MCC # 5 (Packing)
MCC # 5 (Packing)
                                                                                        Status
   S.No.                                   Inspection
                                                                                      YES     NO
Check Points
    1     Is the Access control of MCC working properly?                              Yes
    2     Is the lock present & working properly of panels?                           Yes
             Is the Rubber floor mat is present in front of panel and
             in good condition?                                                       Yes
      3
      4      Are all meters and bottons are named properly?                                  No
      5      Is the Selector Switch (Isolation) working properly?
      6      Is the conveyor socket / switch / cable in good condition?
      7      Is there any dust present in panel?                                      Yes
      8      Is the panel earthed properly?                                           Yes
             All contactors,EOCR,Thermal Overload and Circuit breaker tripping
      9      have been tested.                                                               No
             All contactors,EOCR,Thermal Overload and Relay contacts are
             working properly including auxilary contacts.                                   No
     10
             Al panels have details of the circuit(SLD),cable size,
             fuse rating,overload setting clearly marked on indivisual cubicals              No
     11
             Fire fighting equipment are installed,well equiped and
             ready to use                                                             Yes
     12
     13      Protection guard installed and in well condition on all live terminals   Yes
     14      Cable entry exit holes and trench covered.                                      No
     15      Are all the connections cleaned & tightened properly?                           No
     16      Are all indication light working properly?                                      No
     17      Is smoke detector installed and activated                                Yes
     18      Is temperature inside the MCC 26 C and AC installed                             No
     19      Is Lux level sufficient                                                         No
     20      Is house keeping of the area ok                                                 No
     21      Is emergency exit clear and door is opening                                     No
     22      Is there a emergency light installed and working
     23      Are all SOP displayed ?                                                         No
             Is updated authorized person list displayed and signed off by
     24      Engineering Manager?                                                     Yes
REMARKS
       - Proper tagging of equipments need to be installed and remove the tags of obselete equipments.
       - Main incomer door exhaust fan disconnected
       - False celling damaged
       - Cable dressing required
PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
       AM Engg
              Packing Hall MCC 05
           Next Due Date:________________
Remarks
           No tagging available
           No isolator available
           Not applicable
           Blowing required panels need to be cleaned.
           0.05 check from door earth
           Can be checked during shutdown.
           On main incomer
           Sealing required
           Can be checked during shutdown.
           F53 Spare
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                    YES
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                                      NO
    7
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Silica Bag not avaliable
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
    1      Is the door lock present & working properly of panels?                   YES
    2      Are all meters and bottons are named properly?                                   NO
    3      Is the Selector Switch (Isolation) working properly?                             NO
    4      Is the cable dressing in good condition?                                 YES
    5      Is there any dust present in panel?                                      YES
    6      Is the panel earthed properly?                                                   NO
    7
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Silica bag avaliable
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                     Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                       -       -
   2    Are all meters and bottons are named properly?                               -       -
   3    Is the Selector Switch (Isolation) working properly?                         -       -
   4    Is the cable dressing in good condition?                                     -       -
   5    Is there any dust present in panel?                                          -       -
   6    Is the panel earthed properly?                                               -       -
      All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
  7   been tested.                                                             -   -
      All contactors,EOCR,Thermal Overload and Relay contacts are working
  8   properly including auxilary contacts.                                    -   -
      Al panels have details of the circuit(SLD),cable size,
 9    fuse rating,overload setting clearly marked on indivisual cubicals       -   -
 10   Protection guard installed and in well condition on all live terminals   -   -
 11   Cable entry exit holes and trench covered.                               -   -
 12   Are all the connections cleaned & tightened properly?                    -   -
 13   Are all indication light working properly?                               -   -
REMARKS
      __________________
             AM Engg
Packing MCC 5 - Panel 01(A)
Next Due Date:________________
Remarks
Blowering Required.
Measuring point not available will be checked during shutdown.
2…Contactors
1…Thermal Load
3…Relays
2…MCB(4A)
1…Timer Relay
In running state.
Not applicable
_________________
            Electrician
                                     Remarks
F50 Spare
Not applicable
Blowering Required.
Measuring point not available will be checked during shutdown.
3…Contactors
1…Thermal Load
2...MCB (4A)
1…Timer relay
3… Relay
1…MCCB (63A)
In running state.
Not applicable
_________________
            Electrician
Remarks
_________________
            Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023)                                                Packing MCC 5 - C
Inspection Date:_14-05-2025_
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                    YES
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                              YES
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
    7      been tested.                                                                     NO
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                            NO
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals   YES
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Cleaning should be done.
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
acking MCC 5 - Cable compartment # 1
    Next Due Date:________________
Remarks
    Not applicable
    Not applicable
Blowering Required.
Not applicable
Not applicable
    _________________
                Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023)                                                            Packing MC
Inspection Date:_14-05-2025_
                                                                                       Status
  S.No.                                     Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
    7
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Silica Bag avaliable.
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                     Inspection
  S.No.                                    Inspection
                                                                                    YES     NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                    YES
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                                      NO
    7
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Panel tagging should be done.
