MCC # 5 (Packing)
MCC # 5 (Packing)
Status
S.No. Inspection
YES NO
Check Points
1 Is the Access control of MCC working properly? Yes
2 Is the lock present & working properly of panels? Yes
Is the Rubber floor mat is present in front of panel and
in good condition? Yes
3
4 Are all meters and bottons are named properly? No
5 Is the Selector Switch (Isolation) working properly?
6 Is the conveyor socket / switch / cable in good condition?
7 Is there any dust present in panel? Yes
8 Is the panel earthed properly? Yes
All contactors,EOCR,Thermal Overload and Circuit breaker tripping
9 have been tested. No
All contactors,EOCR,Thermal Overload and Relay contacts are
working properly including auxilary contacts. No
10
Al panels have details of the circuit(SLD),cable size,
fuse rating,overload setting clearly marked on indivisual cubicals No
11
Fire fighting equipment are installed,well equiped and
ready to use Yes
12
13 Protection guard installed and in well condition on all live terminals Yes
14 Cable entry exit holes and trench covered. No
15 Are all the connections cleaned & tightened properly? No
16 Are all indication light working properly? No
17 Is smoke detector installed and activated Yes
18 Is temperature inside the MCC 26 C and AC installed No
19 Is Lux level sufficient No
20 Is house keeping of the area ok No
21 Is emergency exit clear and door is opening No
22 Is there a emergency light installed and working
23 Are all SOP displayed ? No
Is updated authorized person list displayed and signed off by
24 Engineering Manager? Yes
REMARKS
- Proper tagging of equipments need to be installed and remove the tags of obselete equipments.
- Main incomer door exhaust fan disconnected
- False celling damaged
- Cable dressing required
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Packing Hall MCC 05
Next Due Date:________________
Remarks
No tagging available
No isolator available
Not applicable
Blowing required panels need to be cleaned.
0.05 check from door earth
Can be checked during shutdown.
On main incomer
Sealing required
Can be checked during shutdown.
F53 Spare
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Silica Bag not avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Silica bag avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? - -
2 Are all meters and bottons are named properly? - -
3 Is the Selector Switch (Isolation) working properly? - -
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? - -
REMARKS
__________________
AM Engg
Packing MCC 5 - Panel 01(A)
Next Due Date:________________
Remarks
Blowering Required.
Measuring point not available will be checked during shutdown.
2…Contactors
1…Thermal Load
3…Relays
2…MCB(4A)
1…Timer Relay
In running state.
Not applicable
_________________
Electrician
Remarks
F50 Spare
Not applicable
Blowering Required.
Measuring point not available will be checked during shutdown.
3…Contactors
1…Thermal Load
2...MCB (4A)
1…Timer relay
3… Relay
1…MCCB (63A)
In running state.
Not applicable
_________________
Electrician
Remarks
_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MCC 5 - C
Inspection Date:_14-05-2025_
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? YES
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. NO
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. NO
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals YES
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Cleaning should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
acking MCC 5 - Cable compartment # 1
Next Due Date:________________
Remarks
Not applicable
Not applicable
Blowering Required.
Not applicable
Not applicable
_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Silica Bag avaliable.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? - -
2 Are all meters and bottons are named properly? - -
3 Is the Selector Switch (Isolation) working properly? - -
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? - -
REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Packing MCC 5 - Panel 02(A)
Next Due Date:________________
Remarks
Blowering Required.
Measuring point not available will be checked during shutdown.
3…VFD (Siemens)(2.2kw, 2.2kw, 2.2kw)
3...MCB(4A)
3…MPCB
3…Relay
3…Contactors
In running state.
Not applicable
_________________
Electrician
Remarks
Remarks
Blowering Required.
Measuring point not available will be checked during shutdown.
1…VFD(Siemens)(30kw)
1…MCCB 63A
1…Contactor
1…MCB(6A0
1…MCB(4A)
1…Relay
In running state.
Not applicable
_________________
Electrician
Remarks
_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Silica bag avaliable.
- Cable tray cover not installed.
- Fan not running.
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Silica bag Avaliable.
- Fan not working.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? - -
2 Are all meters and bottons are named properly? - -
3 Is the Selector Switch (Isolation) working properly? - -
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? - -
REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Packing MCC 5 - Panel 03(A)
Next Due Date:________________
Remarks
In running state.
Not applicable
_________________
Electrician
Remarks
Blowering Required.
Measuring point not available will be checked during shutdown.
1…VFD(Siemens)(75kw)
1…MCCB(160A)
1…MCB(6A)
1…MCB(4A)
1…Relay
In running state.
Not applicable
_________________
Electrician
Remarks
Empty (Nothing installed)
_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MCC 5 - C
Inspection Date:_14-05-2025_
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? YES
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. NO
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. NO
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals YES
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Cables are not isolated properly naked wires are visible (Ractified)
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
acking MCC 5 - Cable compartment # 2
Next Due Date:________________
Remarks
Not applicable
Not applicable
Blowering Required.
