Section A: Price Bid-Supply of Material
Sr.
                           Item Description (A)                           Unit (B)       Quantity (C)
No.
1. Smart Meter: -
     Single phase whole current Smart Meter (with Net-Metering &
     Pre-paid functionality) – Consumer Meter with Polycarbonate
 1.1 WeatherProof Outdoor Type Meter Cover Box, requisite no. of            No's          330,598.00
     polycarbonate seal, other sundry items like wooden cleats for
     cable dressing, holding clamps, nut & bolts etc. or any other
     spare parts.
     Three phase whole current Smart Meter (with Net-Metering &
     Pre-paid functionality) – Consumer Meter with Polycarbonate
 1.2 Weather Proof Outdoor Type Meter Cover Box, requisite no. of           No's          37,198.00
     polycarbonate seal, other sundry items like wooden cleats for
     cable dressing, holding clamps, nut & bolts etc. or any other
     spare parts.
     Three phase CT operated Smart Meter – For LT Consumer
     metering (with Net-Metering & Pre-paid functionality) with
 1.3 requisite no. of polycarbonate seal, other sundry items like           No's           4,066.00
     wooden cleats for cable dressing, control wiring, TTB, holding
     clamps, nut & bolts etc. or any other spare parts. Without CTs, DI
     provision & Meter box.
     Three phase CT operated Smart Meter – For DT metering (with
     Net-Metering & Pre-paid functionality) with requisite no. of
 1.4 polycarbonate seal, other sundry items like wooden cleats for          No's          12,255.00
     cable dressing, control wiring, TTB, holding clamps, nut & bolts
     etc. or any other spare parts. Without CTs, DI provision & Meter
     box.
     Three phase CT/PT operated Smart Meter – For HT Consumer
 1.5 metering (with Net-Metering & Pre-paid functionality) with             No's           1,554.00
     requisite no. of polycarbonate seal, other sundry items like
     wooden cleats for cable dressing, control wiring, TTB, holding
     clamps, nut & bolts etc. or any other spare parts. Without CTs, DI
     provision & Meter box.
                               Total (1)
2. Smart Meter Box (for DT Metering, LT-CT Consumers and HT CT PT Consumers only): -
 2.1 Deep Drawn M.S. Sheet Weatherproof Outdoor Type Meter               No's   12,255.00
     Cover Box for 3-Ph CT Operated Smart Meter (For DT metering)
     along with holding clamps/ channels for mounting and other
     allied accessories like nut, bolt, washer etc for erection.
 2.2 Deep Drawn M.S. Sheet Weatherproof Outdoor Type Meter               No's    609.90
     Cover Box for 3-Ph CT Operated Smart Meter (For LT Consumer
     metering) along with holding clamps/ channels for mounting and
     other allied accessories like nut, bolt, washer etc for erection.
     Deep Drawn M.S. Sheet Weatherproof Outdoor Type Meter
 2.3 Cover Box for 3-Ph HT CTPT Operated Smart Meter (For HT             No's     77.70
     Consumer metering) along with holding clamps/ channels for
     mounting and other allied accessories like nut, bolt, washer etc
     for erection.
                                        Total (2)
LT Auxiliary Components: -
3. For 1-Ph & 3-Ph Whole current Smart metering: -
     LT PVC armoured Cable 2C*10 mm2, 1.1k V Grade along with
 3.1 thimble/lugs, tape, etc. and other necessary accessories for        Km.     960.06
     erection.
     LT PVC un-armoured Cable- 2C*10 mm2, 1.1k V Grade along with
 3.2 thimble/lugs, tape, etc. and other necessary accessories for        Km.     661.20
     erection.
     LT XLPE armoured cable- 4C*16 mm2, 1.1k V Grade along with
 3.3 thimble/lugs, tape, etc. and other necessary accessories for        Km.      57.28
     erection.
     LT PVC un-armoured cable- 4C*16 mm2, 1.1k V Grade along with
 3.4 thimble/lugs, tape, etc. and other necessary accessories for        Km.      13.02
     erection.
     LT XLPE armoured cable- 4C*25 mm2, 1.1k V Grade along with
 3.5 thimble/lugs, tape, etc. and other necessary accessories for        Km.      24.55
     erection.
     LT PVC unarmored cable- 4C*25 mm2, 1.1k V Grade along with
 3.6 thimble/lugs, tape, etc. and other necessary accessories for        Km.       5.58
     erection.
3.70 Insulated Piercing Connectors (IPC) (16-95 mm2/ 4-50 mm2)           No's   255,392.68
                               Total (3)
4. For 3-Ph LTCT DT Smart Metering: -
     Single core 95 mm² LT PVC un-armored cable for upto 63kVA DT
 4.1 along with thimble/lugs, tape, etc. and other necessary           Km.    224.56
     accessories for erection.