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                       -       -
   2    Are all meters and bottons are named properly?                               -       -
   3    Is the Selector Switch (Isolation) working properly?                         -       -
   4    Is the cable dressing in good condition?                                     -       -
   5    Is there any dust present in panel?                                          -       -
   6    Is the panel earthed properly?                                           -   -
        All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
   7    been tested.                                                             -   -
        All contactors,EOCR,Thermal Overload and Relay contacts are working
   8    properly including auxilary contacts.                                    -   -
        Al panels have details of the circuit(SLD),cable size,
   9    fuse rating,overload setting clearly marked on indivisual cubicals       -   -
   10   Protection guard installed and in well condition on all live terminals   -   -
   11   Cable entry exit holes and trench covered.                               -   -
   12   Are all the connections cleaned & tightened properly?                    -   -
   13   Are all indication light working properly?                               -   -
REMARKS
     - Panel tagging should be done.
        PPE and RPE Required:
        Electrical Gloves
        Dust Mask
        Safety Shoes
        __________________
               AM Engg
Packing MCC 5 - Panel 02(A)
Next Due Date:________________
Remarks
Blowering Required.
Measuring point not available will be checked during shutdown.
3…VFD (Siemens)(2.2kw, 2.2kw, 2.2kw)
3...MCB(4A)
3…MPCB
3…Relay
3…Contactors
In running state.
Not applicable
_________________
            Electrician
                                     Remarks
                                     Remarks
Blowering Required.
Measuring point not available will be checked during shutdown.
1…VFD(Siemens)(30kw)
1…MCCB 63A
1…Contactor
1…MCB(6A0
1…MCB(4A)
1…Relay
In running state.
Not applicable
_________________
            Electrician
Remarks
_________________
            Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023)                                                            Packing MC
Inspection Date:_14-05-2025_
                                                                                       Status
  S.No.                                     Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
    7
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Silica bag avaliable.
     - Cable tray cover not installed.
     - Fan not running.
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                    YES
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                                      NO
    7
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Silica bag Avaliable.
     - Fan not working.
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                       -       -
   2    Are all meters and bottons are named properly?                           -   -
   3    Is the Selector Switch (Isolation) working properly?                     -   -
   4    Is the cable dressing in good condition?                                 -   -
   5    Is there any dust present in panel?                                      -   -
   6    Is the panel earthed properly?                                           -   -
        All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
   7    been tested.                                                             -   -
        All contactors,EOCR,Thermal Overload and Relay contacts are working
   8    properly including auxilary contacts.                                    -   -
        Al panels have details of the circuit(SLD),cable size,
   9    fuse rating,overload setting clearly marked on indivisual cubicals       -   -
   10   Protection guard installed and in well condition on all live terminals   -   -
   11   Cable entry exit holes and trench covered.                               -   -
   12   Are all the connections cleaned & tightened properly?                    -   -
   13   Are all indication light working properly?                               -   -
REMARKS
     - Panel tagging should be done.
        PPE and RPE Required:
        Electrical Gloves
        Dust Mask
        Safety Shoes
        __________________
               AM Engg
Packing MCC 5 - Panel 03(A)
Next Due Date:________________
Remarks
In running state.
Not applicable
_________________
            Electrician
Remarks
Blowering Required.
Measuring point not available will be checked during shutdown.
1…VFD(Siemens)(75kw)
1…MCCB(160A)
1…MCB(6A)
1…MCB(4A)
1…Relay
In running state.
Not applicable
_________________
            Electrician
                                     Remarks
                  Empty (Nothing installed)
_________________
            Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023)                                                Packing MCC 5 - C
Inspection Date:_14-05-2025_
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                    YES
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                              YES
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
    7      been tested.                                                                     NO
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                            NO
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals   YES
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Cables are not isolated properly naked wires are visible (Ractified)
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
acking MCC 5 - Cable compartment # 2
    Next Due Date:________________
Remarks
    Not applicable
    Not applicable
Blowering Required.
Not applicable
Not applicable
    _________________
                Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023)                                                            Packing MC
Inspection Date:_14-05-2025_
                                                                                       Status
  S.No.                                     Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
REMARKS
     - Silica bag avaliable
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                     Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                            NO
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                                      NO
    7
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Panel tagging should be done.
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                       -       -
   2    Are all meters and bottons are named properly?                               -       -
   3    Is the Selector Switch (Isolation) working properly?                         -       -
   4    Is the cable dressing in good condition?                                     -       -
   5    Is there any dust present in panel?                                          -       -
   6    Is the panel earthed properly?                                               -       -
        All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
   7    been tested.                                                             -   -
        All contactors,EOCR,Thermal Overload and Relay contacts are working
   8    properly including auxilary contacts.                                    -   -
        Al panels have details of the circuit(SLD),cable size,
   9    fuse rating,overload setting clearly marked on indivisual cubicals       -   -
   10   Protection guard installed and in well condition on all live terminals   -   -
   11   Cable entry exit holes and trench covered.                               -   -
   12   Are all the connections cleaned & tightened properly?                    -   -
   13   Are all indication light working properly?                               -   -
REMARKS
     - Panel tagging should be done.
