The document outlines the internship standard operating procedures for various departments at Jyoti CNC Unit-3, including Quality Assurance, Sheet Metal, Casting, and Assembly. It includes safety guidelines, testing procedures, process arrangements, and specifications for equipment used in each department. Additionally, it provides contact information for the training coordinator and various forms for recording test results and processes.

Uploaded by

hiteshdharaviya0
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views30 pages

Weeks

The document outlines the internship standard operating procedures for various departments at Jyoti CNC Unit-3, including Quality Assurance, Sheet Metal, Casting, and Assembly. It includes safety guidelines, testing procedures, process arrangements, and specifications for equipment used in each department. Additionally, it provides contact information for the training coordinator and various forms for recording test results and processes.

Uploaded by

hiteshdharaviya0
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 30

Name of Student: -______________________________________________________

Name of College: -______________________________________________________

Semester: - ___________

Contact No:- + 9 1

Internship Duration: - DD/MM/YYYY To DD/MM/YYYY

______Weeks

Contact : Satyajeetsinh Zala


(Training Coordinator)
Mobile : 8460660654
Email : satyajeet@sathway.org
Internship
S tandard

O perating

P rocedure

Quality Assurance
Department
Jyoti CNC Unit-3
Safety
 Wear Safety Helmet ⛑ properly
 Wear Safety goggles 👓
 Wear Safety ear buds 🎧
 Wear Safety Gloves 🧤
 Wear Safety Shoes 🥾
 Be careful during Lifting operation by workers
 Identify Assembly Point in plant
 Identify location of fire extinguisher

Work Safe Today – Productivity Can Wait


G D & T (Geometric Dimensioning and Tolerances)

Angularity Runout Total Runout

Cylindricity Parallelism Perpendicularity

Position Circularity Concentricity

Profile on a line Profile on a curve Straightness

Symmetric Flatness QR Code for GD&T Video


Sr No Name of Test Arrange in Ascending Order
1 Ball Bar Test

2 Coolant Trial

3 DDR/RTT Calibration

4 Final Inspection

5 Geometric Test

6 Laser Calibration

7 Nasa

8 PDI Inspection

9 Practical Test

10 QA Electrical Check

11 Spindle Vibration
Floor Shop No: ___________ Model Number of Machine: _________________ Date: DD/MM/YYYY Time: HH:MM AM/PM
Name of Instrument Used with
Objective of test Parameter Measure Parameter Unit
Test Specification
Ball Bar Test
Floor Shop No: ___________ Model Number of Machine: _________________ Date: DD/MM/YYYY Time: HH:MM AM/PM
Name of Instrument Used with
Objective of test Parameter Measure Parameter Unit
Test Specification & Range
Coolant Trial
Floor Shop No: ___________ Model Number of Machine: _________________ Date: DD/MM/YYYY Time: HH:MM AM/PM
Name of Instrument Used with
Objective of test Parameter Measure Parameter Unit
Test Specification & Range
DDR/RTT Calibration
Floor Shop No: ___________ Model Number of Machine: _________________ Date: DD/MM/YYYY Time: HH:MM AM/PM
Name of Instrument Used with
Objective of test Parameter Measure Parameter Unit
Test Specification & Range
Final Inspection
Floor Shop No: ___________ Model Number of Machine: _________________ Date: DD/MM/YYYY Time: HH:MM AM/PM
Name of Instrument Used with
Objective of test Parameter Measure Parameter Unit
Test Specification & Range
Geometric Test
Floor Shop No: ___________ Model Number of Machine: _________________ Date: DD/MM/YYYY Time: HH:MM AM/PM
Name of Instrument Used with
Objective of test Parameter Measure Parameter Unit
Test Specification & Range
Laser Calibration
Floor Shop No: ___________ Model Number of Machine: _________________ Date: DD/MM/YYYY Time: HH:MM AM/PM
Name of Instrument Used with
Objective of test Parameter Measure Parameter Unit
Test Specification & Range
Nasa
Floor Shop No: ___________ Model Number of Machine: _________________ Date: DD/MM/YYYY Time: HH:MM AM/PM
Name of Instrument Used with
Objective of test Parameter Measure Parameter Unit
Test Specification & Range
PDI Inspection
Floor Shop No: ___________ Model Number of Machine: _________________ Date: DD/MM/YYYY Time: HH:MM AM/PM
Name of Instrument Used with
Objective of test Parameter Measure Parameter Unit
Test Specification & Range
QA Electrical Check
Floor Shop No: ___________ Model Number of Machine: _________________ Date: DD/MM/YYYY Time: HH:MM AM/PM
Name of Instrument Used with
Objective of test Parameter Measure Parameter Unit
Test Specification & Range
Spindle Vibration
Internship
S tandard

