Detailed Work Schedule

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Project Name- Design, Engineering & Construction of Isolation & Burn ward at Haldia Subdivision Hospital and Cesarean

ward at Basulia Rural hospital, Mahisadal.


Name Of Client- INDIAN OIL CORPORATION LIMITED
Name of PMC- DYNAMIC PROJECTS PVT. LTD. CONTRACT NO- 27244387 DT. 25.09.2021
Name Of LSTK Contractor- M/S ANAND CONSTRUCTION WO NO.- 28166668 DT. 20.09.2022

DETAILED WORK SCHEDULE FOR CONSTRUCTION OF ISOLATION AND BURN WARD AT HALDIA SUBDIVISION HOSPITAL
DATE: 10-08-2023
DRAWING PLANNED
PLANNED COMPLITION
SL NO TITLE OF WORK DESCRIPTION OF WORK TOTAL DONE %DONE APPROVAL COMPLETION REMARKS
START DATE DATE
DATE DATE

1 FOUNDATION WORK Drawing Approval 100 100 100% 7-04-2023 Approved


Excavation 100 100 100% 18-04-2023 30-05-2023 31-05-2023 COMPLETED
Sand filling and soil testing 100 100 100% 20-04-2023 01-06-2023 02-06-2023 COMPLETED
Reinforcement binding and shuttering 100 100 100% 06-05-2023 03-07-2023 04-07-2023 COMPLETED
Casting 100 100 100% 19-05-2023 15-07-2023 04-07-2023 COMPLETED

2 COL UPTO PLINTH BEAM BOTT. Drawing Approval 100 100 100% 7-04-2023 Approved
Reinforcement binding and shuttering 100 100 100% 10-05-2023 01-07-2023 05-07-2023 COMPLETED WITH DELAY
Casting 100 100 100% 22-05-2023 04-07-2023 10-07-2023 COMPLETED WITH DELAY

3 LIFT PIT Drawing Approval 100 100 100% 27-06-2023


Base slab and tie beam Reinforcement 100 100 100% 28-06-2023 04-07-2023 04-07-2023
Core wall casting 100 25 25% 10-07-2023 15-01-2024 WIP

4 PLINTH BEAM Drawing Approval 100 100 100% 30-06-2023 Approved


Reinforcement binding ,shuttering and
100 100 100%
casting 07-07-2023 30-07-2023 10-08-2023 COMPLETED WITH DELAY
ONLY RAMP AND STAIR END PORTION
100 96 96%
Casting 01-07-2023 31-07-2023 REMAIN

5 RAMP AND STAIR Drawing Approval 100 50 50% 03-08-2023 Only Ramp Drawing Approved
Reinforcement binding and shuttering 100 0 0% 5-09-2023
Casting 100 0 0% 10-09-2023

COLUMN UPTO GROUND FLOOR 100 100 100% 07-04-2023


6 ROOF SLAB Drawing Approval Approved
Reinforcement binding and shuttering 100 0 0% 25-07-2023 09-09-2023 starter casting and stirrup binding not
Casting 100 0 0% 26-07-2023 11-09-2023 start yet

7 LINTEL AT GROUND FLOOR Drawing Approval 100 50 50% 06-04-2023 Approved(Architectural drawing)
Reinforcement binding and shuttering 100 0 0% 10-09-2023 25-09-2023
Casting 100 0 0% 12-09-2023 28-09-2023

8 GROUND FLOOR PCC Compaction & soil compaction checking 100 0 0% 06-07-2023 31-07-2023
Sand filling and compaction 100 0 0% 08-07-2023 10-08-2023 No action taken regarding these works till
Anti Termite Treatment 100 0 0% 11-08-2023 14-08-2023 now
PCC casting 100 0 0% 15-08-2023 05-09-2023
Project Name- Design, Engineering & Construction of Isolation & Burn ward at Haldia Subdivision Hospital and Cesarean ward at Basulia Rural hospital, Mahisadal.
Name Of Client- INDIAN OIL CORPORATION LIMITED
Name of PMC- DYNAMIC PROJECTS PVT. LTD. CONTRACT NO- 27244387 DT. 25.09.2021
Name Of LSTK Contractor- M/S ANAND CONSTRUCTION WO NO.- 28166668 DT. 20.09.2022