        PPE and RPE Required:
        Electrical Gloves
        Dust Mask
        Safety Shoes
        __________________
               AM Engg
Packing MCC 5 - Panel 04(A)
Next Due Date:________________
Remarks
In running state.
Not applicable
_________________
            Electrician
                                     Remarks
63P3B HP Slurry Transfer Pump # 2
Not applicable
Cable dressing required.
Blowering Required.
Measuring point not available will be checked during shutdown.
1…VFD(Siemens)(90kw)
1…MCCB(250A)
1…Contactor(225A)
1…MCB(6A)
1…MCB(4A)
1…Relay
In running state.
Not applicable
_________________
            Electrician
Remarks
_________________
            Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023)                                               Packing MCC 5 - P
Inspection Date:_14-05-2025_
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                    YES
   5    Is there any dust present in panel?                                                 NO
   6    Is the panel earthed properly?                                                      NO
    7
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals   YES
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                            NO
    13     Are all indication light working properly?                               YES
REMARKS
     - Silica bag avaliable.
     - Fan not working.
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                       -       -
   2    Are all meters and bottons are named properly?                               -       -
   3    Is the Selector Switch (Isolation) working properly?                         -       -
   4    Is the cable dressing in good condition?                                     -       -
   5    Is there any dust present in panel?                                          -       -
   6    Is the panel earthed properly?                                               -       -
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
    7      been tested.                                                              -       -
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                     -       -
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals        -       -
    10     Protection guard installed and in well condition on all live terminals    -       -
    11     Cable entry exit holes and trench covered.                                -       -
    12     Are all the connections cleaned & tightened properly?                     -       -
    13     Are all indication light working properly?                                -       -
REMARKS
     - Panel tagging should be done.
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
cking MCC 5 - Panel 05(Main Incoming)
    Next Due Date:________________
Remarks
    Main Incoming
    Not applicable
    Blowering Required
    Measuring point not available will be checked during shutdown.
    1…ACB(800A)
    2…MCB(2A)(Double Pole)
    1…MCB(4A)
    1…MCB(20A)
    1…MCB(6A)
    1…Power Supply
    6…Fuses
    1…Internet device
    1…Power Monitoring device
In running state.
    _________________
                Electrician
Remarks
_________________
            Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023)                                                Packing MCC 5 - C
Inspection Date:_14-05-2025_
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                    YES
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                              YES
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
    7      been tested.                                                                     NO
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                            NO
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals   YES
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
           __________________
                  AM Engg
acking MCC 5 - Cable compartment # 3
    Next Due Date:________________
Remarks
    Not applicable
    Not applicable
Blowering Required.
Not applicable
Not applicable
    _________________
                Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023)                                                            Packing MC
Inspection Date:_14-05-2025_
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                        YES
   4    Is the cable dressing in good condition?                                            NO
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                                      NO
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
    7      been tested.                                                             YES
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                               YES
REMARKS
     - Panel tagging should be done.
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                        YES
    4      Is the cable dressing in good condition?                                         NO
    5      Is there any dust present in panel?                                      YES
    6      Is the panel earthed properly?                                                   NO
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
                                                                                    YES
    7      been tested.
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                               YES
REMARKS
     - Silica bag not avaliable
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                     Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                        YES
   4    Is the cable dressing in good condition?                                            NO
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                                      NO
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
                                                                                    YES
    7      been tested.
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                               YES
REMARKS
     - Silica bag not avaliable
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                    YES
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                                      NO
    7
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Fan not working(Rust present on it)
     - Silica bag avaliable
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                       -       -
   2    Are all meters and bottons are named properly?                               -       -
   3    Is the Selector Switch (Isolation) working properly?                         -       -
   4    Is the cable dressing in good condition?                                     -       -
   5    Is there any dust present in panel?                                          -       -
   6    Is the panel earthed properly?                                               -       -
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
    7      been tested.                                                              -       -
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                     -       -
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals        -       -
    10     Protection guard installed and in well condition on all live terminals    -       -
    11     Cable entry exit holes and trench covered.                                -       -
    12     Are all the connections cleaned & tightened properly?                     -       -
    13     Are all indication light working properly?                                -       -
REMARKS
     - Panel tagging should be done.
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
Packing MCC 5 - Panel 06(A)
Next Due Date:________________
Remarks
F53(Spare)
1…MCB(4A)
Off
_________________
            Electrician
Remarks
In running state.
_________________
            Electrician
Remarks
In running state.
Remarks
Blowering Required.
Measuring point not available will be checked during shutdown.
1…VFD(Siemens)(15KW)
1…Contactor
1…MPCB
1…Relay
1…MCB(4A)
1…MCB(6A)
In running state.
Not applicable
_________________
            Electrician
Remarks
_________________
            Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023)                                                            Packing MC
Inspection Date:_14-05-2025_
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      Yes
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                        Yes
   4    Is the cable dressing in good condition?                                     -       -
   5    Is there any dust present in panel?                                          -       -
   6    Is the panel earthed properly?                                               -       -
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
    7      been tested.                                                              -       -
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                     -       -
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals        -       -
    10     Protection guard installed and in well condition on all live terminals    -       -
    11     Cable entry exit holes and trench covered.                                -       -
    12     Are all the connections cleaned & tightened properly?                     -       -
    13     Are all indication light working properly?                               Yes
REMARKS
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                        YES
    4      Is the cable dressing in good condition?                                         NO
    5      Is there any dust present in panel?                                      YES
    6      Is the panel earthed properly?                                                   NO
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
                                                                                    YES
    7      been tested.
