0% found this document useful (0 votes)
96 views4 pages

Quotations

The document outlines the costs associated with construction materials and labor for both the upstairs and ground floor of a building. The total expenses amount to Ksh 1,730,700, which includes costs for various materials such as cement, adhesive, and flooring. The breakdown includes specific quantities, prices, and totals for each category of work and materials.

Uploaded by

shibira
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
96 views4 pages

Quotations

The document outlines the costs associated with construction materials and labor for both the upstairs and ground floor of a building. The total expenses amount to Ksh 1,730,700, which includes costs for various materials such as cement, adhesive, and flooring. The breakdown includes specific quantities, prices, and totals for each category of work and materials.

Uploaded by

shibira
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

UP-STAIRS

No Boxes Price Total


1 Master Bedroom Floor 29 3000 87,000
2 Master Bedroom Shower Wall 18 2500 45,000
3 Master Bedroom Toilet Wall 13 2500 32,500
4 Master Bedroom Toilet Wall 3 2500 7,500
5 Master Bedroom Shower Floor 5 3000 15,000
6 Dressing Room Floor 8 3000 24,000
7 Master Bedroom Balcony Floor 14 3000 42,000
8 Bedroom 1 Floor 19 3000 57,000
9 Bedroom 1 Shower Wall 14 2500 35,000
10 Bedroom 1 Toilet Wall 11 2500 27,500
11 Bedroom 1 Toilet Floor 3 3000 9,000
12 Bedroom 1 Shower Floor 4 3000 12,000
13 Corridor Floor 8 3000 24,000
14 Study Room Floor 9 3000 27,000
15 Laundry Wall 5 2500 12,500
16 Laundry Floor 3 3000 9,000
17 Porch Area Floor 10 3000 30,000
18 Kitchen Porch Floor 7 3000 21,000
19 Laundry Porch Floor 7 3000 21,000
TOTAL 538,000/=
GROUND FLOOR
No Boxes Price Total
1 Varandar 11 3000 33,000
2 Sitting Room 39 3000 117,000
3 Dining Room 16 3000 48,000
4 Kitchen Floor 21 3000 63,000
5 Kitchen (Wall) 23 2500 57,500
6 Pantry Floor 4 3000 12,000
7 Stairs Area 25 3000 75,000
8 Common Toilet (Wall) 10 2500 25,000
9 Common Bathroom (Wall) 10 2500 25,000
10 Common Bathroom Floor 2 3000 6,000
11 Common Toilet Floor 2 3000 6,000
12 Guest Bedroom Floor 21 3000 63,000
13 Guest Bedroom Toilet (Wall) 12 2500 30,000
14 Guest Bedroom Shower (Wall) 15 2500 37,500
15 Guest Bedroom Shower Floor 21 3000 63,000
16 Guest Bedroom Floor Toilet 21 3000 63,000
17 Stairs (Timber) 7 6800 47,600
18 Landings (Timber) 10 sets (For stairs) 10 4000 47,000

TOTAL Ksh 811,600/=


GROUND FLOOR
No Boxes Price Total
1 Varandar 11 3000 33,000
2 Sitting Room 39 3000 117,000
3 Dining Room 16 3000 48,000
4 Kitchen Floor 21 3000 63,000
5 Kitchen (Wall) 23 2500 57,500
6 Pantry Floor 4 3000 12,000
7 Stairs Area 25 3000 75,000
8 Common Toilet (Wall) 10 2500 25,000
9 Common Bathroom (Wall) 10 2500 25,000
10 Common Bathroom Floor 2 3000 6,000
11 Common Toilet Floor 2 3000 6,000
12 Guest Bedroom Floor 21 3000 63,000
13 Guest Bedroom Toilet (Wall) 12 2500 30,000
14 Guest Bedroom Shower (Wall) 15 2500 37,500
15 Guest Bedroom Shower Floor 21 3000 63,000
16 Guest Bedroom Floor Toilet 21 3000 63,000
17 Stairs (Timber) 7 6800 47,600
18 Landings (Timber) 10 sets (For stairs) 10 4000 47,000

TOTAL Ksh 811,600/=


No Quantity Price Total
1 Cement 220 Bags 850 187,000
2 Adhesive 150 Bags 600 90,000
3 Corner Stripes 120 Bags 400 48,000
4 Spaces (20mm) 60 Pckts 80 4,800
5 Grounding 90 Kgs 250 22,500
6 Diamond Disc 5 Pcs 500 2,500
7 P4 Form 4 Pcs 1200 4,800
8 Screw 1 Inch 2 Boxes 750 1,500

TOTAL Ksh 361,100/=

UP STAIRS KSH 538,000/=

GROUND FLOOR KSH 811,600/=

OTHERS KSH 361,100/=

TRANSPORT KSH 20,000/=

TOTAL KSH 1,730,700/=

You might also like