0% found this document useful (0 votes)
15 views11 pages

Sap PP S

The document outlines the SAP PP S/4 HANA implementation knowledge transfer for Tata Consumer Products Limited, detailing the company's profile, product portfolio, and global presence. It provides a structured approach to implementation, including project scope, timeline, and success criteria, along with specific production planning methods and quality management integration. Key considerations for industry-specific requirements and integration points are also highlighted to ensure effective execution of the project.

Uploaded by

Moorthy Esakky
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views11 pages

Sap PP S

The document outlines the SAP PP S/4 HANA implementation knowledge transfer for Tata Consumer Products Limited, detailing the company's profile, product portfolio, and global presence. It provides a structured approach to implementation, including project scope, timeline, and success criteria, along with specific production planning methods and quality management integration. Key considerations for industry-specific requirements and integration points are also highlighted to ensure effective execution of the project.

Uploaded by

Moorthy Esakky
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 11

SAP PP S/4 HANA Implementation Knowledge Transfer

Tata Consumer Products Limited

Table of Contents with Sub-Headings

SR
MAIN TOPIC SUB-HEADINGS
NO.
Company Overview & • Company Profile<br/>• Product Portfolio<br/>• Manufacturing
1
Business Context Operations<br/>• Global Presence
SAP PP Implementation • Implementation Approach<br/>• Project Scope<br/>• Timeline &
2
Strategy Milestones<br/>• Success Criteria
Production Planning • Material Master Configuration<br/>• BOM (Bill of Materials)<br/>• Routing &
3
Master Data Work Centers<br/>• Production Versions
• Demand Planning<br/>• Sales & Operations Planning<br/>• Forecast
4 Demand Management
Management<br/>• Independent Requirements
Production Planning • MRP Configuration<br/>• Capacity Planning<br/>• Long-term Planning<br/>•
5
Methods Master Production Schedule
• Order Types Configuration<br/>• Order Creation Process<br/>• Order
6 Production Orders
Processing<br/>• Order Settlement
• Production Confirmation<br/>• Goods Movement<br/>• Quality
7 Shop Floor Control
Integration<br/>• Backflush Processing
• Capacity Requirements Planning<br/>• Capacity Evaluation<br/>• Capacity
8 Capacity Management
Leveling<br/>• Finite Scheduling
• Standard Costing<br/>• Cost Center Planning<br/>• Activity-Based
9 Product Costing
Costing<br/>• Variance Analysis
Quality Management • Quality Planning<br/>• Quality Inspection<br/>• Quality Certificates<br/>•
10
Integration Quality Notifications
Warehouse Management • Warehouse Processes<br/>• Inventory Management<br/>• Goods
11
Integration Receipt/Issue<br/>• Stock Transfers
Plant Maintenance • Equipment Management<br/>• Preventive Maintenance<br/>• Maintenance
12
Integration Orders<br/>• Maintenance Planning
• Batch Determination<br/>• Batch Classification<br/>• Batch
13 Batch Management
Genealogy<br/>• Shelf Life Management
SR
MAIN TOPIC SUB-HEADINGS
NO.
• Configurable Materials<br/>• Configuration Profiles<br/>• Variant
14 Variant Configuration
BOMs<br/>• Variant Routing
• Supplier Integration<br/>• Subcontracting<br/>• External Services<br/>•
15 Supply Chain Integration
Procurement Planning
• Standard Reports<br/>• Custom Reports<br/>• Dashboard
16 Reporting & Analytics
Configuration<br/>• KPI Monitoring
• Embedded Analytics<br/>• Fiori Applications<br/>• Real-time
17 S/4 HANA Specific Features
Processing<br/>• In-Memory Computing
Industry-Specific • Food & Beverage Processes<br/>• Regulatory Compliance<br/>• Traceability
18
Requirements Requirements<br/>• Packaging Management
• ERP Integration Points<br/>• Third-party Systems<br/>• Data
19 System Integration
Migration<br/>• Interface Management
• Unit Testing<br/>• Integration Testing<br/>• User Acceptance Testing<br/>•
20 Testing & Validation
Performance Testing
Training & Change • End User Training<br/>• Super User Training<br/>• Documentation<br/>•
21
Management Change Management Strategy
• Cutover Planning<br/>• Go-Live Activities<br/>• Post Go-Live Support<br/>•
22 Go-Live Support
Issue Resolution
• System Performance<br/>• Process Optimization<br/>• Database
23 Performance Optimization
Tuning<br/>• Monitoring Tools
• Role-Based Access<br/>• Authorization Objects<br/>• Security Policies<br/>•
24 Security & Authorization
Audit Trails
• Backup Strategy<br/>• Recovery Procedures<br/>• Disaster Recovery<br/>•
25 Backup & Recovery
Data Archiving

Detailed Knowledge Transfer Content

1. Company Overview & Business Context

Company Profile:

 Tata Consumer Products Limited is an integrated Food & Beverage company


 Formed from merger of Tata Chemicals consumer business and Tata Global Beverages (2020)
 2nd largest branded tea company globally
 Headquarters: Mumbai, Maharashtra, India

Product Portfolio:

 Tea (Tata Tea, Tetley)


 Coffee (Eight O'Clock Coffee, Tata Coffee Grand)
 Salt (Tata Salt)
 Spices, Pulses, Ready-to-cook/eat products
 Water, RTD beverages
 Breakfast cereals, snacks

Manufacturing Operations:

