MCC # 5 (Packing)

The MCC Inspection CheckSheet documents inspections conducted on various panels, highlighting the status of multiple safety and operational checks. Numerous issues were identified, including improperly named meters, non-functional selector switches, and insufficient panel tagging, with several points marked as needing attention. The report emphasizes the necessity for proper equipment tagging, cleaning, and maintenance to ensure safety and compliance.

Uploaded by

zainali27102005
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views146 pages

MCC # 5 (Packing)

The MCC Inspection CheckSheet documents inspections conducted on various panels, highlighting the status of multiple safety and operational checks. Numerous issues were identified, including improperly named meters, non-functional selector switches, and insufficient panel tagging, with several points marked as needing attention. The report emphasizes the necessity for proper equipment tagging, cleaning, and maintenance to ensure safety and compliance.

Uploaded by

zainali27102005
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 146

MCC Inspection CheckSheet

ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing H


Inspection Date: 14/05/2025

Status
S.No. Inspection
YES NO
Check Points
1 Is the Access control of MCC working properly? Yes
2 Is the lock present & working properly of panels? Yes
Is the Rubber floor mat is present in front of panel and
in good condition? Yes
3
4 Are all meters and bottons are named properly? No
5 Is the Selector Switch (Isolation) working properly?
6 Is the conveyor socket / switch / cable in good condition?
7 Is there any dust present in panel? Yes
8 Is the panel earthed properly? Yes
All contactors,EOCR,Thermal Overload and Circuit breaker tripping
9 have been tested. No
All contactors,EOCR,Thermal Overload and Relay contacts are
working properly including auxilary contacts. No
10
Al panels have details of the circuit(SLD),cable size,
fuse rating,overload setting clearly marked on indivisual cubicals No
11
Fire fighting equipment are installed,well equiped and
ready to use Yes
12
13 Protection guard installed and in well condition on all live terminals Yes
14 Cable entry exit holes and trench covered. No
15 Are all the connections cleaned & tightened properly? No
16 Are all indication light working properly? No
17 Is smoke detector installed and activated Yes
18 Is temperature inside the MCC 26 C and AC installed No
19 Is Lux level sufficient No
20 Is house keeping of the area ok No
21 Is emergency exit clear and door is opening No
22 Is there a emergency light installed and working
23 Are all SOP displayed ? No
Is updated authorized person list displayed and signed off by
24 Engineering Manager? Yes

REMARKS
- Proper tagging of equipments need to be installed and remove the tags of obselete equipments.
- Main incomer door exhaust fan disconnected
- False celling damaged
- Cable dressing required
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg
Packing Hall MCC 05
Next Due Date:________________

Remarks

Door alignment out

One piece missing.

No tagging available
No isolator available
Not applicable
Blowing required panels need to be cleaned.
0.05 check from door earth
Can be checked during shutdown.

Can be checked during shutdown.

On main incomer
Sealing required
Can be checked during shutdown.
F53 Spare

AC installed but temperature not maintained as AC settings are out.


Lights need to be added

Emergency exit not available.

ags of obselete equipments.


_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO

All contactors,EOCR,Thermal Overload and Circuit breaker tripping have


been tested. YES

7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Silica Bag not avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO

All contactors,EOCR,Thermal Overload and Circuit breaker tripping have


been tested. YES

7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Silica bag avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? - -
2 Are all meters and bottons are named properly? - -
3 Is the Selector Switch (Isolation) working properly? - -
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? - -

REMARKS

PPE and RPE Required:


Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg
Packing MCC 5 - Panel 01(A)
Next Due Date:________________

Remarks

65DE -K2 Blower FOR DE SYSTEM # 2


Not applicable

Blowering Required.
Measuring point not available will be checked during shutdown.
2…Contactors
1…Thermal Load
3…Relays
2…MCB(4A)
1…Timer Relay
In running state.

No SLD available with panels.


Protection sheet not installed.

Not applicable

_________________
Electrician

Packing MCC 5 - Panel 01(B)


Next Due Date:________________

Remarks
F50 Spare
Not applicable

Blowering Required.
Measuring point not available will be checked during shutdown.

3…Contactors
1…Thermal Load
2...MCB (4A)
1…Timer relay
3… Relay
1…MCCB (63A)
In running state.

No SLD available with panels.


Protection sheet not installed.

Not applicable

_________________
Electrician

Packing MCC 5 - Panel 01(C)


Next Due Date:________________

Remarks

Empty (Nothing installed)


Empty (Nothing installed)

_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MCC 5 - C
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? YES
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. NO
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. NO
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals YES
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Cleaning should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg
acking MCC 5 - Cable compartment # 1
Next Due Date:________________

Remarks

Not applicable
Not applicable

Blowering Required.

Only connectors has installed.

Not applicable

Protection sheet installed.