O perating

P rocedure

Sheet Metal
Department
Jyoti CNC Unit-3
Sr No Name of Process Arrange in Ascending Order
1 Bending

2 Grinding

3 Inspection

4 Laser Cutting

5 Painting

6 Welding

Name of the products make in Sheet Metal Shop

1 _________________________________

2 _________________________________

3 _________________________________

4 ________________________________

List the Materials of the sheet use in Sheet Metal Shop

1 _________________________________

2 _________________________________

3 _________________________________

4 ________________________________
List the Area of the Sheet metal Workshop

1 _________________________________

2 _________________________________

3 Guard Welding Area

4 ________________________________

5 ________________________________

6 ________________________________

7 ________________________________

8 ________________________________

9 ________________________________

10 ________________________________

11 ________________________________
Date: DD/MM/YYYY Time: HH:MM AM/PM
Laser Cutting Machine Specification
Machine Manufacturer Maximum Maximum Maximum No of
Sr No Name Thickness Length Width Bed
LB1
LB2
LB3
LB4

Crane for Sheet Handle


Type OverHead/Granty/Jib
Loading Capacity in Ton
Type Of Gripper Magnetic/Vacuum

Give Difference Between Magnetic & Vacuum


Magnetic Grippers Vacuum Grippers
Bending Machine Specification
Maximum Maximum Length of
Manufacturer Name Maximum Angle
Thickness of Sheet Sheet
PB1
PB2
PB3
PB4
PB5
PB6
PB7
PB8

Tick the Type of Welding Machine Use For Welding:-


1. TIG
2. MIG
3. Oxy-Acetylene Gas
4. Arc Welding

Write the Full Form of TIG & MIG


TIG:- ____________________________________________
MIG:-____________________________________________

The maximum thickness of sheet in Guard Welding Area is _______mm.


Welding of sheet whose is Thickness between ____mm to _____mm is done in Fabrication Area.

Write the Requirements of the Grinding after Welding on sheet.

________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
Type of Inspection done in Inspection Area

1. _____________________________
2. _____________________________
3. _____________________________
4. _____________________________
5. _____________________________
6. _____________________________

Write down the Pre-Process (Chemical) Requires before Painting

1. _____________________________
2. _____________________________
3. _____________________________

Write the type of the painting in paint shop

1. _____________________________
2. _____________________________
Internship
S tandard

O perating

P rocedure

Casting
Department
Jyoti CNC Unit-3
Sr No Name of Process Arrange in Ascending Order
1 Pattern Making

2 Mold making

3 Core Making

4 Pouring

5 Material Melting

6 Mold Breaking

7 Core removal Process

8 Sand Blasting

9 Cleaning of Casting

10 Mold Cooling

11 Inspection of Casting
Type of Crane Total No of Cranes Capacity of Crane Capacity Unit

Material Use for Pattern


Pattern
Advantages Disadvantages
material

Write Function of pattern in Casting.

______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Write the function of core.
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Furnace Specification
Type
Capacity

List of Casting Defects observed


 __________________________
 __________________________
 __________________________
 __________________________
 __________________________
 __________________________
 __________________________
 __________________________
 __________________________
 __________________________
 __________________________
 __________________________
 __________________________
 __________________________
 __________________________
Casting inspection
Name of Test Objective of test Instrument Used with Specification
Internship
S tandard

O perating

P rocedure

Assembly
Department
Jyoti CNC Unit-3
Sr No Name of Process Arrange in Ascending Order
1 Apply Guard to Basic Structure

2 Assemble APC on Basic Structure

3 Assemble ATC on Basic Structure

4 Assembly of Column & Bed

5 Assembly of X & Y Axis

6 Assembly of X & Z Axis

7 Ball Screw Assembly on X axis

8 Ball Screw Assembly on Y axis

9 Ball Screw Assembly on Z axis

10 Coolant Fitting

11 Fit Motor in each Axis & Spindle

12 HMI Fitting

13 Hydraulic System Fitting

14 LM Guideway Assembly on Y axis

15 LM Guideway Assembly on Z axis

16 LM* Guideway Assembly on X axis

17 Lubrication System Fitting

18 Machine Control Panel Fitting

19 Pneumatic System Fitting

20 Sensor Fitting

21 Three points Leveling


No No
Machine Floor Type of
of X Y Z A B C APC ATC of CSR (Customer Specific Requirement)
Sr No Machine*
Axis Tool

*-Horizontal Turning, Vertical Turning, Turn Mill, VMC, HMC, Universal Milling Machine etc.
Type of Crane Total No of Cranes Capacity of Crane Capacity Unit

Signal Tower

Light Color Meaning


Green
Yellow
Red

Write Function of tapper pin in Assembly.

______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Write the function of torque wrench
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________