 Multi-location manufacturing facilities


 Global supply chain operations
 Plantation activities in India and Sri Lanka
 Processing and packaging facilities

Global Presence:

 Operations across Asia-Pacific, Europe, Middle East, Africa, and North America
 Revenue: ₹17,618 Crores
 Market Cap: ₹1,06,048 Crores

2. SAP PP Implementation Strategy

Implementation Approach:

 Phased implementation approach


 Business process reengineering
 Best practice adoption
 Change management focus

Project Scope:

 Production Planning and Control


 Demand Management
 Capacity Planning
 Shop Floor Control
 Quality Integration
 Cost Management

Timeline & Milestones:

 Phase 1: Blueprint and Design


 Phase 2: Development and Testing
 Phase 3: Training and Preparation
 Phase 4: Go-Live and Support

Success Criteria:

 Improved production efficiency


 Enhanced demand forecasting
 Better inventory management
 Reduced production costs
 Improved quality control

3. Production Planning Master Data

Material Master Configuration:

 FMCG-specific material types


 Procurement and production views
 Planning parameters
 Costing views

BOM (Bill of Materials):

 Multi-level BOMs for complex products


 Alternative BOMs for different scenarios
 Packaging BOMs
 Recipe management

Routing & Work Centers:

 Production routing definition


 Work center capacity planning
 Operation sequences
 Resource allocation

Production Versions:

 Different production methods


 Seasonal variations
 Plant-specific versions
 Validity periods

4. Demand Management

Demand Planning:

 Sales forecast integration


 Historical data analysis
 Seasonal demand patterns
 Market trend analysis

Sales & Operations Planning:

 S&OP process implementation


 Cross-functional planning
 Capacity vs. demand balancing
 Executive dashboards

Forecast Management:

 Statistical forecasting
 Collaborative planning
 Forecast accuracy monitoring
 Demand sensing

Independent Requirements:

 Master production schedule


 Safety stock planning
 Demand smoothing
 Planning horizons

5. Production Planning Methods

MRP Configuration:

 MRP type selection


 Lot sizing procedures
 Safety stock calculation
 Reorder point planning

Capacity Planning:

 Rough-cut capacity planning


 Detailed capacity planning
 Capacity requirements planning
 Bottleneck management

Long-term Planning:

 Strategic capacity planning


 Resource planning
 Investment planning
 Scenario planning

Master Production Schedule:

 MPS generation
 MPS maintenance
 Available-to-promise
 Capable-to-promise

6. Production Orders

Order Types Configuration:


 Standard production orders
 Process orders for batch production
 Repetitive manufacturing
 Kanban orders

Order Creation Process:

 Manual order creation


 Automatic order generation
 Order planning
 Order scheduling

Order Processing:

 Order release
 Material staging
 Production confirmation
 Order completion

Order Settlement:

 Cost collection
 Variance calculation
 Settlement rules
 Period-end closing

7. Shop Floor Control

Production Confirmation:

 Operation confirmation
 Milestone confirmation
 Backflush confirmation
 Time recording

Goods Movement:

 Component issue
 Finished goods receipt
 Scrap posting
 Rework processing

Quality Integration:

 Inspection lot creation


 Quality results recording
 Quality certificates
 Non-conformance handling

Backflush Processing:

 Automatic component consumption


 Backflush settings
 Phantom assemblies
 Co-product processing

8. Capacity Management

Capacity Requirements Planning:

 Available capacity calculation


 Required capacity calculation
 Capacity load analysis
 Capacity reports

Capacity Evaluation:

 Capacity vs. load comparison


 Overload analysis
 Underload analysis

 Capacity utilization

Capacity Leveling:

 Load distribution
 Resource optimization
 Shift planning
 Overtime planning

Finite Scheduling:

 Detailed scheduling
 Resource constraints
 Sequence optimization
 Schedule optimization

9. Product Costing

Standard Costing:

 Standard cost calculation


 Cost component structure
 Cost center allocation
 Activity-based costing

Cost Center Planning:

 Cost center hierarchy


 Activity planning
 Cost allocation
 Budget planning

Activity-Based Costing:

 Activity definition
 Cost driver analysis
 Activity allocation
 ABC reports

Variance Analysis:

 Price variance
 Quantity variance
 Efficiency variance
 Mix variance

10. Quality Management Integration


Quality Planning:

 Quality plans
 Inspection characteristics
 Sampling procedures
 Quality specifications

Quality Inspection:

 Inspection lot processing


 Results recording
 Decision making
 Certificate generation

Quality Certificates:

 Certificate profiles
 Certificate generation
 Certificate management
 Customer certificates

Quality Notifications:

 Problem notification
 Root cause analysis
 Corrective actions
 Preventive actions

Key Implementation Considerations for Tata Consumer Products

Industry-Specific Requirements:

 Food safety regulations compliance


 Batch tracking and traceability
 Shelf life management
 Packaging requirements
 Regulatory reporting
Multi-Plant Considerations:

 Standardized processes across locations


 Inter-plant transfers
 Centralized planning
 Local compliance requirements

Integration Points:

 Sales and Distribution


 Finance and Controlling
 Materials Management
 Quality Management
 Plant Maintenance

Performance Metrics:

 Overall Equipment Effectiveness (OEE)


 Production efficiency
 Quality metrics
 Cost reduction
 Inventory turnover

This knowledge transfer document provides a comprehensive framework for SAP PP S/4 HANA
implementation at Tata Consumer Products, covering all essential aspects from business context to
technical implementation details.