2… Glands not avaliable

Not applicable

_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES

Are all meters and bottons are named properly? NO


2
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO

All contactors,EOCR,Thermal Overload and Circuit breaker tripping have


been tested. YES

7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Silica Bag avaliable.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO

All contactors,EOCR,Thermal Overload and Circuit breaker tripping have


been tested. YES

7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? - -
2 Are all meters and bottons are named properly? - -
3 Is the Selector Switch (Isolation) working properly? - -
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? - -

REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg
Packing MCC 5 - Panel 02(A)
Next Due Date:________________

Remarks

62CL1 Screw Conveyor Soda Silo


62CL5 Screw Conveyor SCMC DayBin
65N3A Belt Conveyor # 1
Not applicable

Blowering Required.
Measuring point not available will be checked during shutdown.
3…VFD (Siemens)(2.2kw, 2.2kw, 2.2kw)
3...MCB(4A)
3…MPCB
3…Relay
3…Contactors

In running state.

No SLD available with panels.


Protection sheet not installed.

Not applicable

_________________
Electrician

Packing MCC 5 - Panel 02(B)


Next Due Date:________________

Remarks
Remarks

63A1 Slurry Mixer


Not applicable

Blowering Required.
Measuring point not available will be checked during shutdown.

1…VFD(Siemens)(30kw)
1…MCCB 63A
1…Contactor
1…MCB(6A0
1…MCB(4A)
1…Relay

In running state.

No SLD available with panels.


Protection sheet not installed.

Not applicable

_________________
Electrician

Packing MCC 5 - Panel 02(C)


Next Due Date:________________

Remarks

Empty (Nothing installed)


Empty (Nothing installed)

_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES

Are all meters and bottons are named properly? NO


2
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO

All contactors,EOCR,Thermal Overload and Circuit breaker tripping have


been tested. YES

7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Silica bag avaliable.
- Cable tray cover not installed.
- Fan not running.

PPE and RPE Required:


Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO

All contactors,EOCR,Thermal Overload and Circuit breaker tripping have


been tested. YES

7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Silica bag Avaliable.
- Fan not working.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? - -
2 Are all meters and bottons are named properly? - -
3 Is the Selector Switch (Isolation) working properly? - -
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? - -

REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg
Packing MCC 5 - Panel 03(A)
Next Due Date:________________

Remarks

65N3B Belt Conveyor # 2


62CL2 Screw Conveyor -Sulphate Silo(Shift to F41)
63F2 Slurry Rotary Filter
Not applicable
Cable dressing required.
Blowering Required.
Measuring point not available will be checked during shutdown.
3…VFD(Siemens)(2.2kw, 3kw(Removed)(HMI Screen Damage), 5.5kw)
3…MPCB
3…Contactors
3…MCB(4A)
3…Relays

In running state.

No SLD available with panels.


Protection sheet not installed.

Not applicable

_________________
Electrician

Packing MCC 5 - Panel 03(B)


Next Due Date:________________

Remarks

64K2 Air Lift Fan


Not applicable

Blowering Required.
Measuring point not available will be checked during shutdown.
1…VFD(Siemens)(75kw)
1…MCCB(160A)
1…MCB(6A)
1…MCB(4A)
1…Relay
In running state.

No SLD available with panels.


Protection sheet not installed.

Not applicable

_________________
Electrician

Packing MCC 5 - Panel 03(C)


Next Due Date:________________

Remarks
Empty (Nothing installed)

_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MCC 5 - C
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? YES
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. NO
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. NO
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals YES
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Cables are not isolated properly naked wires are visible (Ractified)
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg
acking MCC 5 - Cable compartment # 2
Next Due Date:________________

Remarks

Not applicable
Not applicable

Blowering Required.

Only connectors has installed.

Not applicable

Protection sheet installed.


1… Glands not avaliable

Not applicable

_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES

Are all meters and bottons are named properly? NO


2
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO

All contactors,EOCR,Thermal Overload and Circuit breaker tripping have


been tested. YES
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Silica bag avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO

All contactors,EOCR,Thermal Overload and Circuit breaker tripping have


been tested. YES

7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? - -
2 Are all meters and bottons are named properly? - -
3 Is the Selector Switch (Isolation) working properly? - -
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? - -

REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg
Packing MCC 5 - Panel 04(A)
Next Due Date:________________

Remarks

62P12 Undergroung Pump 0ft(Tagging on masking tape)


65N4B Ritz Mills(Tagging on masking tape)
62CL3 Salt Silo 70ft(Tagging on masking tape)
Not applicable
Cable dressing required.
Blowering Required.
Measuring point not available will be checked during shutdown.
3…VFD(Siemens)(5.5kw(HMI Missing), 5.5kw, 7.5kw)
3…MPCB
3…MCB(4A)
3…Relays

In running state.

No SLD available with panels.


