and enumerations Inconclusive
Check if the major/minor software version in the TICS documentation and software Passed
sDoc4 version of the DUT does match (IEC61850-4). TICS shall indicate that the Failed
mandatory and applicable technical issues are implemented Inconclusive
Passed
Test if the ICD configuration file validates according to the SCL schema: version
sCnf1 Failed
2007, revision B
Inconclusive
Check if the SCL configuration file used to configure the DUT corresponds with the
actual data object references, data types, data sets and pre-configured data values
Passed
(settings) exposed by the DUT on the network.
sCnf2 Failed
When more data objects are exposed, attach a list and set the test result to
Inconclusive
Passed. When less data objects are exposed the test result is Failed.
The format of the pre-configured values in SCL shall match IEC 61850-6 Table 45
Change at least 5 configurable parameters that are exposed by the DUT on the
network in the SCD configuration file, configure the DUT using the SCD Passed
sCnf3 configuration file (using the supplied configuration tool) and check the updated Failed
configuration using online services corresponds with the updated SCD file. Restore Inconclusive
the original SCD file and re-configure the DUT to its original state.
Passed
Check the ICD if the server capabilities in the IED “services” section(s) do
sCnf4 Failed
correspond with the ACSI services specified in the PICS (compare TISSUE #901)
Inconclusive
Passed
In case the control model is fixed (PIXIT) check if the ICD correctly initializes the
sCnf5 Failed
ctlModel values for all controllable objects
Inconclusive
Passed
sCnf6 Check the SCL version = "2007", revision = "B" and nameLength = 64 Failed
Inconclusive
Check the "ldName" naming structure when supported. All online object references Passed
(including data sets, control block references and object references - CDC ORG) Failed
sCnf7
shall start with the "LDevice ldName" value instead of the "IED name" + "LDevice Inconclusive
inst" Not applicable
Passed
When GOOSE subscription is supported and when SICS I43 is supported, check
Failed
sCnf8 that the IED does subscribe to the data attributes as specified in the IID or SCD
Inconclusive
Inputs – ExtRef elements.
Not applicable
The BDA for SBOw, Oper and Cancel DAtype’s and DA SBO shall be followed by a
Passed
ProtNS element with type = 8-MMS and its contents = IEC61850-8-1:2003 or
sCnf9 Failed
IEC61850-8-1:2007
Inconclusive
(IEC 61850-8-1 Subclause 25.5, TISSUE #853)
Passed
Verify presence of mandatory data objects for each LN type and data attributes for
sMdl1 Failed
each DO type. Passed when all objects/attributes are present
Inconclusive
Passed
Verify presence of conditional presence true data objects for each LN type and data
sMdl2 Failed
attributes for each DO type. Passed when all objects/attributes are present
Inconclusive
Verify non-presence of conditional presence false data objects for each LN type and Passed
sMdl3 data attributes for each DO type. Passed when these objects/attributes are not Failed
present Inconclusive
Passed
Verify data model mapping according to applicable SCSM concerning name length
sMdl4 Failed
and object expansion. Passed when mapping is according to applicable SCSM
Inconclusive
Verify data model mapping according to applicable SCSM concerning naming of Passed
sMdl6 control blocks and logs. Passed when mapping is according to applicable SCSM. Failed
Compare detailed test procedure Inconclusive
Verify type of all data objects for each LN type and all data attributes for each DO Passed
sMdl7 type. Passed when type of all objects/attributes do match with the IEC 61850-7-3, Failed
IEC 61850-7-4 and the applicable SCSM Inconclusive
Passed
Verify that the preconfigured enumerated data attribute values from the device and
sMdl8 Failed
SCL are in specified range. Passed when all values are in range
Inconclusive
Passed
Check if manufacturer specific data model extensions are implemented according to
sMdl9 Failed
the extension rules in IEC 61850-7-1 clause 14. Compare detailed test procedure
Inconclusive
Check if the order of the data attributes with the same functional constraint of the Passed
sMdl10 DO type match with IEC 61850-7-3. Passed when all attributes are in matching Failed
order Inconclusive
Check if the name length of IED, Logical Devices, Logical Nodes, data objects, data Passed
sMdl11 attributes, data sets and control blocks do not exceed the maximum length as Failed
specified in IEC 61850-7-2 clause 22.2 and SCSM Inconclusive
Passed
Check that the rules for multiple data object instantiation are kept (IEC 61850-7-1
sMdl12 Failed
clause 14.6, IEC 61850-7-4).