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                               YES
REMARKS
     - Silica bag not avaliable.
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                     Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                        YES
   4    Is the cable dressing in good condition?                                            NO
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                                      NO
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
    7      been tested.                                                             YES
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                    YES
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                                      NO
    7
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Silica bag avaliable
     - Fan not working
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                       -       -
   2    Are all meters and bottons are named properly?                               -       -
   3    Is the Selector Switch (Isolation) working properly?                         -       -
   4    Is the cable dressing in good condition?                                     -       -
   5    Is there any dust present in panel?                                          -       -
   6    Is the panel earthed properly?                                               -       -
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
    7      been tested.                                                              -       -
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                     -       -
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals        -       -
    10     Protection guard installed and in well condition on all live terminals    -       -
    11     Cable entry exit holes and trench covered.                                -       -
    12     Are all the connections cleaned & tightened properly?                     -       -
    13     Are all indication light working properly?                                -       -
REMARKS
     - Panel tagging should be done.
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
Packing MCC 5 - Panel 07(A)
Next Due Date:________________
Remarks
_________________
            Electrician
Remarks
Off
_________________
            Electrician
Remarks
F54(Spare)
1…MCB(16A)
Off
_________________
            Electrician
Remarks
Blowering Required.
Measuring point not available will be checked during shutdown.
1…VFD(Siemens)(15kw)
1…MPCB
1…Contactor
1…MCB(6A)
1…MCB(4A)
1…Relay
In running state.
Not Applicable
_________________
            Electrician
Remarks
_________________
            Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023)                                                Packing MCC 5 - C
Inspection Date:_14-05-2025_
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                    YES
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                              YES
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
    7      been tested.                                                                     NO
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                            NO
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Cables are not isolated properly naked wires are visible (Ractified)
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
acking MCC 5 - Cable compartment # 4
    Next Due Date:________________
Remarks
    Not applicable
    Not applicable
Blowering Required.
Not applicable
Not applicable
    _________________
                Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023)                                                            Packing MC
Inspection Date:_14-05-2025_
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                        YES
   4    Is the cable dressing in good condition?                                    YES
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                                      NO
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
                                                                                    YES
    7      been tested.
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                               YES
REMARKS
     - Silica bag not avaliable
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
    3      Is the Selector Switch (Isolation) working properly?                     YES
    4      Is the cable dressing in good condition?                                         NO
    5      Is there any dust present in panel?                                      YES
    6      Is the panel earthed properly?                                                   NO
REMARKS
     - Silica bag not avaliable
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                     Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                        YES
   4    Is the cable dressing in good condition?                                            NO
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                                      NO
REMARKS
     - Silica bag not avaliable
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                    YES
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                                      NO
    7
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                            NO
    13     Are all indication light working properly?                                       NO
REMARKS
     - Silica bag avaliable.
     - Fan not working
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                       -       -
   2    Are all meters and bottons are named properly?                               -       -
   3    Is the Selector Switch (Isolation) working properly?                         -       -
   4    Is the cable dressing in good condition?                                     -       -
   5    Is there any dust present in panel?                                          -       -
   6    Is the panel earthed properly?                                               -       -
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
    7      been tested.                                                              -       -
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                     -       -
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals        -       -
    10     Protection guard installed and in well condition on all live terminals    -       -
    11     Cable entry exit holes and trench covered.                                -       -
    12     Are all the connections cleaned & tightened properly?                     -       -
    13     Are all indication light working properly?                                -       -
REMARKS
     - Panel tagging should be done.
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
AM Engg
Packing MCC 5 - Panel 08(A)
Next Due Date:________________
Remarks
Blowering Required.
Measuring point not available will be checked during shutdown.
1…MCCB(16A)
1…MCB(4A)
Off
_________________
            Electrician
Remarks
Off
Not applicable
_________________
            Electrician
Remarks
Not applicable
_________________
            Electrician
Remarks
Blowering Required.
Measuring point not available will be checked during shutdown.
1…VFD(Siemens)(18kw)
1…MCCB(40A)
1…MCB(6A)
1…MCB(4A)
1…Contactor
1…Relay
In running state.
Remarks
_________________
Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023)                                                            Packing MC
Inspection Date:_14-05-2025_
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                    YES
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                                      NO
REMARKS
     - Silica bag avaliable
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
    1      Is the door lock present & working properly of panels?                   YES
    2      Are all meters and bottons are named properly?                                   NO
    3      Is the Selector Switch (Isolation) working properly?                             NO
    4      Is the cable dressing in good condition?                                         NO
    5      Is there any dust present in panel?                                      YES
    6      Is the panel earthed properly?                                                   NO
REMARKS
     - Silica bag avaliable.
     - Joints on control wires.