DETAILED WORK SCHEDULE FOR CONSTRUCTION OF ISOLATION AND BURN WARD AT HALDIA SUBDIVISION HOSPITAL
DATE: 10-08-2023
DRAWING PLANNED
PLANNED COMPLITION
SL NO TITLE OF WORK DESCRIPTION OF WORK TOTAL DONE %DONE APPROVAL COMPLETION REMARKS
START DATE DATE
DATE DATE

9 1ST FLOOR SLAB AND SLAB BEAM Drawing Approval 100 0 0% Drawing submitted on 3-07-2023 ,not
Reinforcement binding and shuttering 100 0 0% 28-08-2023 28-09-2023 approved yet
Roof slab Casting 100 0 0% 28-09-2023 30-09-2023

10 ELECTRICAL WORK (CONCEAL ) Drawing Approval 100 0 0%


Laying and pointing in Roof 100 0 0% 15-09-2023 Till now not decided wheather conceal or
Electrical Wireing at ground floor 100 0 0% surface by contractor and no SLD drawing
Electrical Wireing at 1st floor 100 0 0% and documents submitted yet

11 GROUND FLOOR BRICK WORK Drawing Approval 100 0 0% 06-04-2023 Approved(Architectural drawing)
Brick work and plastering 100 0 0% 15-11-2023 31-12-2023
100 0 0%
COLUMN UPTO 1ST FLOOR ROOF
100 0 0%
12 SLAB Reinforcement binding and shuttering 01-10-2023 07-11-2023
RCC casting 100 0 0% 03-10-2023 07-11-2023

13 2ND FLOOR SLAB AND SLAB BEAM Drawing Approval 100 50 50% 09-08-2023 Approved(only slab beam(LEV. +8100)
Reinforcement binding and shuttering 100 0 0% 01-11-2023 30-11-2023
RCC casting 100 0 0% 01-12-2023 03-12-2023

14 1ST FLOOR BRICK WORK Drawing Approval 100 100 100% 06-04-2023 Approved(Architectural drawing)
Brick work and plastering 100 0 0% 01-01-2024 15-02-2024

15 COLUMN UPTO MUMTY SLAB Reinforcement binding and shuttering 100 0 0% 07-12-2023 31-12-2023
RCC casting 100 0 0% 07-12-2023 31-12-2023

16 MUMTY SLAB Drawing Approval 100 100 100% 07-08-2023 Approved


Reinforcement binding and shuttering 100 0 0% 01-01-2024 15-01-2024
RCC casting 100 0 0% 01-01-2024 15-01-2024
Project Name- Design, Engineering & Construction of Isolation & Burn ward at Haldia Subdivision Hospital and Cesarean ward at Basulia Rural hospital, Mahisadal.
Name Of Client- INDIAN OIL CORPORATION LIMITED
Name of PMC- DYNAMIC PROJECTS PVT. LTD. CONTRACT NO- 27244387 DT. 25.09.2021
Name Of LSTK Contractor- M/S ANAND CONSTRUCTION WO NO.- 28166668 DT. 20.09.2022

DETAILED WORK SCHEDULE FOR CONSTRUCTION OF ISOLATION AND BURN WARD AT HALDIA SUBDIVISION HOSPITAL
DATE: 10-08-2023
DRAWING PLANNED
PLANNED COMPLITION
SL NO TITLE OF WORK DESCRIPTION OF WORK TOTAL DONE %DONE APPROVAL COMPLETION REMARKS
START DATE DATE
DATE DATE
17 DOORS AND WINDOWS WORK Drawing Approval(Details and section) 100 0 0% 06-04-2023 Approved(Architectural drawing)
Supply, fix and finishing 100 0 0% 23-11-2023 05-05-2024