     Single core 120 mm² LT PVC un-armored cable for above 63kVA
 4.2 & upto 100kVA DT along with thimble/lugs, tape, etc. and other    Km.    150.32
     necessary accessories for erection.
     Single core 185 mm² LT PVC un-armored cable for above 100
 4.3 kVA & upto 200kVA DT along with thimble/lugs, tape, etc. and      Km.     82.24
     other necessary accessories for erection.
     Single core 300 mm² LT PVC un-armored cable for above 200kVA
 4.4 & upto 500kVA DT along with thimble/lugs, tape, etc. and other    Km.     26.68
     necessary accessories for erection.
     Single core 630 mm² LT PVC un-armored cable for DTs above
 4.5 500kVA capacity along with thimble/lugs, tape, etc. and other     Km.      4.20
     necessary accessories for erection.
       100/5A CT for upto 63 kVA DT along with necessary accessories
 4.6                                                                   No's   5,614.00
       for erection.
       200/5A CT for above 63kVA & upto 100 kVA DT along with
 4.7                                                                   No's   3,758.00
       necessary accessories for erection.
       400/5A CT for above 100kVA & upto 200 kVA DT along with
 4.8                                                                   No's   2,056.00
       necessary accessories for erection.
       800/5A CT for above 200kVA & upto 400 kVA DT along with
4.90                                                                   No's   385.00
       necessary accessories for erection.
       1000/5A CT for above 400kVA & upto 500 kVA DT along with
4.10                                                                   No's   110.00
       necessary accessories for erection.
       1200/5A CT for above 500kVA & upto 630 kVA DT along with
4.11                                                                   No's    67.00
       necessary accessories for erection.
       2000/5A CT for above 630kVA & upto 1000 kVA and above DT
4.12                                                                   No's   105.00
       capacity along with necessary accessories for erection.
                             Total (4)
5. For 3-Ph LTCT Consumer Smart Metering: -
 5.1 3.5 core 95 mm² LT PVC un-armoured cable along with               Km.      1.22
     thimble/lugs, tape, etc. and other necessary accessories for
     erection.
 5.2 Four core 50 mm² LT PVC un-armoured cable along with              Km.      6.10
     thimble/lugs, tape, etc. and other necessary accessories for
     erection.
       Four core 25 mm² LT PVC un-armoured cable along with
 5.3 thimble/lugs, tape, etc. and other necessary accessories for        Km.             4.88
       erection.
 5.4 50/5A CT along with necessary accessories for erection.            No's            162.64
 5.5 100/5A CT along with necessary accessories for erection.           No's            243.96
                               Total (5)
6. For 3-Ph HT Consumer Smart Metering: -
 6.1 5/5A CT along with necessary accessories for erection.             No's              7.1
 6.2 10/5A CT along with necessary accessories for erection.            No's              7.1
 6.3 15/5A CT along with necessary accessories for erection.            No's              7.1
 6.4 25/5A CT along with necessary accessories for erection.            No's              7.1
 6.5 50/5A CT along with necessary accessories for erection.            No's              7.1
 6.6 100/5A CT along with necessary accessories for erection.           No's              7.1
 6.7 150/5A CT along with necessary accessories for erection.           No's              7.1
 6.8 200/5A CT along with necessary accessories for erection.           No's              7.1
 6.9 250/5A CT along with necessary accessories for erection.           No's              7.1
6.10 300/5A CT along with necessary accessories for erection.           No's              7.1
6.11 400/5A CT along with necessary accessories for erection.           No's              7.1
6.12 11kv PT along with necessary accessories for erection.             No's             77.7
                               Total (6)
                                                                     Section B: Price Bid-Erection of Material
Sr.
                           Item Description (A)                       Unit (B)      Quantity (C)
No.
1. Smart Meter: -
     Single phase whole current Smart Meter (with Net-Metering &
     Pre-paid functionality) – Consumer Meter with Polycarbonate
 1.1 WeatherProof Outdoor Type Meter Cover Box, requisite no. of        No's          330,598.00
     polycarbonate seal, other sundry items like wooden cleats for
     cable dressing, holding clamps, nut & bolts etc. or any other
     spare parts.
     Three phase whole current Smart Meter (with Net-Metering &
     Pre-paid functionality) – Consumer Meter with Polycarbonate
 1.2 Weather Proof Outdoor Type Meter Cover Box, requisite no. of         No's   37,198.00
     polycarbonate seal, other sundry items like wooden cleats for
     cable dressing, holding clamps, nut & bolts etc. or any other
     spare parts.