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                     Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                            NO
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                                      NO
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
           been tested.                                                             YES
    7
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Panel tagging should be done.
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                            NO
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                                      NO
    7
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
           fuse rating,overload setting clearly marked on indivisual cubicals               NO
    9
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Silica bag avaliable
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                       -       -
   2    Are all meters and bottons are named properly?                               -       -
   3    Is the Selector Switch (Isolation) working properly?                         -       -
   4    Is the cable dressing in good condition?                                     -       -
   5    Is there any dust present in panel?                                          -       -
   6    Is the panel earthed properly?                                               -       -
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
    7      been tested.                                                              -       -
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                     -       -
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals        -       -
    10     Protection guard installed and in well condition on all live terminals    -       -
    11     Cable entry exit holes and trench covered.                                -       -
    12     Are all the connections cleaned & tightened properly?                     -       -
    13     Are all indication light working properly?                                -       -
REMARKS
     - Panel tagging should be done.
           PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
       AM Engg
Packing MCC 5 - Panel 09(A)
Next Due Date:________________
Remarks
Blowering Required.
Measuring point not available will be checked during shutdown.
2…MCB(4A)
1…MPCB
3…Relay
1…Contactor
Not applicable
_________________
            Electrician
                                     Remarks
Lubricating Oil Pump
Not applicable
Cable dressing required
Blowering Required.
Measuring point not available will be checked during shutdown.
2…MCB(4A)
1…MPCB
3…Relay
1…Contactor
Not applicable
_________________
            Electrician
Remarks
Not applicable
_________________
            Electrician
Remarks
Not applicable
Not applicable
_________________
            Electrician
Remarks
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                    YES
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                              YES
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
    7      been tested.                                                                     NO
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                            NO
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Panel tagging should be done.
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
acking MCC 5 - Cable compartment # 5
    Next Due Date:________________
Remarks
    Not applicable
    Not applicable
Blowering Required.
Not applicable
Not applicable
    _________________
                Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023)                                                            Packing MC
Inspection Date:_14-05-2025_
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                            NO
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                                      NO
REMARKS
     - Silica bag not avaliable
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
    1      Is the door lock present & working properly of panels?                   YES
    2      Are all meters and bottons are named properly?                                   NO
    3      Is the Selector Switch (Isolation) working properly?                             NO
    4      Is the cable dressing in good condition?                                         NO
    5      Is there any dust present in panel?                                      YES
    6      Is the panel earthed properly?                                                   NO
REMARKS
     - Panel tagging should be done.
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                     Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                            NO
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                                      NO
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
           been tested.                                                             YES
    7
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Silica bag avaliable
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                            NO
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                                      NO
    7
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Fan not working(Damaged)
     - Silica bag avaliable
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                       -       -
   2    Are all meters and bottons are named properly?                               -       -
   3    Is the Selector Switch (Isolation) working properly?                         -       -
   4    Is the cable dressing in good condition?                                     -       -
   5    Is there any dust present in panel?                                          -       -
   6    Is the panel earthed properly?                                               -       -
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
    7      been tested.                                                              -       -
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                     -       -
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals        -       -
    10     Protection guard installed and in well condition on all live terminals    -       -
    11     Cable entry exit holes and trench covered.                                -       -
    12     Are all the connections cleaned & tightened properly?                     -       -
    13     Are all indication light working properly?                                -       -
REMARKS
     - Panel tagging should be done.
           PPE and RPE Required:
Electrical Gloves
Dust Mask
Safety Shoes
__________________
       AM Engg
Packing MCC 5 - Panel 10(A)
Next Due Date:________________
Remarks
Not applicable
_________________
            Electrician
                                     Remarks
65V16A Slide Gate Below Mass Flow Hopper # 2
Not applicable
Cable dressing required
Blowering Required.
Measuring point not available will be checked during shutdown.
2…MCB(4A)
1…MPCB
3…Relay
1…Contactor
Not applicable
_________________
            Electrician
Remarks
Not applicable
_________________
            Electrician
Remarks
1…VFD(Siemens)(22Kw)
1…HMI
1…MCCB(50A)
1…MCB(6A)
1…MCB(4A)
1…Contactor
1…Relay
No SLD available with panels.
Not applicable
Not applicable
_________________
            Electrician
Remarks
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                    YES
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                              YES
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
    7      been tested.                                                                     NO
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                            NO
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Panel tagging should be done.
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
acking MCC 5 - Cable compartment # 6
    Next Due Date:________________
Remarks
    Not applicable
    Not applicable
Blowering Required.
