0% found this document useful (0 votes)
11 views4 pages

Jsa Electric 2

Uploaded by

1914310010
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views4 pages

Jsa Electric 2

Uploaded by

1914310010
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

JSA Number:

JOB SAFETY ANALYSIS DATED ISSUED: 18 June 2024

JOB DESCRIPTION :

AREA/UNIT :

TAG NO. / EQUIPMENT DESCRIPTION :

REFERENCES :

PPE Required to do this Job :

Potensi Bahaya Pernyataan Kontrol


Langkah Kerja (Fisika, Kimia, Biologi, Potensi Kejadian (Diperlukan untuk mengurangi konsekuensi/dampak dan Peluang
dll.) kemungkinan terjadi)

Job Preparation
Preparation :
1. Tools
2. PJSM
3. PTW

Verify LOTO on local switch / UCP, ensure the unit


Complete LOTO Psychosocial: Gas release
confirm stop. And then push the button local switch
Motor Enclosure fan unit B Miss LOTO Pressure release
OFF position. ( Likehood )

Physical: Hand scratch, Finger Use proper hand glove ( C )


Prepare Tools
Hand Injury Injuries Prepare proper tools ( L )
Electrical Job

Perform Drawer LOTO on Racked Out


Position
VENT A 23VDE250A
Psychosocial : Wrong Ensure to LOTO on correct breaker (Train 2), refer
VENT B 23VDE250B Electric shock
breaker to drawing ( L )
VENT C 23VDE250B

- Check Drawers, clean up & check


Physical: Hand Injury Scratch (sharp object) Use medium hand glove & proper tools ( C )
tightness

- Check grounding arrangement, clean up


Physical: Hand Injury Scratch (sharp object) Use medium hand glove & proper tools ( C )
& check tightness

- Check all Junction Box motors accessories,


Physical: Hand Injury Scratch (sharp object) Use medium hand glove & proper tools ( C )
clean up & check tightness

- Perform Winding Insulation Test & Electrocution by


Physical: Electrocution Perform by competent personnel ( L )
Continuity Insulation tester

Connect motor connection with necessary Use medium hand glove & proper torque wrench
Physical: Hand Injury Slipped torque
torque (C)

Job Completion
Physical: Slippery area Ensure unit and around area has tidy and clean.
1. Tidy up area.
-STF Pinched injury Segregate waste to trash bin
2. Clean up unit and area.
-Pinched point
3. Test runs the equipment.