     Three phase CT operated Smart Meter – For LT Consumer
     metering (with Net-Metering & Pre-paid functionality) with
 1.3 requisite no. of polycarbonate seal, other sundry items like         No's   4,066.00
     wooden cleats for cable dressing, control wiring, TTB, holding
     clamps, nut & bolts etc. or any other spare parts. Without CTs, DI
     provision & Meter box.
     Three phase CT operated Smart Meter – For DT metering (with
     Net-Metering & Pre-paid functionality) with requisite no. of
 1.4 polycarbonate seal, other sundry items like wooden cleats for        No's   12,255.00
     cable dressing, control wiring, TTB, holding clamps, nut & bolts
     etc. or any other spare parts. Without CTs, DI provision & Meter
     box.
     Three phase CT/PT operated Smart Meter – For HT Consumer
 1.5 metering (with Net-Metering & Pre-paid functionality) with           No's   1,554.00
     requisite no. of polycarbonate seal, other sundry items like
     wooden cleats for cable dressing, control wiring, TTB, holding
     clamps, nut & bolts etc. or any other spare parts. Without CTs, DI
     provision & Meter box.
                               Total (1)
2. Smart Meter Box (for DT Metering, LT-CT Consumers and HT CT PT Consumers only): -
 2.1 Deep Drawn M.S. Sheet Weatherproof Outdoor Type Meter                No's   12,255.00
     Cover Box for 3-Ph CT Operated Smart Meter (For DT metering)
     along with holding clamps/ channels for mounting and other
     allied accessories like nut, bolt, washer etc for erection.
 2.2 Deep Drawn M.S. Sheet Weatherproof Outdoor Type Meter                No's    609.90
     Cover Box for 3-Ph CT Operated Smart Meter (For LT Consumer
     metering) along with holding clamps/ channels for mounting and
     other allied accessories like nut, bolt, washer etc for erection.
     Deep Drawn M.S. Sheet Weatherproof Outdoor Type Meter
 2.3 Cover Box for 3-Ph HT CTPT Operated Smart Meter (For HT              No's    77.70
     Consumer metering) along with holding clamps/ channels for
     mounting and other allied accessories like nut, bolt, washer etc
     for erection.
                                        Total (2)
LT Auxiliary Components: -
3. For 1-Ph & 3-Ph Whole current Smart metering: -
     LT PVC armoured Cable 2C*10 mm2, 1.1k V Grade along with
 3.1 thimble/lugs, tape, etc. and other necessary accessories for     Km.     960.06
     erection.
     LT PVC un-armoured Cable- 2C*10 mm2, 1.1k V Grade along with
 3.2 thimble/lugs, tape, etc. and other necessary accessories for     Km.     661.20
     erection.
     LT XLPE armoured cable- 4C*16 mm2, 1.1k V Grade along with
 3.3 thimble/lugs, tape, etc. and other necessary accessories for     Km.      57.28
     erection.
     LT PVC un-armoured cable- 4C*16 mm2, 1.1k V Grade along with
 3.4 thimble/lugs, tape, etc. and other necessary accessories for     Km.      13.02
     erection.
     LT XLPE armoured cable- 4C*25 mm2, 1.1k V Grade along with
 3.5 thimble/lugs, tape, etc. and other necessary accessories for     Km.      24.55
     erection.
     LT PVC unarmored cable- 4C*25 mm2, 1.1k V Grade along with
 3.6 thimble/lugs, tape, etc. and other necessary accessories for     Km.       5.58
     erection.
3.70 Insulated Piercing Connectors (IPC) (16-95 mm2/ 4-50 mm2)        No's   255,392.68
                             Total (3)
4. For 3-Ph LTCT DT Smart Metering: -
     Single core 95 mm² LT PVC un-armored cable for upto 63kVA DT
 4.1 along with thimble/lugs, tape, etc. and other necessary          Km.       0.00
     accessories for erection.
     Single core 120 mm² LT PVC un-armored cable for above 63kVA
 4.2 & upto 100kVA DT along with thimble/lugs, tape, etc. and other   Km.       0.00
     necessary accessories for erection.
     Single core 185 mm² LT PVC un-armored cable for above 100
 4.3 kVA & upto 200kVA DT along with thimble/lugs, tape, etc. and     Km.       0.00
     other necessary accessories for erection.
     Single core 300 mm² LT PVC un-armored cable for above 200kVA
 4.4 & upto 500kVA DT along with thimble/lugs, tape, etc. and other   Km.       0.00
     necessary accessories for erection.
     Single core 630 mm² LT PVC un-armored cable for DTs above
 4.5 500kVA capacity along with thimble/lugs, tape, etc. and other    Km.       4.20
     necessary accessories for erection.
     100/5A CT for upto 63 kVA DT along with necessary accessories
 4.6                                                                  No's      0.00
     for erection.
       200/5A CT for above 63kVA & upto 100 kVA DT along with
 4.7                                                                  No's      0.00
       necessary accessories for erection.