Not applicable
Not applicable
    _________________
                Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023)                                                            Packing MC
Inspection Date:_14-05-2025_
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                            NO
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                                      NO
REMARKS
     - Silica bag not avaliable
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
    1      Is the door lock present & working properly of panels?                   YES
    2      Are all meters and bottons are named properly?                                   NO
    3      Is the Selector Switch (Isolation) working properly?                             NO
    4      Is the cable dressing in good condition?                                         NO
    5      Is there any dust present in panel?                                      YES
    6      Is the panel earthed properly?                                                   NO
REMARKS
     - Silica bag avaliable
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                     Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                            NO
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                                      NO
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
           been tested.                                                             YES
    7
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Silica bag avaliable
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                            NO
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                                      NO
    7
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Silica bag avaliable
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                       -       -
   2    Are all meters and bottons are named properly?                               -       -
   3    Is the Selector Switch (Isolation) working properly?                         -       -
   4    Is the cable dressing in good condition?                                     -       -
   5    Is there any dust present in panel?                                          -       -
   6    Is the panel earthed properly?                                               -       -
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
    7      been tested.                                                              -       -
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                     -       -
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals        -       -
    10     Protection guard installed and in well condition on all live terminals    -       -
    11     Cable entry exit holes and trench covered.                                -       -
    12     Are all the connections cleaned & tightened properly?                     -       -
    13     Are all indication light working properly?                                -       -
REMARKS
     - Panel tagging should be done.
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
__________________
       AM Engg
Packing MCC 5 - Panel 11(A)
Next Due Date:________________
Remarks
Not applicable
_________________
            Electrician
                                     Remarks
62P5A Labsa Transfer Pump # 1
Not applicable
Cable dressing required
Blowering Required.
Measuring point not available will be checked during shutdown.
1…MCCB(63A)
2…MCB(4A)
3…Relay
1…Contactor
Not applicable
_________________
            Electrician
Remarks
Not applicable
_________________
            Electrician
Remarks
1…VFD(Siemens)(22KW)
1…MCCB(50A)
1…MCB(6A)
1…MCB(4A)
1…Contactor
1…Relay
Not applicable
_________________
            Electrician
Remarks
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                            NO
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                                      NO
REMARKS
     - Silica bag not avaliable
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
    1      Is the door lock present & working properly of panels?                   YES
    2      Are all meters and bottons are named properly?                                   NO
    3      Is the Selector Switch (Isolation) working properly?                             NO
    4      Is the cable dressing in good condition?                                         NO
    5      Is there any dust present in panel?                                      YES
    6      Is the panel earthed properly?                                                   NO
    7
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Silica bag avaliable
     - Cable tray cover removed
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                     Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                            NO
   5    Is there any dust present in panel?                                         YES
    6      Is the panel earthed properly?                                                   NO
    7
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Panel tagging should be done.
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                     Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                            NO
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                                      NO
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
           been tested.                                                             YES
    7
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Silica bag avaliable
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                       -       -
   2    Are all meters and bottons are named properly?                               -       -
   3    Is the Selector Switch (Isolation) working properly?                         -       -
   4    Is the cable dressing in good condition?                                     -       -
   5    Is there any dust present in panel?                                          -       -
   6    Is the panel earthed properly?                                               -       -
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
    7      been tested.                                                              -       -
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                     -       -
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals        -       -
   10   Protection guard installed and in well condition on all live terminals   -   -
   11   Cable entry exit holes and trench covered.                               -   -
   12   Are all the connections cleaned & tightened properly?                    -   -
   13   Are all indication light working properly?                               -   -
REMARKS
     - Panel tagging should be done.
        PPE and RPE Required:
        Electrical Gloves
        Dust Mask
        Safety Shoes
        __________________
               AM Engg
Packing MCC 5 - Panel 12(A)
Next Due Date:________________
Remarks
F42 Supper
Not applicable
Cable dressing required
Blowering Required.
Measuring point not available will be checked during shutdown.
1…MCB(4A)
3…Relay
1…Contactor
1…MCCB(Removed)
Not applicable
_________________
            Electrician
                                     Remarks
62P11 Seal Water Pump (Tagging on masking tape)
Not applicable
Cable dressing required
Blowering Required.
Measuring point not available will be checked during shutdown.
1…VFD(Siemens)(4Kw)
1…HMI
2…MCB(4A)
1…MPCB
1…Contactor
1…Relay
Not applicable
_________________
            Electrician
Remarks
1…VFD(Siemens)(4Kw)
1…HMI
2…MCB(4A)
1…MPCB
1…Contactor
1…Relay
Not applicable
_________________
            Electrician
Remarks
Not applicable
_________________
            Electrician
Remarks
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                    YES
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                              YES
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
    7      been tested.                                                                     NO
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                            NO
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Cable tray cover not avaliable
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
acking MCC 5 - Cable compartment # 7
    Next Due Date:________________
Remarks
    Not applicable
    Not applicable
Blowering Required.
Not applicable
Not applicable
    _________________
                Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023)                                                            Packing MC
Inspection Date:_14-05-2025_
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                            NO
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                                      NO
REMARKS
     - Silica bag not avaliable
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
    1      Is the door lock present & working properly of panels?                   YES
    2      Are all meters and bottons are named properly?                                   NO
    3      Is the Selector Switch (Isolation) working properly?                             NO
    4      Is the cable dressing in good condition?                                 YES
    5      Is there any dust present in panel?                                      YES
    6      Is the panel earthed properly?                                                   NO
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
    7      been tested.                                                             YES
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Silica bag not avaliable
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                     Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                    YES
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                                      NO
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
    7      been tested.                                                             YES
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Silica bag avaliable
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                            NO
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                                      NO
    7
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Panel tagging should be done.