Inconclusive
Check if the logical device name space or the LLN0 logical node name space refers Passed
sMdl13 to Edition 2: IEC 61850-7-4:2007 or a newer revision of edition 2 (e.g. IEC 61850- Failed
7-4:2007B) Inconclusive
Passed
Check the correct use of name spaces for non-substation power utility applications Failed
sMdl14
like for example Hydro and DER. Compare detailed test procedure Inconclusive
Not applicable
ÜÒÊ ÙÔ Ò»¬¸»®´¿²¼- ÞòÊò ˬ®»½¸¬-»©»¹ íïðóÞëðô êèïî ßÎ ß®²¸»³ô ÐòÑò Þ±¨ çðíëô êèðð ÛÌ ß®²¸»³ô ¬¸» Ò»¬¸»®´¿²¼-
Ì õíï îê íëê çïïï Ú õíï îê íëï íê èí -¿´»-¼»-µà¼²ª¹´ò½±³ ©©©ò¼²ª¹´ò½±³ п¹» îñî
ATTESTATION OF CONFORMITY
10080975-INC 18-2907
The product has not been shown to be non-conforming to the specified protocol standard. The conformance
test has been performed according to IEC 62439-3 Edition 3 (IS 2016) with and the NR Electric default
Protocol Implementation Conformance Statement for PRP/HSR PICS version 1.0.
This Attestation is granted on account of tests made at location of NR Electric in Nanjing, China and performed
with DNV GL UniSwitch version 1.6 (September 2018). The results, including remarks and limitations, are laid
down in DNV GL report no. 10080975-INC 18-2416 for PRP and 10080975-INC 18-2906 for HSR.
The tests have been carried out on one single specimen of the product, submitted by NR Electric. The
Attestation does not include an assessment of the manufacturer's production. Conformity of his production with
the specimen tested by DNV GL is not the responsibility of DNV GL.
Arnhem, 21-09-2018
The product has not been shown to be non-conforming to the specified protocol standard. The conformance
test has been performed according to IEC 62439-3 Edition 3 (IS 2016) with and the NR Electric default
Protocol Implementation Conformance Statement for PRP/HSR PICS version 1.1.
This Attestation is granted on account of tests made at location of NR Electric in Nanjing, China and performed
with DNV GL UniSwitch version 1.7 (June 2019). The results, including remarks and limitations, are laid down
in DNV GL report no. 10159938 INC 19-2750 for PRP and 10159938 INC 19-2751 for HSR.
The tests have been carried out on one single specimen of the product, submitted by NR Electric. The
Attestation does not include an assessment of the manufacturer's production. Conformity of his production with
the specimen tested by DNV GL is not the responsibility of DNV GL.
Arnhem, 26-07-2019
The product has not been shown to be non-conforming to the specified protocol standard. The conformance
test has been performed according to IEC 62439-3 Edition 3 (IS 2016) with and the NR Electric default
Protocol Implementation Conformance Statement for PRP/HSR PICS version 1.0.
This Attestation is granted on account of tests made at location of NR Electric in Nanjing, China and performed
with DNV GL UniSwitch version 1.6 (September 2018). The results, including remarks and limitations, are laid
down in DNV GL report no. 10080975-INC 18-2410 for PRP and 10080975-INC 18-2904 for HSR.
The tests have been carried out on one single specimen of the product, submitted by NR Electric. The
Attestation does not include an assessment of the manufacturer's production. Conformity of his production with
the specimen tested by DNV GL is not the responsibility of DNV GL.
Arnhem, 21-09-2018
The product has not been shown to be non-conforming to the specified protocol standard. The conformance
test has been performed according to IEC 62439-3 Edition 3 (IS 2016) with and the NR Electric default
Protocol Implementation Conformance Statement for PRP/HSR PICS version 1.0.
This Attestation is granted on account of tests made at location of NR Electric in Nanjing, China and performed
with DNV GL UniSwitch version 1.6 (September 2018). The results, including remarks and limitations, are laid
down in DNV GL report no. 10080975-INC 18-2444 for PRP and 10080975-INC 18-2898 for HSR.
The tests have been carried out on one single specimen of the product, submitted by NR Electric. The
Attestation does not include an assessment of the manufacturer's production. Conformity of his production with
the specimen tested by DNV GL is not the responsibility of DNV GL.
Arnhem, 21-09-2018
The product has not been shown to be non-conforming to the specified protocol standard. The conformance
test has been performed according to IEC 62439-3 Edition 3 (IS 2016) with and the NR Electric default
Protocol Implementation Conformance Statement for PRP/HSR PICS version 1.0.
This Attestation is granted on account of tests made at location of NR Electric in Nanjing, China and performed
with DNV GL UniSwitch version 1.6 (September 2018). The results, including remarks and limitations, are laid
down in DNV GL report no. 10080975-INC 18-2447 for PRP and 10080975-INC 18-2902 for HSR.