Protection sheet not installed.

Not applicable

_________________
Electrician

Packing MCC 5 - Panel 04(B)


Next Due Date:________________

Remarks
63P3B HP Slurry Transfer Pump # 2
Not applicable
Cable dressing required.
Blowering Required.
Measuring point not available will be checked during shutdown.

1…VFD(Siemens)(90kw)
1…MCCB(250A)
1…Contactor(225A)
1…MCB(6A)
1…MCB(4A)
1…Relay

In running state.

No SLD available with panels.


Protection sheet not installed.

Not applicable

_________________
Electrician

Packing MCC 5 - Panel 04(C)


Next Due Date:________________

Remarks

Empty (Nothing installed)


Empty (Nothing installed)

_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MCC 5 - P
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? NO
6 Is the panel earthed properly? NO

All contactors,EOCR,Thermal Overload and Circuit breaker tripping have


been tested. YES

7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals YES
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? NO
13 Are all indication light working properly? YES

REMARKS
- Silica bag avaliable.
- Fan not working.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? - -
2 Are all meters and bottons are named properly? - -
3 Is the Selector Switch (Isolation) working properly? - -
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? - -

REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg
cking MCC 5 - Panel 05(Main Incoming)
Next Due Date:________________

Remarks

Main Incoming
Not applicable

Blowering Required
Measuring point not available will be checked during shutdown.

1…ACB(800A)
2…MCB(2A)(Double Pole)
1…MCB(4A)
1…MCB(20A)
1…MCB(6A)
1…Power Supply
6…Fuses
1…Internet device
1…Power Monitoring device

In running state.

No SLD available with panels.

Main incomer panel and is in service.

_________________
Electrician

Packing MCC 5 - Pannel 5(B)


Next Due Date:________________

Remarks

Empty (Nothing installed)

_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MCC 5 - C
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? YES
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. NO
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. NO
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals YES
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS

PPE and RPE Required:


Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg
acking MCC 5 - Cable compartment # 3
Next Due Date:________________

Remarks

Not applicable
Not applicable

Blowering Required.

Only connectors has installed.

Not applicable

Protection sheet installed.


1… Glands not avaliable

Not applicable

_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? YES
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. YES
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? YES

REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? YES
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
YES
7 been tested.
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? YES

REMARKS
- Silica bag not avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? YES
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
YES
7 been tested.
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? YES

REMARKS
- Silica bag not avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO

All contactors,EOCR,Thermal Overload and Circuit breaker tripping have


been tested. YES

7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Fan not working(Rust present on it)
- Silica bag avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? - -
2 Are all meters and bottons are named properly? - -
3 Is the Selector Switch (Isolation) working properly? - -
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? - -

REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg
Packing MCC 5 - Panel 06(A)
Next Due Date:________________

Remarks

F53(Spare)

Cable dressing required.


Blowering Required.
Measuring point not available will be checked during shutdown.

1…MCB(4A)

Off

No SLD available with panels.


Protection sheet not installed.

_________________
Electrician

Packing MCC 5 - Panel 06(B)


Next Due Date:________________

Remarks

NSD-II (Lightning DB)


Cable dressing required.
Blowering Required.
Measuring point not available will be checked during shutdown.
1…MCCB(63A)
1…MCB(4A)

In running state.

No SLD available with panels.


Protection sheet not installed.

_________________
Electrician

Packing MCC 5 - Panel 06(C)


Next Due Date:________________

Remarks

AC UPS Bypass Feeder (FCL-UPS-02B)

Cable dressing required.


Blowering Required.
Measuring point not available will be checked during shutdown.
1…MCCB(63A)
1…MCB(4A)

In running state.

No SLD available with panels.


Protection sheet not installed.
_________________
Electrician

Packing MCC 5 - Panel 06(D)


Next Due Date:________________

Remarks

62CL6 Screw Conveyor-Soda SCMC Weigher 50ft


Not applicable

Blowering Required.
Measuring point not available will be checked during shutdown.

1…VFD(Siemens)(15KW)
1…Contactor
1…MPCB
1…Relay
1…MCB(4A)
1…MCB(6A)

In running state.

No SLD available with panels.


Protection sheet not installed.

Not applicable
_________________
Electrician

Packing MCC 5 - Panel 06(E)


Next Due Date:________________

Remarks

Empty (Nothing installed)

_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? Yes
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? Yes
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? Yes

REMARKS

PPE and RPE Required:


Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? YES
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
YES
7 been tested.
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? YES

REMARKS
- Silica bag not avaliable.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? YES
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. YES
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS

PPE and RPE Required:


Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO

All contactors,EOCR,Thermal Overload and Circuit breaker tripping have


been tested. YES

7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Silica bag avaliable
- Fan not working
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? - -
2 Are all meters and bottons are named properly? - -
3 Is the Selector Switch (Isolation) working properly? - -
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? - -

REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg
Packing MCC 5 - Panel 07(A)
Next Due Date:________________

Remarks

AC UPS Main Feeder

Can’t Open (In running state)

_________________
Electrician

Packing MCC 5 - Panel 07(B)


Next Due Date:________________

Remarks

64SR1 Screen Siever


Cable dressing required.
Blowering Required.
Measuring point not available will be checked during shutdown.
1…MCCB(32A)
1…MCB(4A)

Off

No SLD available with panels.