       400/5A CT for above 100kVA & upto 200 kVA DT along with
 4.8                                                                  No's      0.00
       necessary accessories for erection.
       800/5A CT for above 200kVA & upto 400 kVA DT along with
4.90                                                                  No's    385.00
       necessary accessories for erection.
       1000/5A CT for above 400kVA & upto 500 kVA DT along with
4.10                                                                  No's        110.00
       necessary accessories for erection.
       1200/5A CT for above 500kVA & upto 630 kVA DT along with
4.11                                                                  No's         67.00
       necessary accessories for erection.
       2000/5A CT for above 630kVA & upto 1000 kVA and above DT
4.12                                                                  No's        105.00
       capacity along with necessary accessories for erection.
                             Total (4)
5. For 3-Ph LTCT Consumer Smart Metering: -
     3.5 core 95 mm² LT PVC un-armoured cable along with
 5.1 thimble/lugs, tape, etc. and other necessary accessories for      Km.          1.22
     erection.
     Four core 50 mm² LT PVC un-armoured cable along with
 5.2 thimble/lugs, tape, etc. and other necessary accessories for      Km.          6.10
     erection.
       Four core 25 mm² LT PVC un-armoured cable along with
  5.3 thimble/lugs, tape, etc. and other necessary accessories for     Km.          4.88
       erection.
  5.4 50/5A CT along with necessary accessories for erection.         No's        162.64
  5.5 100/5A CT along with necessary accessories for erection.        No's        243.96
                                Total (5)
6. For 3-Ph HT Consumer Smart Metering: -
  6.1 5/5A CT along with necessary accessories for erection.          No's          7.1
  6.2 10/5A CT along with necessary accessories for erection.         No's          7.1
  6.3 15/5A CT along with necessary accessories for erection.         No's          7.1
  6.4 25/5A CT along with necessary accessories for erection.         No's          7.1
  6.5 50/5A CT along with necessary accessories for erection.         No's          7.1
  6.6 100/5A CT along with necessary accessories for erection.        No's          7.1
  6.7 150/5A CT along with necessary accessories for erection.        No's          7.1
  6.8 200/5A CT along with necessary accessories for erection.        No's          7.1
  6.9 250/5A CT along with necessary accessories for erection.        No's          7.1
 6.10 300/5A CT along with necessary accessories for erection.        No's          7.1
 6.11 400/5A CT along with necessary accessories for erection.        No's          7.1
 6.12 11kv PT along with necessary accessories for erection.          No's          77.7
                                Total (6)
                              Section C: Price Bid-Supply, Installation & Commissioning of Software Componen
Sr.
                           Item Description (A)                      Unit (B)   Quantity (C)
No.
7. Application Software, Training Cost & Consumer Indexing: -
     Head End System software, WFM, other IT applications,
     Establishment of SMOC & SMMC (Supply, Installation,
 7.1                                                             Lumpsum        1
     Commissioning, Testing & Integration with MDMS/ Billing
     software and other IT applications as defined in the RFP)
 7.2 Training Cost                                               Lumpsum       1.00
                                                                    Per
 7.3 Consumer Indexing                                                      385,671.00
                                                                 Consumer
                               Total (7)
8. Other Operation and Maintenance cost: -
                                                                  Meter/
 8.1 Operation & Maintenance Cost                                           385,671.00
                                                                  Month
                                                                  Meter/
 8.2                                                                        385,671.00
       HES Licensing/ATS/FMS Charges for HES for 10 years         Month
                                                                  Meter/
 8.3                                                                        385,671.00
       GPRS connectivity charges for 10 years                     Month
                               Total (8)
                             Grand Total
-Supply of Material
                                             Supply
            Rate per Unit including
                                       GST                     Total cost of meter (in
              all taxes and duties              Rate per Unit
                                    applicabl                   INR) (F = C x (Dx(1+E
            other than GST (in INR/            (Including GST)
                                    e in % (E)                           %)))
              month/ meter) (D)
y): -
Erection of Material
                                 Installation & Commissioning
                                                              Total Installation &
                Installation &       GST                        Commissioning
                                              Rate per Unit
             Commissioning Charge applicabl                     Charge {in INR/
                                             (Including GST)
                 (in INR) (G)     e in % (H)                 month/meter/(I = G x
                                                                  (1+H/100)}
y): -
oning of Software Component, O&M and Connectivity
                          Supply, Installation and Commissioning
                                             Rate per Unit Total cost of Supply,
          Rate per Unit including   Rate of
                                            (Including GST)   Installation &
            all taxes and duties    GST (in
                                              F = D X (1 + CommissioningG = C x
          other than GST (in INR)   %age)
                                                 E/100)         F (in INR)
                     (D)              (E )
                                                   (F)              (G)