Not applicable
Not applicable
_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
REMARKS
- Silica bag avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? - -
2 Are all meters and bottons are named properly? - -
3 Is the Selector Switch (Isolation) working properly? - -
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? - -
REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Packing MCC 5 - Panel 04(A)
Next Due Date:________________
Remarks
In running state.
Not applicable
_________________
Electrician
Remarks
63P3B HP Slurry Transfer Pump # 2
Not applicable
Cable dressing required.
Blowering Required.
Measuring point not available will be checked during shutdown.
1…VFD(Siemens)(90kw)
1…MCCB(250A)
1…Contactor(225A)
1…MCB(6A)
1…MCB(4A)
1…Relay
In running state.
Not applicable
_________________
Electrician
Remarks
_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MCC 5 - P
Inspection Date:_14-05-2025_
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? NO
6 Is the panel earthed properly? NO
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals YES
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? NO
13 Are all indication light working properly? YES
REMARKS
- Silica bag avaliable.
- Fan not working.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? - -
2 Are all meters and bottons are named properly? - -
3 Is the Selector Switch (Isolation) working properly? - -
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? - -
REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
cking MCC 5 - Panel 05(Main Incoming)
Next Due Date:________________
Remarks
Main Incoming
Not applicable
Blowering Required
Measuring point not available will be checked during shutdown.
1…ACB(800A)
2…MCB(2A)(Double Pole)
1…MCB(4A)
1…MCB(20A)
1…MCB(6A)
1…Power Supply
6…Fuses
1…Internet device
1…Power Monitoring device
In running state.
_________________
Electrician
Remarks
_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MCC 5 - C
Inspection Date:_14-05-2025_
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? YES
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. NO
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. NO
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals YES
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
__________________
AM Engg
acking MCC 5 - Cable compartment # 3
Next Due Date:________________
Remarks
Not applicable
Not applicable
Blowering Required.
Not applicable
Not applicable
_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? YES
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. YES
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? YES
REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? YES
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
YES
7 been tested.
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? YES
REMARKS
- Silica bag not avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? YES
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
YES
7 been tested.
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? YES
REMARKS
- Silica bag not avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Fan not working(Rust present on it)
- Silica bag avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? - -
2 Are all meters and bottons are named properly? - -
3 Is the Selector Switch (Isolation) working properly? - -
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? - -
REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Packing MCC 5 - Panel 06(A)
Next Due Date:________________
Remarks
F53(Spare)
1…MCB(4A)
Off
_________________
Electrician
Remarks
In running state.
_________________
Electrician
Remarks
In running state.
Remarks
Blowering Required.
Measuring point not available will be checked during shutdown.
1…VFD(Siemens)(15KW)
1…Contactor
1…MPCB
1…Relay
1…MCB(4A)
1…MCB(6A)
In running state.
Not applicable
_________________
Electrician
Remarks
_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? Yes
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? Yes
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? Yes
REMARKS
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? YES
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
YES
7 been tested.
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? YES
REMARKS
- Silica bag not avaliable.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? YES
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. YES
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Silica bag avaliable
- Fan not working
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? - -
2 Are all meters and bottons are named properly? - -
3 Is the Selector Switch (Isolation) working properly? - -
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? - -
REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Packing MCC 5 - Panel 07(A)
Next Due Date:________________
Remarks
_________________
Electrician
Remarks
Off
_________________
Electrician
Remarks
F54(Spare)
1…MCB(16A)
Off
_________________
Electrician
Remarks
Blowering Required.
Measuring point not available will be checked during shutdown.
1…VFD(Siemens)(15kw)
1…MPCB
1…Contactor
1…MCB(6A)
1…MCB(4A)
1…Relay
In running state.
Not Applicable
_________________
Electrician
Remarks
_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MCC 5 - C
Inspection Date:_14-05-2025_
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? YES
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. NO
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. NO
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Cables are not isolated properly naked wires are visible (Ractified)
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
acking MCC 5 - Cable compartment # 4
Next Due Date:________________
Remarks
Not applicable
Not applicable
Blowering Required.
Not applicable
Not applicable
_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? YES
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
YES
7 been tested.
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? YES
REMARKS
- Silica bag not avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? YES
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
REMARKS
- Silica bag not avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? YES
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
REMARKS
- Silica bag not avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? NO
13 Are all indication light working properly? NO
REMARKS
- Silica bag avaliable.
- Fan not working
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? - -
2 Are all meters and bottons are named properly? - -
3 Is the Selector Switch (Isolation) working properly? - -
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? - -
REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Packing MCC 5 - Panel 08(A)
Next Due Date:________________
Remarks
Blowering Required.