Septic Tank drawing layout and section


100 0 0%
18 SANITARY AND PLUMBING WORK Approval Drawing not submitted
100 0 0%
Sanitary and plumbing Drawing Approval Drawing not submitted
Construction,Supply, fixing 100 0 0% 15-12-2023 01-04-2024

19 DRAINAGE SYSTEM Layout and section drawing Approval 100 0 0% Drawing not submitted
Costruction of Strom Drainage 100 0 0% 01-01-2024 01-02-2024
Costruction of Sewage Drainage 100 0 0% 01-01-2024 01-02-2024

TILES WORK OF GROUND FLOOR AND Procurement for Approved vendor 100 0 0% 05-01-2024 30-04-2024
20
FIRST FLOOR Fixing and finishing 100 0 0% 05-01-2024 30-04-2024

INSULATION AND FALSE CELLING Drawing Approval 100 0 0% Drawing not submitted
21
FIXING Supply, fixing 100 0 0% 01-03-2024 31-05-2024

22 SUPPLY AND INSTALATION OF AC Layout Drawing Approval 100 0 0% Drawing not submitted
Installation of AC 100 0 0% 01-06-2024 30-06-2024
Project Name- Design, Engineering & Construction of Isolation & Burn ward at Haldia Subdivision Hospital and Cesarean ward at Basulia Rural hospital, Mahisadal.
Name Of Client- INDIAN OIL CORPORATION LIMITED
Name of PMC- DYNAMIC PROJECTS PVT. LTD. CONTRACT NO- 27244387 DT. 25.09.2021
Name Of LSTK Contractor- M/S ANAND CONSTRUCTION WO NO.- 28166668 DT. 20.09.2022

DETAILED WORK SCHEDULE FOR CONSTRUCTION OF ISOLATION AND BURN WARD AT HALDIA SUBDIVISION HOSPITAL
DATE: 10-08-2023
DRAWING PLANNED
PLANNED COMPLITION
SL NO TITLE OF WORK DESCRIPTION OF WORK TOTAL DONE %DONE APPROVAL COMPLETION REMARKS
START DATE DATE
DATE DATE
LIFT specification book from approved
23 vendor and load calculation for lift 100 0 0%
INSTALATION OF LIFT documents submit 07-07-2023 31-08-2023 Drawing and documents not submitted
100 0 0%
Procurement of LIFT from approved vendor 30-09-2023 01-06-2024
Installation of lift and electrical work 100 0 0% 01-06-2024 07-07-2024

Fire fighting system layout Drawing


100 0 0%
24 SPRINKLAR INSTALATION FOR FIRE Approval 31-08-2023
FIGHTING Supply & Installation 100 0 0% 01-01-2024 01-07-2024
Plan and long lead item schedule not
100 0 0% submitted till now from LSTK
25 INSTALATION OF D.G Procurement of D.G from approved vendor 31-12-2023 29-04-2024
contractor about these work,so we fix
Civil foundation and other work for 100 0 0% 01-04-2024 29-04-2024
installation 100 0 0% a start date. The detailed planning
Installation of D.G and electrical work 100 0 0% 30-04-2024 30-06-2024 should be submitted by contractor of
these works before given initial date.
26 INSTALATION OF TRANSFORMER Licenceing from State Electricity Board 100 0 0% 31-12-2023 30-04-2024
Procurement of Transformer from approved
100 0 0%
vendor 31-12-2023 29-04-2024
Civil foundation and other work for 01-04-2024 29-04-2024
100 0 0%
installation
Installation of Transformer 100 0 0% 30-04-2024 30-06-2024
others electrical work 100 0 0% 30-04-2024 30-06-2024

Note:
Red date marking indicates delay
This is prepare from site handover date(17.02.2023) to 17 months.
Prepared On the basis of LSTK Contractor Bar chart Schedule which submitted July 5,2023

SUJOY DAS KAUSHIK GHOSH


Project Management Specialist Civil Engineer
Dynamic Projects Pvt. Ltd. Dynamic Projects Pvt. Ltd.