0% found this document useful (0 votes)
27 views1 page

Vertical Drop: Slab Cover

The document provides detailed measurements related to rock excavation, including various areas (Ac) and factors (Af) associated with different sections. It includes specific data points for slab covers and vertical drops at various locations. The measurements are crucial for planning and executing excavation work.

Uploaded by

RODEL YUNTING
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views1 page

Vertical Drop: Slab Cover

The document provides detailed measurements related to rock excavation, including various areas (Ac) and factors (Af) associated with different sections. It includes specific data points for slab covers and vertical drops at various locations. The measurements are crucial for planning and executing excavation work.

Uploaded by

RODEL YUNTING
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

167 167

Ac = 15.922 sq. m
178 166 Af = 3.11 sq. m 166
Ac = 11.69 sq. m ROCK EXCAVATION
Ac = 1.833 sq. m Af = 0.847 sq. m
177 Af = 1.545 sq. m
167 ROCK EXCAVATION 165 slab cover 165

Ac = 18.187 sq. m
176 164 Af = 0.756 sq. m
164
166
slab cover
ROCK EXCAVATION
175 163
165 163

174 164 162


162

173 163 161


161

172 160
160
5+280
159
171 159
5+400 5+520

170 167

169 Ac = 33.09 sq. m 166


Af = 0.756 sq. m 166
5+157 167 Ac = 19.922 sq. m
Af = 0.756 sq. m 165
VERTICAL DROP 165
ROCK EXCAVATION Ac = 17.538 sq. m
166
178 164 Af = 0.756 sq. m
slab cover
Ac = 2.078 sq. m 165
164 slab cover
177 Af = 1.790 sq. m ROCK EXCAVATION
ROCK EXCAVATION 163
164 slab cover 163
176 162
163 162
175 5+300 161
161
174 160
160
173 159
159
5+540
5+420
172 171
Ac = 39.89 sq. m
171 170 Af = 0.756 sq. m 167
ROCK EXCAVATION
170 169 slab cover 166

168 165
169
Ac = 17.789 sq. m
5+160 164 Af = 0.598 sq. m
167
slab cover
VERTICAL DROP ROCK EXCAVATION
166 163
169
Ac = 1.62 sq. m 165 162
Af = 0.972 sq. m
168
164 161
167 TOP 163
160
166 5+320
159
171 5+440
165
167
170
164
166
169
163
5+173
Ac = 13.78 sq. m
165
INLET ROAD CROSSING 168 Af = 0.536 sq. m

slab cover Ac = 19.807 sq. m


164 Af = 0.756 sq. m
167 ROCK EXCAVATION
slab cover
169 ROCK EXCAVATION
Ac = 1.62 sq. m 163
Af = 0.972 sq. m 166
168
165 162

167 TOP 164 161

166
163 160

165 5+340
159
167
5+460
164
166 167
163
5+180
165 166
OUTLET ROAD CROSSING
Ac = 22.89 sq. m
164 Af = 0.756 sq. m 165
slab cover Ac = 21.144 sq. m
ROCK EXCAVATION 164 Af = 0.756 sq. m
163
slab cover
ROCK EXCAVATION
162 163

169
161 162
Ac = 4.01 sq. m
168 Af = 3.23 sq. m
inlet siphon 160 161

167
159 160
5+360
166
159
167
165 5+480

5+185.50 167
166

163 166
Ac = 18.42 sq. m 165 Ac = 16.603 sq. m
Af = 0.69 sq. m Af = 4.91 sq. m
162 outlet siphon 164 slab cover 165

ROCK EXCAVATION Ac =18.594 sq. m


164 Af = 0.756 sq. m
161
163
slab cover
ROCK EXCAVATION
160 163
162

159 162
161
HARD ROCK EXCAVATION
158
161
160
5+267.12

159 160

5+380 159

5+500

You might also like