Measuring point not available will be checked during shutdown.
1…MCCB(16A)
1…MCB(4A)
Off
_________________
Electrician
Remarks
Off
Not applicable
_________________
Electrician
Remarks
Not applicable
_________________
Electrician
Remarks
Blowering Required.
Measuring point not available will be checked during shutdown.
1…VFD(Siemens)(18kw)
1…MCCB(40A)
1…MCB(6A)
1…MCB(4A)
1…Contactor
1…Relay
In running state.
Remarks
_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
REMARKS
- Silica bag avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
REMARKS
- Silica bag avaliable.
- Joints on control wires.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
been tested. YES
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
fuse rating,overload setting clearly marked on indivisual cubicals NO
9
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Silica bag avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? - -
2 Are all meters and bottons are named properly? - -
3 Is the Selector Switch (Isolation) working properly? - -
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? - -
REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Packing MCC 5 - Panel 09(A)
Next Due Date:________________
Remarks
Blowering Required.
Measuring point not available will be checked during shutdown.
2…MCB(4A)
1…MPCB
3…Relay
1…Contactor
Not applicable
_________________
Electrician
Remarks
Lubricating Oil Pump
Not applicable
Cable dressing required
Blowering Required.
Measuring point not available will be checked during shutdown.
2…MCB(4A)
1…MPCB
3…Relay
1…Contactor
Not applicable
_________________
Electrician
Remarks
Not applicable
_________________
Electrician
Remarks
Not applicable
Not applicable
_________________
Electrician
Remarks
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? YES
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. NO
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. NO
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
acking MCC 5 - Cable compartment # 5
Next Due Date:________________
Remarks
Not applicable
Not applicable
Blowering Required.
Not applicable
Not applicable
_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
REMARKS
- Silica bag not avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
been tested. YES
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Silica bag avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Fan not working(Damaged)
- Silica bag avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? - -
2 Are all meters and bottons are named properly? - -
3 Is the Selector Switch (Isolation) working properly? - -
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? - -
REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Packing MCC 5 - Panel 10(A)
Next Due Date:________________
Remarks
Not applicable
_________________
Electrician
Remarks
65V16A Slide Gate Below Mass Flow Hopper # 2
Not applicable
Cable dressing required
Blowering Required.
Measuring point not available will be checked during shutdown.
2…MCB(4A)
1…MPCB
3…Relay
1…Contactor
Not applicable
_________________
Electrician
Remarks
Not applicable
_________________
Electrician
Remarks
1…VFD(Siemens)(22Kw)
1…HMI
1…MCCB(50A)
1…MCB(6A)
1…MCB(4A)
1…Contactor
1…Relay
No SLD available with panels.
Not applicable
Not applicable
_________________
Electrician
Remarks
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? YES
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. NO
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. NO
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
acking MCC 5 - Cable compartment # 6
Next Due Date:________________
Remarks
Not applicable
Not applicable
Blowering Required.
Not applicable
Not applicable
_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
REMARKS
- Silica bag not avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
REMARKS
- Silica bag avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
been tested. YES
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Silica bag avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Silica bag avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? - -
2 Are all meters and bottons are named properly? - -
3 Is the Selector Switch (Isolation) working properly? - -
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? - -
REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Packing MCC 5 - Panel 11(A)
Next Due Date:________________
Remarks
Not applicable
_________________
Electrician
Remarks
62P5A Labsa Transfer Pump # 1
Not applicable
Cable dressing required
Blowering Required.
Measuring point not available will be checked during shutdown.
1…MCCB(63A)
2…MCB(4A)
3…Relay
1…Contactor
Not applicable
_________________
Electrician
Remarks
Not applicable
_________________
Electrician
Remarks
1…VFD(Siemens)(22KW)
1…MCCB(50A)
1…MCB(6A)
1…MCB(4A)
1…Contactor
1…Relay
Not applicable
_________________
Electrician
Remarks
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
REMARKS
- Silica bag not avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Silica bag avaliable
- Cable tray cover removed
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
been tested. YES
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Silica bag avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? - -
2 Are all meters and bottons are named properly? - -
3 Is the Selector Switch (Isolation) working properly? - -
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? - -
REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Packing MCC 5 - Panel 12(A)
Next Due Date:________________
Remarks
F42 Supper
Not applicable
Cable dressing required
Blowering Required.
Measuring point not available will be checked during shutdown.
1…MCB(4A)
3…Relay
1…Contactor
1…MCCB(Removed)
Not applicable
_________________
Electrician
Remarks
62P11 Seal Water Pump (Tagging on masking tape)
Not applicable
Cable dressing required
Blowering Required.
Measuring point not available will be checked during shutdown.