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                       -       -
   2    Are all meters and bottons are named properly?                               -       -
   3    Is the Selector Switch (Isolation) working properly?                         -       -
   4    Is the cable dressing in good condition?                                     -       -
   5    Is there any dust present in panel?                                          -       -
   6    Is the panel earthed properly?                                               -       -
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
    7      been tested.                                                              -       -
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                     -       -
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals        -       -
    10     Protection guard installed and in well condition on all live terminals    -       -
    11     Cable entry exit holes and trench covered.                                -       -
    12     Are all the connections cleaned & tightened properly?                     -       -
    13     Are all indication light working properly?                                -       -
REMARKS
     - Panel tagging should be done.
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
Packing MCC 5 - Panel 13(A)
Next Due Date:________________
Remarks
Not applicable
_________________
            Electrician
                                     Remarks
Packing Conveyor (Written with marker)
Not applicable
Blowering Required.
Measuring point not available will be checked during shutdown.
2…MCCB(30A)
Not applicable
_________________
            Electrician
Remarks
Blowering Required.
Measuring point not available will be checked during shutdown.
2…MCCB(30A)
Not applicable
_________________
            Electrician
Remarks
2…VFD(Siemens)(15Kw..Salt Silo)(22Kw)
2…HMI(1..HMI Removed)
1…MCCB(50A)
1...MCB(40A)(3-Pole)
1…MCB(6A)
2…MCB(4A)
1…Contactor
1…Relay
Not applicable
_________________
            Electrician
Remarks
_________________
            Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023)                                                            Packing MC
Inspection Date:_14-05-2025_
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                       -       -
   2    Are all meters and bottons are named properly?                               -       -
   3    Is the Selector Switch (Isolation) working properly?                         -       -
   4    Is the cable dressing in good condition?                                     -       -
   5    Is there any dust present in panel?                                          -       -
   6    Is the panel earthed properly?                                               -       -
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
    7      been tested.                                                              -       -
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                     -       -
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals        -       -
    10     Protection guard installed and in well condition on all live terminals    -       -
    11     Cable entry exit holes and trench covered.                                -       -
    12     Are all the connections cleaned & tightened properly?                     -       -
    13     Are all indication light working properly?                                -       -
REMARKS
     - Panel tagging should be done.
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
    4      Is the cable dressing in good condition?                                 YES
    5      Is there any dust present in panel?                                      YES
    6      Is the panel earthed properly?                                                   NO
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
    7      been tested.                                                             YES
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Silica bag not avaliable
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                     Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                    YES
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                                      NO
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
    7      been tested.                                                             YES
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Silica bag avaliable
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                            NO
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                                      NO
    7
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals   YES
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Silica bag not avaliable
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                       -       -
   2    Are all meters and bottons are named properly?                               -       -
   3    Is the Selector Switch (Isolation) working properly?                         -       -
   4    Is the cable dressing in good condition?                                     -       -
   5    Is there any dust present in panel?                                          -       -
   6    Is the panel earthed properly?                                               -       -
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
    7      been tested.                                                              -       -
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                     -       -
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals        -       -
    10     Protection guard installed and in well condition on all live terminals    -       -
    11     Cable entry exit holes and trench covered.                                -       -
    12     Are all the connections cleaned & tightened properly?                     -       -
    13     Are all indication light working properly?                                -       -
REMARKS
     - Panel tagging should be done.
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
Packing MCC 5 - Panel 14(A)
Next Due Date:________________
Remarks
_________________
            Electrician
Remarks
1…MCCB(200A)
Not applicable
_________________
            Electrician
Remarks
Blowering Required.
Measuring point not available will be checked during shutdown.
1…MCCB(200A)
_________________
            Electrician
Remarks
Not applicable
_________________
            Electrician
Remarks
_________________
            Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023)                                                Packing MCC 5 - C
Inspection Date:_14-05-2025_
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                    YES
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                              YES
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
    7      been tested.                                                                     NO
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                            NO
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Panel tagging should be done.
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
acking MCC 5 - Cable compartment # 8
    Next Due Date:________________
Remarks
    Not applicable
    Not applicable
Blowering Required.
Not applicable
Not applicable
    _________________
                Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023)                                                            Packing MC
Inspection Date:_14-05-2025_
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                    YES
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                                      NO
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
    7      been tested.                                                             YES
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Silica bag not avaliable
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
    4      Is the cable dressing in good condition?                                 YES
    5      Is there any dust present in panel?                                      YES
    6      Is the panel earthed properly?                                                   NO
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
    7      been tested.                                                             YES
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Silica bag not avaliable
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                     Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                    YES
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                                      NO
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
    7      been tested.                                                             YES
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Silica bag not avaliable
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                            NO
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                                      NO
    7
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Silica bag not avaliable
     - Cable tray cover removed
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                       -       -
   2    Are all meters and bottons are named properly?                               -       -
   3    Is the Selector Switch (Isolation) working properly?                         -       -
   4    Is the cable dressing in good condition?                                     -       -
   5    Is there any dust present in panel?                                          -       -
   6    Is the panel earthed properly?                                               -       -
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
    7      been tested.                                                              -       -
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                     -       -
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals        -       -
    10     Protection guard installed and in well condition on all live terminals    -       -
    11     Cable entry exit holes and trench covered.                                -       -
    12     Are all the connections cleaned & tightened properly?                     -       -
    13     Are all indication light working properly?                                -       -
REMARKS
     - Panel tagging should be done.