The tests have been carried out on one single specimen of the product, submitted by NR Electric. The
Attestation does not include an assessment of the manufacturer's production. Conformity of his production with
the specimen tested by DNV GL is not the responsibility of DNV GL.
Arnhem, 21-09-2018
The product has not been shown to be non-conforming to the specified protocol standard. The conformance
test has been performed according to IEC 62439-3 Edition 3 (IS 2016) with and the NR Electric default
Protocol Implementation Conformance Statement for PRP/HSR PICS version 1.0.
This Attestation is granted on account of tests made at location of NR Electric in Nanjing, China and performed
with DNV GL UniSwitch version 1.6 (September 2018). The results, including remarks and limitations, are laid
down in DNV GL report no. 10080975-INC 18-2448 for PRP and 10080975-INC 18-2896 for HSR.
The tests have been carried out on one single specimen of the product, submitted by NR Electric. The
Attestation does not include an assessment of the manufacturer's production. Conformity of his production with
the specimen tested by DNV GL is not the responsibility of DNV GL.
Arnhem, 21-09-2018
The product has not been shown to be non-conforming to the specified protocol standard. The conformance
test has been performed according to IEC 62439-3 Edition 3 (IS 2016) with and the NR Electric default
Protocol Implementation Conformance Statement for PRP/HSR PICS version 1.0.
This Attestation is granted on account of tests made at location of NR Electric in Nanjing, China and performed
with DNV GL UniSwitch version 1.6 (September 2018). The results, including remarks and limitations, are laid
down in DNV GL report no. 10080975-INC 18-2422 for PRP and 10080975-INC 18-2900 for HSR.
The tests have been carried out on one single specimen of the product, submitted by NR Electric. The
Attestation does not include an assessment of the manufacturer's production. Conformity of his production with
the specimen tested by DNV GL is not the responsibility of DNV GL.
Arnhem, 21-09-2018
Drawings
PCS-9794*1
13.PCS-9785:GPS Syn Relay PCS-9785*1
SAS LAN
Support IEC61850
Net work A
Net work B
Control Panel Metering Panel 33kV GIS
Anounciators
Anounciators En ergy Meter En ergy Meter
PCS-9705S*2 PCS-9705S*1 PCS-9705S PCS-9705S*1 PCS-9705S*1
PCS-9705S
Tapcon-230
MIMIC-SL D
MIMIC-SL D
signaling panel BCU Panel BCU Panel Transformer Transformer BCU Panel BCU Panel
400kV 132kV 400kV Line 132kV Line 33kV Line
for for for for for 33kV BPCU*14
400kV diameter*2 400kV diameter*2 Reactor *1 Control Panel *2 Control Panel *2 132kV Coupler *1 132kV Line *1
Energy Panel Energy Panel Energy Panel*2
Net work B
P543*1
PCS-978S*1 PCS-978S*1 PCS-931S*1 PCS-978S*1 PCS-978S*1 PCS-921S*1 PCS-915S*1 PCS-9611S*1 PCS-931S*1
PCS-902S*1 PCS-915S*1
PCS-9611S*1 PCS-9611S*1 PCS-9611S*1 PCS-9611S*1 PCS-9611S*1
PCS-994S*1
Transformer Transformer Transformer Line Line Reactor Reactor Breaker 400kV Busbar 132kV Busbar Bus-coupler 132kV Line
Protection*2 Protection*2 Protection*2 Protection*2 Protection*2 Protection*1 Protection*1 Protection*2 Protection*2 Protection*1 Protection*1 Protection*2
Substation Automation System Architecture of 400kV Nyakanazi Substation
GPS receiver
Legend:
Existing NR SCADA GCC
1. Optical Fiber Cable
2.Twisted-Pair Cable
3.RJ45 Ethernet
PCS-9700 Gateway
Panel
Sever Panel
PCS-9794*1
13.PCS-9785:GPS Syn Relay PCS-9785*1
SAS LAN
Support IEC61850 Ring Net work
Protection Panel
P543*1
PCS-978S*1 PCS-978S*1 PCS-931S*1 PCS-978S*1 PCS-978S*1 PCS-921S*1
PCS-902S*1 PCS-915S*1
PCS-9611S*1 PCS-9611S*1 PCS-9611S*1 PCS-9611S*1 PCS-9611S*1
PCS-994S*1
Transformer Transformer Transformer Line Line Reactor Reactor Breaker 400kV Busbar
Protection*2 Protection*2 Protection*2 Protection*2 Protection*2 Protection*1 Protection*1 Protection*2 Protection*2
Project : Construction of Substation for Kigoma-Nyakanazi Transmission Project
Customer : Tanzania Electric Supply Company Ltd (TANESCO) TECHNICAL BID
RFB No. : PA/001/2021-2022/HQ/W/04
Brochure
01