1…VFD(Siemens)(4Kw)
1…HMI
2…MCB(4A)
1…MPCB
1…Contactor
1…Relay
Not applicable
_________________
Electrician
Remarks
1…VFD(Siemens)(4Kw)
1…HMI
2…MCB(4A)
1…MPCB
1…Contactor
1…Relay
Not applicable
_________________
Electrician
Remarks
Not applicable
_________________
Electrician
Remarks
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? YES
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. NO
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. NO
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Cable tray cover not avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
acking MCC 5 - Cable compartment # 7
Next Due Date:________________
Remarks
Not applicable
Not applicable
Blowering Required.
Not applicable
Not applicable
_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
REMARKS
- Silica bag not avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. YES
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Silica bag not avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. YES
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Silica bag avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? - -
2 Are all meters and bottons are named properly? - -
3 Is the Selector Switch (Isolation) working properly? - -
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? - -
REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Packing MCC 5 - Panel 13(A)
Next Due Date:________________
Remarks
Not applicable
_________________
Electrician
Remarks
Packing Conveyor (Written with marker)
Not applicable
Blowering Required.
Measuring point not available will be checked during shutdown.
2…MCCB(30A)
Not applicable
_________________
Electrician
Remarks
Blowering Required.
Measuring point not available will be checked during shutdown.
2…MCCB(30A)
Not applicable
_________________
Electrician
Remarks
2…VFD(Siemens)(15Kw..Salt Silo)(22Kw)
2…HMI(1..HMI Removed)
1…MCCB(50A)
1...MCB(40A)(3-Pole)
1…MCB(6A)
2…MCB(4A)
1…Contactor
1…Relay
Not applicable
_________________
Electrician
Remarks
_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? - -
2 Are all meters and bottons are named properly? - -
3 Is the Selector Switch (Isolation) working properly? - -
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? - -
REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. YES
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Silica bag not avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. YES
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Silica bag avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals YES
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Silica bag not avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? - -
2 Are all meters and bottons are named properly? - -
3 Is the Selector Switch (Isolation) working properly? - -
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? - -
REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Packing MCC 5 - Panel 14(A)
Next Due Date:________________
Remarks
_________________
Electrician
Remarks
1…MCCB(200A)
Not applicable
_________________
Electrician
Remarks
Blowering Required.
Measuring point not available will be checked during shutdown.
1…MCCB(200A)
_________________
Electrician
Remarks
Not applicable
_________________
Electrician
Remarks
_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MCC 5 - C
Inspection Date:_14-05-2025_
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? YES
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. NO
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. NO
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
acking MCC 5 - Cable compartment # 8
Next Due Date:________________
Remarks
Not applicable
Not applicable
Blowering Required.
Not applicable
Not applicable
_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. YES
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Silica bag not avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. YES
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Silica bag not avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. YES
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Silica bag not avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Silica bag not avaliable
- Cable tray cover removed
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? - -
2 Are all meters and bottons are named properly? - -
3 Is the Selector Switch (Isolation) working properly? - -
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? - -
REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Packing MCC 5 - Panel 15(A)
Next Due Date:________________
Remarks
No tagging available.
Not applicable
Blowering Required.
Measuring point not available will be checked during shutdown.
1…MCCB(100A)
Not applicable
_________________
Electrician
Remarks
No tagging available.
Not applicable
Blowering Required.
Measuring point not available will be checked during shutdown.
1…MCCB(100A)
Not applicable
_________________
Electrician
Remarks
No tagging available.
Not applicable
Blowering Required.
Measuring point not available will be checked during shutdown.
1…MCCB(250A)
_________________
Electrician
Remarks
Not applicable
_________________
Electrician
Remarks
_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
REMARKS
- Silica bag avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? - -
2 Are all meters and bottons are named properly? - -
3 Is the Selector Switch (Isolation) working properly? - -
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? - -
REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Packing MCC 5 - Panel 16(A)
Next Due Date:________________
Remarks
Blowering Required.
Measuring point not available will be checked during shutdown.
2…MCB(4A)
1…Timer Relay
3…Relay
4…Contactor
1…MCCB(Removed)
Not applicable
_________________
Electrician
Remarks
65DE-K1 Blower for DE System # 1
Not applicable
Blowering Required.
Measuring point not available will be checked during shutdown.
1…VFD(Siemens)(30KW)
2…MCB(4A)
3…Relay(1..Missing)
1…Timer Relay
Not applicable
_________________
Electrician
Remarks
_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MCC 5 - C
Inspection Date:_14-05-2025_
Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. YES
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? NO
13 Are all indication light working properly? YES
REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
acking MCC 5 - Cable compartment # 9
Next Due Date:________________
Remarks
No tagging available.
Selector switch for current measurement is faulty.
Cable dressing required.
Blowering done.
Measuring point not available will be checked during shutdown.
In running state.
_________________
Electrician