Protection sheet not installed.

_________________
Electrician

Packing MCC 5 - Panel 07(C)


Next Due Date:________________

Remarks

F54(Spare)

Selector switch not installed


Blowering Required.
Measuring point not available will be checked during shutdown.

1…MCB(16A)

Off

No SLD available with panels.


Protection sheet not installed.
Indications not installed

_________________
Electrician

Packing MCC 5 - Panel 07(D)


Next Due Date:________________

Remarks

63A3 Rework Mixer 40ft


Not Applicable

Blowering Required.
Measuring point not available will be checked during shutdown.

1…VFD(Siemens)(15kw)
1…MPCB
1…Contactor
1…MCB(6A)
1…MCB(4A)
1…Relay

In running state.

No SLD available with panels.


Protection sheet not installed.

Not Applicable
_________________
Electrician

Packing MCC 5 - Panel 07(E)


Next Due Date:________________

Remarks

Empty (Nothing installed)

_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MCC 5 - C
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? YES
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. NO
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. NO
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Cables are not isolated properly naked wires are visible (Ractified)
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg
acking MCC 5 - Cable compartment # 4
Next Due Date:________________

Remarks

Not applicable
Not applicable

Blowering Required.

Only connectors has installed.

Not applicable

Protection sheet not installed.

Not applicable

_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? YES
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
YES
7 been tested.
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? YES

REMARKS
- Silica bag not avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? YES
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO

All contactors,EOCR,Thermal Overload and Circuit breaker tripping have


been tested. YES
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Silica bag not avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? YES
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO

All contactors,EOCR,Thermal Overload and Circuit breaker tripping have


been tested. YES
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Silica bag not avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO

All contactors,EOCR,Thermal Overload and Circuit breaker tripping have


been tested. YES

7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? NO
13 Are all indication light working properly? NO
REMARKS
- Silica bag avaliable.
- Fan not working
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? - -
2 Are all meters and bottons are named properly? - -
3 Is the Selector Switch (Isolation) working properly? - -
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? - -

REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg
Packing MCC 5 - Panel 08(A)
Next Due Date:________________

Remarks

65EH2 Unloadind System Zeolite NSD-II

Blowering Required.
Measuring point not available will be checked during shutdown.
1…MCCB(16A)
1…MCB(4A)

Off

No SLD available with panels.


Protection sheet not installed.

_________________
Electrician

Packing MCC 5 - Panel 08(B)


Next Due Date:________________

Remarks

62K3 Sack Tip Station Fan 70ft


Cable dressing required
Blowering Required.
Measuring point not available will be checked during shutdown.
1…MCB(4A)
1…MPCB
3…Relay
1…Contactor

Off

No SLD available with panels.


Protection sheet not installed.

Not applicable

_________________
Electrician

Packing MCC 5 - Panel 08(C)


Next Due Date:________________

Remarks

62V8 SV13 Day Tank

Cable dressing required


Blowering Required.
Measuring point not available will be checked during shutdown.
1…MCB(4A)
1…MPCB
3…Relay
1…Contactor
Off

No SLD available with panels.


Protection sheet not installed.

Not applicable

_________________
Electrician

Packing MCC 5 - Panel 08(D)


Next Due Date:________________

Remarks

63P4A Rework Slurry Transfer Pump


Not applicable

Blowering Required.
Measuring point not available will be checked during shutdown.

1…VFD(Siemens)(18kw)
1…MCCB(40A)
1…MCB(6A)
1…MCB(4A)
1…Contactor
1…Relay

In running state.

No SLD available with panels.


Protection sheet not installed.

Main incomer panel and is in service.


Not applicable
_________________
Electrician

Packing MCC 5 - Panel 08(E)


Next Due Date:________________

Remarks

Empty (Nothing installed)

_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO

All contactors,EOCR,Thermal Overload and Circuit breaker tripping have


been tested. YES
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Silica bag avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO

All contactors,EOCR,Thermal Overload and Circuit breaker tripping have


been tested. YES
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Silica bag avaliable.
- Joints on control wires.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
been tested. YES
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO

All contactors,EOCR,Thermal Overload and Circuit breaker tripping have


been tested. YES

7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
fuse rating,overload setting clearly marked on indivisual cubicals NO
9
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Silica bag avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? - -
2 Are all meters and bottons are named properly? - -
3 Is the Selector Switch (Isolation) working properly? - -
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? - -

REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg
Packing MCC 5 - Panel 09(A)
Next Due Date:________________

Remarks

Slurry Mixer Vent Wet Cyclone Fan


Not applicable

Blowering Required.
Measuring point not available will be checked during shutdown.
2…MCB(4A)
1…MPCB
3…Relay
1…Contactor

No SLD available with panels.