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
Packing MCC 5 - Panel 15(A)
Next Due Date:________________
Remarks
No tagging available.
Not applicable
Blowering Required.
Measuring point not available will be checked during shutdown.
1…MCCB(100A)
Not applicable
_________________
            Electrician
Remarks
No tagging available.
Not applicable
Blowering Required.
Measuring point not available will be checked during shutdown.
1…MCCB(100A)
Not applicable
_________________
            Electrician
Remarks
No tagging available.
Not applicable
Blowering Required.
Measuring point not available will be checked during shutdown.
1…MCCB(250A)
_________________
            Electrician
Remarks
Not applicable
_________________
            Electrician
Remarks
_________________
            Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023)                                                            Packing MC
Inspection Date:_14-05-2025_
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                    YES
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                                      NO
    7
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                    YES
    13     Are all indication light working properly?                                       NO
REMARKS
     - Panel tagging should be done.
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
    1      Is the door lock present & working properly of panels?                   YES
    2      Are all meters and bottons are named properly?                                   NO
    3      Is the Selector Switch (Isolation) working properly?                             NO
    4      Is the cable dressing in good condition?                                 YES
    5      Is there any dust present in panel?                                      YES
    6      Is the panel earthed properly?                                                   NO
REMARKS
     - Silica bag avaliable
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
                                                                                       Status
  S.No.                                     Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                       -       -
   2    Are all meters and bottons are named properly?                               -       -
   3    Is the Selector Switch (Isolation) working properly?                         -       -
   4    Is the cable dressing in good condition?                                     -       -
   5    Is there any dust present in panel?                                          -       -
   6    Is the panel earthed properly?                                               -       -
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
    7      been tested.                                                              -       -
        All contactors,EOCR,Thermal Overload and Relay contacts are working
   8    properly including auxilary contacts.                                    -   -
        Al panels have details of the circuit(SLD),cable size,
   9    fuse rating,overload setting clearly marked on indivisual cubicals       -   -
   10   Protection guard installed and in well condition on all live terminals   -   -
   11   Cable entry exit holes and trench covered.                               -   -
   12   Are all the connections cleaned & tightened properly?                    -   -
   13   Are all indication light working properly?                               -   -
REMARKS
     - Panel tagging should be done.
        PPE and RPE Required:
        Electrical Gloves
        Dust Mask
        Safety Shoes
        __________________
               AM Engg
Packing MCC 5 - Panel 16(A)
Next Due Date:________________
Remarks
Blowering Required.
Measuring point not available will be checked during shutdown.
2…MCB(4A)
1…Timer Relay
3…Relay
4…Contactor
1…MCCB(Removed)
Not applicable
_________________
            Electrician
                                     Remarks
65DE-K1 Blower for DE System # 1
Not applicable
Blowering Required.
Measuring point not available will be checked during shutdown.
1…VFD(Siemens)(30KW)
2…MCB(4A)
3…Relay(1..Missing)
1…Timer Relay
Not applicable
_________________
            Electrician
Remarks
_________________
            Electrician
MCC Inspection CheckSheet
ENG-FRM-MCC(Rev 2, Dated : 15/12/2023)                                                Packing MCC 5 - C
Inspection Date:_14-05-2025_
                                                                                       Status
  S.No.                                    Inspection
                                                                                    YES      NO
Check Points
   1    Is the door lock present & working properly of panels?                      YES
   2    Are all meters and bottons are named properly?                                      NO
   3    Is the Selector Switch (Isolation) working properly?                                NO
   4    Is the cable dressing in good condition?                                            NO
   5    Is there any dust present in panel?                                         YES
   6    Is the panel earthed properly?                                                      NO
           All contactors,EOCR,Thermal Overload and Circuit breaker tripping have
    7      been tested.                                                             YES
           All contactors,EOCR,Thermal Overload and Relay contacts are working
    8      properly including auxilary contacts.                                    YES
           Al panels have details of the circuit(SLD),cable size,
    9      fuse rating,overload setting clearly marked on indivisual cubicals               NO
    10     Protection guard installed and in well condition on all live terminals           NO
    11     Cable entry exit holes and trench covered.                               YES
    12     Are all the connections cleaned & tightened properly?                            NO
    13     Are all indication light working properly?                               YES
REMARKS
     - Panel tagging should be done.
           PPE and RPE Required:
           Electrical Gloves
           Dust Mask
           Safety Shoes
           __________________
                  AM Engg
acking MCC 5 - Cable compartment # 9
    Next Due Date:________________
Remarks
    No tagging available.
    Selector switch for current measurement is faulty.
    Cable dressing required.
    Blowering done.
    Measuring point not available will be checked during shutdown.
In running state.
    _________________
                Electrician