0633 Gamon

The document is a communication from Dynamic Projects Pvt. Ltd. to Mr. Prakash Phadke regarding the approval of drawings for the approach ramp plan and details of the Belghoria Expressway. It lists various drawing numbers and their revisions related to the construction of a 6-lane elevated connector in West Bengal. The letter concludes with an assurance of continued service and support from the sender.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
59 views2 pages

0633 Gamon

The document is a communication from Dynamic Projects Pvt. Ltd. to Mr. Prakash Phadke regarding the approval of drawings for the approach ramp plan and details of the Belghoria Expressway. It lists various drawing numbers and their revisions related to the construction of a 6-lane elevated connector in West Bengal. The letter concludes with an assurance of continued service and support from the sender.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Ref: DPPL/R&B/GAMMON/KALYANI EXPRESSWAY/0633 Date: 27/06/2025

To
Mr. Prakash Phadke
Design Director,
Gammon Engineers and Contractors Pvt Ltd.
Gammon House, Ver Savarkar Marg, P.O Box No. 9129
Prabhadevi, Mumbai- 400 025

Name of Work: Construction of proposed 6 lane elevated connector between Belghoria Expressway and Kalyani
Expressway including widening of Kalyani Expressway to 6 lanes from Nimta to Muragacha (Total
Length 4.565 km) (Phase-I) on EPC Mode in the district of North 24 Parganas in West Bengal.

Reference Email: Kalyani Project - Drawings of approach ramp of belghoria expressway by Email dated 25/06/2025.

Subject: Approval of the Drawings for Approach Ramp plan and Detail of Belghoria Expressway

Dear Sir,
We have received soft copy of the Drawings for approach ramp plan and details of belghoria expressway at by
Email dated 25/06/2025, for Safety Study.
Following Drawing has been checked and reviewed:

SL NO Drawing No Name of Drawing Rev No

PLAN AT ABAUTMENT FOR


1.0 SIS-037-PLAN-101 (SHEET 01 OF 01) GRADE SEPARATOR@CH: 3+580 R3
GROUND IMPORVEMENT DETAIL
2.0 SIS-037-GID-101 A (SHEET 01 OF 02) FOR SEPARATOR@CH: 3+580 R1
GROUND IMPORVEMENT DETAIL
3.0 SIS-037-GID-101 B (SHEET 02 OF 02) FOR SEPARATOR@CH: 3+580 R1
SECTION X-X CH: @ 35+680 FOR
4.0 SIS-037-SEC-102 (SHEET 01 OF 01) GRADE SEPARATOR@ CH: R1
35+580
LONGITUDINAL ELEVATOR FOR
5.0 SIS-037-ELV-103 (SHEET 01 OF 03) GRADE SEPARATOR@ CH: 3+580 R2
WALL-01 (AIRPORT END, LHS)
LONGITUDINAL ELEVATOR FOR
SIS-037-ELV-104 (SHEET 02 OF 03) GRADE SEPARATOR@ CH: 3+580 R2
6.0
WALL-01 (AIRPORT END, LHS)
LONGITUDINAL ELEVATOR FOR
7.0 SIS-037-ELV-105 (SHEET 03 OF 03) GRADE SEPARATOR@ CH: 3+580 R2
WALL-01 (AIRPORT END, LHS)
LONGITUDINAL ELEVATOR FOR
8.0 SIS-037-ELV-106 (SHEET 01 OF 02) GRADE SEPARATOR@ CH: 3+580 R2
WALL-02 (AIRPORT END, LHS)
LONGITUDINAL ELEVATOR FOR
9.0 SIS-037-ELV-107 (SHEET 02 OF 02) GRADE SEPARATOR@ CH: 3+580 R2
WALL-02 (AIRPORT END, LHS)
LONGITUDINAL ELEVATOR FOR
10.0 SIS-037-ELV-108 (SHEET 01 OF 02) GRADE SEPARATOR@ CH: 3+580 R1
WALL-03 (DAKSHINESHWAR END,
LHS)
LONGITUDINAL ELEVATOR FOR
SIS-037-ELV-109 (SHEET 02 OF 02) GRADE SEPARATOR@ CH: 3+580 R1
11.0
WALL-03 (DAKSHINESHWAR END,
LHS)
LONGITUDINAL ELEVATOR FOR
12.0 SIS-037-ELV-110 (SHEET 01 OF 02) GRADE SEPARATOR@ CH: 3+580 R1
WALL-04 (DAKSHINESHWAR END,
RHS)
LONGITUDINAL ELEVATOR FOR
SIS-037-ELV-111 (SHEET 02 OF 02) GRADE SEPARATOR@ CH: 3+580 R1
13.0
WALL-04 (DAKSHINESHWAR END,
RHS)
LONGITUDINAL ELEVATOR FOR
14.0 SIS-037-CW-112 (SHEET 01 OF 01) GRADE SEPARATOR@ CH: 3+580 R2
CROSS WALL 01 & 02
LONGITUDINAL ELEVATOR FOR
15.0 SIS-037-PCC-113 (SHEET 01 OF 01) GRADE SEPARATOR@ CH: 3+580 R2
WALL- 01 & 02 (AIRPORT END)
LONGITUDINAL ELEVATOR FOR
16.0 SIS-037-PCC-114 (SHEET 01 OF 01) GRADE SEPARATOR@ CH: 3+580 R1
WALL- 03 & 04 (DAKSHINESHWAR
END)
PANEL BOQ AND AREA BOQ FOR
17.0 SIS-037-BOQ-115 (SHEET 01 OF 01) GRADE SEPARATOR@ CH: 3+580 R2

Observation: No. Observation

Thanking You and assuring you our best service all the time.

Your truly,
Dynamic Projects Pvt. Ltd.

Mr. Kingshuk Basu


Safety Consultant