Not applicable

Not applicable

_________________
Electrician

Packing MCC 5 - Panel 09(B)


Next Due Date:________________

Remarks
Lubricating Oil Pump
Not applicable
Cable dressing required
Blowering Required.
Measuring point not available will be checked during shutdown.
2…MCB(4A)
1…MPCB
3…Relay
1…Contactor

No SLD available with panels.


Not applicable

Not applicable

_________________
Electrician

Packing MCC 5 - Panel 09(C)


Next Due Date:________________

Remarks

Base Powder Belt Conveyor


Not applicable
Cable dressing required
Blowering Required.
Measuring point not available will be checked during shutdown.
2…MCB(4A)
1…MPCB
3…Relay
1…Contactor

No SLD available with panels.


Not applicable

Not applicable

_________________
Electrician

Packing MCC 5 - Panel 09(D)


Next Due Date:________________

Remarks

63P1 Slurry Transfer Pump


Not applicable
Cable dressing required
Blowering Required.
Measuring point not available will be checked during shutdown.
1…VFD(Siemens)(22Kw)
1…HMI
1…MCCB (50A)
1…MCB (6A)
1…MCB(4A)
1…Contactor
1…Relay
No SLD available with panels.

Not applicable

Not applicable

_________________
Electrician

Packing MCC 5 - Panel 09(E)


Next Due Date:________________

Remarks

Empty (Nothing installed)


_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MCC 5 - C
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? YES
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. NO
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. NO
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg
acking MCC 5 - Cable compartment # 5
Next Due Date:________________

Remarks

Not applicable
Not applicable

Blowering Required.

Only connectors has installed.

Not applicable

Protection sheet not installed.


2…Glands not avaliable

Not applicable

_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO

All contactors,EOCR,Thermal Overload and Circuit breaker tripping have


been tested. YES
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Silica bag not avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO

All contactors,EOCR,Thermal Overload and Circuit breaker tripping have


been tested. YES
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
been tested. YES
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Silica bag avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO

All contactors,EOCR,Thermal Overload and Circuit breaker tripping have


been tested. YES

7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Fan not working(Damaged)
- Silica bag avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? - -
2 Are all meters and bottons are named properly? - -
3 Is the Selector Switch (Isolation) working properly? - -
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? - -

REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg
Packing MCC 5 - Panel 10(A)
Next Due Date:________________

Remarks

65V16A Slide Gate Below Mass Flow Hopper # 1


Not applicable
Cable dressing required
Blowering Required.
Measuring point not available will be checked during shutdown.
2…MCB(4A)
1…MPCB
3…Relay
1…Contactor

No SLD available with panels.


Not applicable

Not applicable

_________________
Electrician

Packing MCC 5 - Panel 10(B)


Next Due Date:________________

Remarks
65V16A Slide Gate Below Mass Flow Hopper # 2
Not applicable
Cable dressing required
Blowering Required.
Measuring point not available will be checked during shutdown.
2…MCB(4A)
1…MPCB
3…Relay
1…Contactor

No SLD available with panels.


Not applicable

Not applicable

_________________
Electrician

Packing MCC 5 - Panel 10(C)


Next Due Date:________________

Remarks

62P3A Caustic Transfer Pump # 1


Not applicable
Cable dressing required
Blowering Required.
Measuring point not available will be checked during shutdown.
1…MCCB(63A)
2…MCB(4A)
1…Contactor
3…Relay

No SLD available with panels.


Not applicable

Not applicable

_________________
Electrician

Packing MCC 5 - Panel 10(D)


Next Due Date:________________

Remarks

63P2 LP-Slurry Transfer Pump # 1


Not applicable
Cable dressing required
Blowering Required.
Measuring point not available will be checked during shutdown.

1…VFD(Siemens)(22Kw)
1…HMI
1…MCCB(50A)
1…MCB(6A)
1…MCB(4A)
1…Contactor
1…Relay
No SLD available with panels.
Not applicable

Not applicable

_________________
Electrician

Packing MCC 5 - Panel 10(E)


Next Due Date:________________

Remarks

Empty (Nothing installed)


_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MCC 5 - C
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? YES
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. NO
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. NO
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg
acking MCC 5 - Cable compartment # 6
Next Due Date:________________

Remarks

Not applicable
Not applicable

Blowering Required.

Only connectors has installed.

Not applicable

Protection sheet not installed.

