SHARP THERMAL ENGINEERS PVT. LTD.
Revston Dute
4M Change Set up &In-process
Date & Shit Part Narme Part No Inspection Report
Customer
Operation Name 4M Change / Abnormality Detail 4M Charge / Abnormality Date
SlT1202|1a nformation By
|L tousin9 CDmMAtoo
S. N. Parameters
00 MICL
Set up Inspection
Forming Popmir
P doe
teo)
1/07|25
Specification Checking Method Inprocess Inspection Last Part Inspection
Time:
339 am Time:
Time:/2 30 P. Time:
6-6 o| 2-oo P Time:
660 6 62
2 Dim 66 2 66 S
BAPtorancefree froM
visual o
Judgement (os/ NG):
Operator Name &Slgn Suni) Suni) Suní Suni
SVN SUNIC SUNi
Quallty Supervisor/ Engineer Name &Slgn Data Datta Datta,
Rule:
1)Start Production onty after verihetion of
par Datha D
the
2) AW the mchine pararter should be et tup checksheet by Production Supervisor/ Lnneer. emek
in e spectied vlue during checksheet
wil correa the sbnormality impediataly and verification if not n specified limit, sat the parameler as par adjustment Instructlon.
B) Production Supervsorl
4) FAECUENCY:1)AT TE START EVEAY SMEY 2)100 REAK DOWN/ NEMOVED 3) allow operator to run the machine.
MACHINE MNEAK DOWN/ABNORMAL CONDITION
SHARP THERMAL ENGINEERS PVT.LTD. Document No. STEPL/F/MR/30
Revision No.
4M Change 100% Inspection In-house
Rejection Record Revision Date. 03.09.2021
QUANTITY
REASONS FOR NOT OK PARTS
Date Part Name / No.Operation Name Inspector
Name
Qty
Checked
OK
OK
Not Rework Scrap CRACK Wrinkle Scrathes O/S
O.D.
Note:
Prepared By -
Data Approved By :-Punit, k. Updated On:-11.04.2023
Format Na. sTEPU/MR/29
SHARP THERMAL ENGINEERS PVT. LTD. Riston Date
4M Change Set up & In-process Inspection Report Revislorn No.
Date & Shit Part Name Part No. Customer Snformation By
Operation Name 4M Change/Abnormality Detail 4M Change / Abnormality Date
|T|202s Mond
Houi
1 CDmmA000 Piercing Prcitoo1 {26
Set up Inspection Inprocess Inspection Last Part Inspection
S. N. Parameters Specification Checking Method
230 P m Time: (0 Pm
Time:
(orooAy Time: Time:
|2r 30 m Time:
Dia |4832o-) 320
30 34
Dim Drc
|3 Dim
ApaMeetDent visuel aJ< ok
Judgement (OK/ NG):
o
Operator Name &Sign umesh
umeshGae. umesh
unes umess
Ruke
Quality Supervisor/ Engineer Name &Sign
l) Start Production onty ater verilicstion d the setup checksheet by Producrion
Supevisor/ Engineer.
12) All the machine parameters should be set in s specified ve durtng checksheet veritication if not in specified limit, set the
Data Dotta
Remark:
Dats
roduction Supervisorl Engineer wll correct the sbnormality nnediately and iow operator to run parameter as per adjustment instruction.
4) FREQUENCY:1)AT THE START EVERY SHET 2)100L MEAK DOWN/ KEMoVED ) MACHINE BREAK the machine.
DOWN/ABNORMAL CONDITION
SHARP THERMAL ENGINEERS PVT.LTD. Document No. STEPL/F/MR/30
Revision No.
4M Change 100% Inspection In-house Rejection
QUANTITY
Record Revision Date. 03.09.2021
REASONS FOR NOT OK PARTS
Qty
Checked
Date Part Name /No.Operation Name Inspector
Name OK
OK
Not Rework Scrap CRACK Wrinkle
løH2S DmmA PerciogShital S0o60O.
Note:
|Prepared By :
Datto Approved By :-Punit k. Updated On:-11.04.2023
SHARP THERMAL ENGINEERS PVT. LTD. Formet No. STEPUEI/MR79
edion Oete 0309.1021
Date &Shift
4M Change Set up & In-process Inspection Report Revtston No.
Part Name Part No. Customer
Operation Name 4M Changge / Abnormality Detail 4M Change / Abnormality Date Irformation By
S1|202 Teímirt Trimi too Ho7|202
S. N. Parameters Specification Set up Inspection Inprocess Inspection
Checking Method Last Part Inspection
Time:
Lo30 A mTime: /230 RrTime: 200 pM Time: Time:
Length M6 o3
J47 62 147:60 |14Tr62
2-idti 87:6102 34: 65
3 Dim 87r65 87-60
12:0 |26 12 12 41
Dim DC &r65 70
19.4103
Pim 13r 60
|)APnEnecfrom
13: 6o
burr enriSua
Judgement (OK/ NG):
o
Operator Name &Sign 4Kha
A1
Quality Supervisor/ Engineer Name & Sign Dota DattaB l D a t a Datta,
Rule:
1) Start Production only after
verlfication of the setup chedsheet by Production Remarks:
BL Produc machine parameters shoula be set in a specified yalue during checkshee
e Supervisor/ Engineer.
etion if not in specified limit, set the parameter as per adjustment instructian.
Supervisor/ Engineer will corect the abnornaality
4) FREQUENCY:1)AT THE START EVERY SHIFT imnediatey and allowWoperator
o to run the machine.
2)T0OL BREAK DOWwN/ REMOVED 3) MACHINE BREAK DOWNJABNORMAL CONDITION
epBy
ared: ote:
Date
Part
Dat Name /
No.
Trin g Operation
Name 4M
SO50o.rei Name Inspector
Checked Qty
Change SHARP
OK
10 %
Not OK
Rework
TQUANTIY Inspection HERMAL
Scrap
CRACK
In-house
Wrinkle
Aproved
By
Scratches
:-Punit
k.
ERejction NGI RS
O.D. O/S
O.D. U/S
L.D. O/S
PRecord VT.LD
L.D. U/S
REFOARSON
CRACK
NOT
Dent OK 03.RD9eav2ti0s1.on ReNvoi.s n STEPLD/FoNMcuRm.30ent
Bur
CORIN
PARTS
AA
On:U-1p.0d4a2te3
OTHER
INSPECTOR BY
VERIFIED BY