Not applicable

_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO

All contactors,EOCR,Thermal Overload and Circuit breaker tripping have


been tested. YES
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Silica bag not avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO

All contactors,EOCR,Thermal Overload and Circuit breaker tripping have


been tested. YES
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Silica bag avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
been tested. YES
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Silica bag avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO

All contactors,EOCR,Thermal Overload and Circuit breaker tripping have


been tested. YES

7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Silica bag avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? - -
2 Are all meters and bottons are named properly? - -
3 Is the Selector Switch (Isolation) working properly? - -
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? - -

REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg
Packing MCC 5 - Panel 11(A)
Next Due Date:________________

Remarks

62P3B Caustic Transfer Pump # 2


Not applicable
Cable dressing required
Blowering Required.
Measuring point not available will be checked during shutdown.
1…MCCB(63A)
2…MCB(4A)
3…Relay
1…Contactor

No SLD available with panels.


Not applicable

Not applicable

_________________
Electrician

Packing MCC 5 - Panel 11(B)


Next Due Date:________________

Remarks
62P5A Labsa Transfer Pump # 1
Not applicable
Cable dressing required
Blowering Required.
Measuring point not available will be checked during shutdown.
1…MCCB(63A)
2…MCB(4A)
3…Relay
1…Contactor

No SLD available with panels.


Not applicable

Not applicable

_________________
Electrician

Packing MCC 5 - Panel 11(C)


Next Due Date:________________

Remarks

62P5B Labsa Transfer Pump # 2


Not applicable
Cable dressing required
Blowering Required.
Measuring point not available will be checked during shutdown.
1…MCCB(63A)
2…MCB(4A)
3…Relay
1…Contactor

No SLD available with panels.


Not applicable

Not applicable

_________________
Electrician

Packing MCC 5 - Panel 11(D)


Next Due Date:________________

Remarks

63GR3 Deaerator Slurry Mill


Not applicable
Cable dressing required
Blowering Required.
Measuring point not available will be checked during shutdown.

1…VFD(Siemens)(22KW)
1…MCCB(50A)
1…MCB(6A)
1…MCB(4A)
1…Contactor
1…Relay

No SLD available with panels.


Not applicable

Not applicable

_________________
Electrician

Packing MCC 5 - Panel 11(E)


Next Due Date:________________

Remarks

Empty (Nothing installed)


_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO

All contactors,EOCR,Thermal Overload and Circuit breaker tripping have


been tested. YES
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Silica bag not avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO

All contactors,EOCR,Thermal Overload and Circuit breaker tripping have


been tested. YES

7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Silica bag avaliable
- Cable tray cover removed
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO

All contactors,EOCR,Thermal Overload and Circuit breaker tripping have


been tested. YES

7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
been tested. YES

7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Silica bag avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? - -
2 Are all meters and bottons are named properly? - -
3 Is the Selector Switch (Isolation) working properly? - -
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? - -

REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg
Packing MCC 5 - Panel 12(A)
Next Due Date:________________

Remarks

F42 Supper
Not applicable
Cable dressing required
Blowering Required.
Measuring point not available will be checked during shutdown.
1…MCB(4A)
3…Relay
1…Contactor
1…MCCB(Removed)

No SLD available with panels.


Not applicable

Not applicable

_________________
Electrician

Packing MCC 5 - Panel 12(B)


Next Due Date:________________

Remarks
62P11 Seal Water Pump (Tagging on masking tape)
Not applicable
Cable dressing required
Blowering Required.
Measuring point not available will be checked during shutdown.

1…VFD(Siemens)(4Kw)
1…HMI
2…MCB(4A)
1…MPCB
1…Contactor
1…Relay

No SLD available with panels.


Not applicable

Not applicable

_________________
Electrician

Packing MCC 5 - Panel 12(C)


Next Due Date:________________

Remarks

62CL2 Screw Conveyor Sulphate Silo 70ft (Tagging on masking tape)


Not applicable
Cable dressing required
Blowering Required.
Measuring point not available will be checked during shutdown.

1…VFD(Siemens)(4Kw)
1…HMI
2…MCB(4A)
1…MPCB
1…Contactor
1…Relay

No SLD available with panels.


Not applicable

Not applicable

_________________
Electrician

Packing MCC 5 - Panel 12(D)


Next Due Date:________________

Remarks

65MX1 Boone Mixer # 1


Not applicable
Cable dressing required
Blowering Required.
Measuring point not available will be checked during shutdown.
1…VFD(Siemens)(22Kw)
1…HMI
1…MCCB(50A)
1…MCB(6A)
1…MCB(4A)
1…MCB(40A)(3-Pole)
1…Contactor
1…Relay

No SLD available with panels.


Not applicable

Not applicable

_________________
Electrician

Packing MCC 5 - Panel 12E)


Next Due Date:________________

Remarks

Empty (Nothing installed)


_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MCC 5 - C
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? YES
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. NO
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. NO
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Cable tray cover not avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg
acking MCC 5 - Cable compartment # 7
Next Due Date:________________

Remarks

Not applicable
Not applicable

Blowering Required.

Only connectors has installed.

Not applicable

Protection sheet not installed.

Not applicable

_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO

All contactors,EOCR,Thermal Overload and Circuit breaker tripping have


been tested. YES
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Silica bag not avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. YES
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Silica bag not avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. YES
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Silica bag avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO

All contactors,EOCR,Thermal Overload and Circuit breaker tripping have


been tested. YES

7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO
REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? - -
2 Are all meters and bottons are named properly? - -
3 Is the Selector Switch (Isolation) working properly? - -
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? - -

REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg
Packing MCC 5 - Panel 13(A)
Next Due Date:________________

Remarks

62CL7 Salt Silo 50ft (Tagging on masking tape)


Not applicable
Cable dressing required
Blowering Required.
Measuring point not available will be checked during shutdown.
1…Isolator(Selector switch)
2…MCB(4A)
1…Contactor
1…Relay

No SLD available with panels.


Not applicable

Not applicable

_________________
Electrician

Packing MCC 5 - Panel 13(B)


Next Due Date:________________

Remarks
Packing Conveyor (Written with marker)
Not applicable

Blowering Required.
Measuring point not available will be checked during shutdown.

2…MCCB(30A)

No SLD available with panels.


Not applicable

Not applicable

_________________
Electrician

Packing MCC 5 - Panel 13(C)


Next Due Date:________________

Remarks

Packing Conveyor (Written with marker)


Not applicable

Blowering Required.
Measuring point not available will be checked during shutdown.

2…MCCB(30A)

No SLD available with panels.


Not applicable

Not applicable

_________________
Electrician

Packing MCC 5 - Panel 13(D)


Next Due Date:________________

Remarks

65MX2 Boone Mixer # 2


Not applicable
Cable dressing required
Blowering Required.
Measuring point not available will be checked during shutdown.

2…VFD(Siemens)(15Kw..Salt Silo)(22Kw)
2…HMI(1..HMI Removed)
1…MCCB(50A)
1...MCB(40A)(3-Pole)
1…MCB(6A)
2…MCB(4A)
1…Contactor
1…Relay

No SLD available with panels.


Not applicable

Not applicable
_________________
Electrician

Packing MCC 5 - Panel 13E)


Next Due Date:________________

Remarks

Empty (Nothing installed)

_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? - -
2 Are all meters and bottons are named properly? - -
3 Is the Selector Switch (Isolation) working properly? - -
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? - -

REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. YES
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Silica bag not avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. YES
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Silica bag avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO

All contactors,EOCR,Thermal Overload and Circuit breaker tripping have


been tested. YES

7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals YES
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Silica bag not avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? - -
2 Are all meters and bottons are named properly? - -
3 Is the Selector Switch (Isolation) working properly? - -
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? - -

REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg
Packing MCC 5 - Panel 14(A)
Next Due Date:________________

Remarks

Empty (Nothing installed)

_________________
Electrician

Packing MCC 5 - Panel 14(B)


Next Due Date:________________

Remarks

Mespack Line # 2(Written with marker)


Not applicable
Blowering Required.
Measuring point not available will be checked during shutdown.

1…MCCB(200A)

No SLD available with panels.


Not applicable

Not applicable

_________________
Electrician

Packing MCC 5 - Panel 14(C)


Next Due Date:________________

Remarks

DC # 2(Written with marker)


Not applicable

Blowering Required.
Measuring point not available will be checked during shutdown.

1…MCCB(200A)

No SLD available with panels.


Not applicable
Not applicable

_________________
Electrician

Packing MCC 5 - Panel 14(D)


Next Due Date:________________

Remarks

65N5A Roller Conveyor # 1 Packing Hall


Not applicable
Cable dressing required
Blowering Required.
Measuring point not available will be checked during shutdown.
2…MCB(4A)(1 has connection removed)
2…MCB(2A)
3…Relay
1…Timer relay
1…Volt meter

No SLD available with panels.

Not applicable
_________________
Electrician

Packing MCC 5 - Panel 14E)


Next Due Date:________________

Remarks

Empty (Nothing installed)

_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MCC 5 - C
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? YES
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. NO
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. NO
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg
acking MCC 5 - Cable compartment # 8
Next Due Date:________________

Remarks

Not applicable
Not applicable

Blowering Required.

Only connectors has installed.

Not applicable

Protection sheet not installed.


2 Gland not avaliable

Not applicable

_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. YES
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Silica bag not avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. YES
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Silica bag not avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. YES
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Silica bag not avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO

All contactors,EOCR,Thermal Overload and Circuit breaker tripping have


been tested. YES

7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Silica bag not avaliable
- Cable tray cover removed
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? - -
2 Are all meters and bottons are named properly? - -
3 Is the Selector Switch (Isolation) working properly? - -
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? - -

REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg
Packing MCC 5 - Panel 15(A)
Next Due Date:________________

Remarks

No tagging available.
Not applicable

Blowering Required.
Measuring point not available will be checked during shutdown.

1…MCCB(100A)

No SLD available with panels.


Not applicable

Not applicable

_________________
Electrician

Packing MCC 5 - Panel 15(B)


Next Due Date:________________

Remarks

No tagging available.
Not applicable
Blowering Required.
Measuring point not available will be checked during shutdown.

1…MCCB(100A)

No SLD available with panels.


Not applicable

Not applicable

_________________
Electrician

Packing MCC 5 - Panel 15(C)


Next Due Date:________________

Remarks

No tagging available.
Not applicable

Blowering Required.
Measuring point not available will be checked during shutdown.

1…MCCB(250A)

No SLD available with panels.


Not applicable
Not applicable

_________________
Electrician

Packing MCC 5 - Panel 15(D)


Next Due Date:________________

Remarks

65N5B Roller Conveyor # 2(Packing Hall)


Not applicable
Cable dressing required
Blowering Required.
Measuring point not available will be checked during shutdown.
2…MCB(4A)
1…Timer Relay
3…Relay
4…Contactor
1…MCCB(Removed)

No SLD available with panels.


Not applicable

Not applicable
_________________
Electrician

Packing MCC 5 - Panel 15E)


Next Due Date:________________

Remarks

Empty (Nothing installed)

_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO

All contactors,EOCR,Thermal Overload and Circuit breaker tripping have


been tested. YES

7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? YES
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO

All contactors,EOCR,Thermal Overload and Circuit breaker tripping have


been tested. YES
7
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? YES
13 Are all indication light working properly? NO

REMARKS
- Silica bag avaliable
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg

MCC Inspection CheckSheet


ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MC
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? - -
2 Are all meters and bottons are named properly? - -
3 Is the Selector Switch (Isolation) working properly? - -
4 Is the cable dressing in good condition? - -
5 Is there any dust present in panel? - -
6 Is the panel earthed properly? - -
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. - -
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. - -
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals - -
10 Protection guard installed and in well condition on all live terminals - -
11 Cable entry exit holes and trench covered. - -
12 Are all the connections cleaned & tightened properly? - -
13 Are all indication light working properly? - -

REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg
Packing MCC 5 - Panel 16(A)
Next Due Date:________________

Remarks

65N6 Overhead Conveyor # 2 (Packing Hall)


Not applicable

Blowering Required.
Measuring point not available will be checked during shutdown.
2…MCB(4A)
1…Timer Relay
3…Relay
4…Contactor
1…MCCB(Removed)

No SLD available with panels.


Not applicable

Not applicable

_________________
Electrician

Packing MCC 5 - Panel 16(B)


Next Due Date:________________

Remarks
65DE-K1 Blower for DE System # 1
Not applicable

Blowering Required.
Measuring point not available will be checked during shutdown.
1…VFD(Siemens)(30KW)
2…MCB(4A)
3…Relay(1..Missing)
1…Timer Relay

No SLD available with panels.


Not applicable

Not applicable

_________________
Electrician

Packing MCC 5 - Panel 16(C)


Next Due Date:________________

Remarks

Empty (Nothing installed)


Empty (Nothing installed)

_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023) Packing MCC 5 - C
Inspection Date:_14-05-2025_

Status
S.No. Inspection
YES NO
Check Points
1 Is the door lock present & working properly of panels? YES
2 Are all meters and bottons are named properly? NO
3 Is the Selector Switch (Isolation) working properly? NO
4 Is the cable dressing in good condition? NO
5 Is there any dust present in panel? YES
6 Is the panel earthed properly? NO
All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
7 been tested. YES
All contactors,EOCR,Thermal Overload and Relay contacts are working
8 properly including auxilary contacts. YES
Al panels have details of the circuit(SLD),cable size,
9 fuse rating,overload setting clearly marked on indivisual cubicals NO
10 Protection guard installed and in well condition on all live terminals NO
11 Cable entry exit holes and trench covered. YES
12 Are all the connections cleaned & tightened properly? NO
13 Are all indication light working properly? YES

REMARKS
- Panel tagging should be done.
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes

__________________
AM Engg
acking MCC 5 - Cable compartment # 9
Next Due Date:________________

Remarks

No tagging available.
Selector switch for current measurement is faulty.
Cable dressing required.
Blowering done.
Measuring point not available will be checked during shutdown.

ACB 1600A installed and physically in good condition.

In running state.

No SLD available with panels.


Protection sheet not installed.
Cable not entered properly
Main incomer panel and is in service.

_________________