4M Change Inspection Record

The document outlines the inspection procedures and parameters for 4M Change setup and in-process inspections at Sharp Thermal Engineers Pvt. Ltd. It includes details on inspection reports, rejection records, and rules for starting production after verification of machine parameters. The document also specifies the frequency of inspections and the responsibilities of operators and supervisors during the process.

Uploaded by

dattabais100
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views6 pages

4M Change Inspection Record

The document outlines the inspection procedures and parameters for 4M Change setup and in-process inspections at Sharp Thermal Engineers Pvt. Ltd. It includes details on inspection reports, rejection records, and rules for starting production after verification of machine parameters. The document also specifies the frequency of inspections and the responsibilities of operators and supervisors during the process.

Uploaded by

dattabais100
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

SHARP THERMAL ENGINEERS PVT. LTD.

Revston Dute
4M Change Set up &In-process
Date & Shit Part Narme Part No Inspection Report
Customer
Operation Name 4M Change / Abnormality Detail 4M Charge / Abnormality Date
SlT1202|1a nformation By
|L tousin9 CDmMAtoo
S. N. Parameters
00 MICL
Set up Inspection
Forming Popmir
P doe
teo)
1/07|25
Specification Checking Method Inprocess Inspection Last Part Inspection
Time:
339 am Time:
Time:/2 30 P. Time:
6-6 o| 2-oo P Time:
660 6 62
2 Dim 66 2 66 S
BAPtorancefree froM
visual o

Judgement (os/ NG):


Operator Name &Slgn Suni) Suni) Suní Suni
SVN SUNIC SUNi
Quallty Supervisor/ Engineer Name &Slgn Data Datta Datta,
Rule:
1)Start Production onty after verihetion of
par Datha D
the
2) AW the mchine pararter should be et tup checksheet by Production Supervisor/ Lnneer. emek
in e spectied vlue during checksheet
wil correa the sbnormality impediataly and verification if not n specified limit, sat the parameler as par adjustment Instructlon.
B) Production Supervsorl
4) FAECUENCY:1)AT TE START EVEAY SMEY 2)100 REAK DOWN/ NEMOVED 3) allow operator to run the machine.
MACHINE MNEAK DOWN/ABNORMAL CONDITION
SHARP THERMAL ENGINEERS PVT.LTD. Document No. STEPL/F/MR/30
Revision No.
4M Change 100% Inspection In-house
Rejection Record Revision Date. 03.09.2021
QUANTITY
REASONS FOR NOT OK PARTS

Date Part Name / No.Operation Name Inspector


Name
Qty
Checked
OK
OK
Not Rework Scrap CRACK Wrinkle Scrathes O/S
O.D.

Note:

Prepared By -
Data Approved By :-Punit, k. Updated On:-11.04.2023
Format Na. sTEPU/MR/29
SHARP THERMAL ENGINEERS PVT. LTD. Riston Date

4M Change Set up & In-process Inspection Report Revislorn No.

Date & Shit Part Name Part No. Customer Snformation By


Operation Name 4M Change/Abnormality Detail 4M Change / Abnormality Date

|T|202s Mond
Houi
1 CDmmA000 Piercing Prcitoo1 {26
Set up Inspection Inprocess Inspection Last Part Inspection
S. N. Parameters Specification Checking Method

230 P m Time: (0 Pm
Time:
(orooAy Time: Time:
|2r 30 m Time:

Dia |4832o-) 320


30 34
Dim Drc
|3 Dim
ApaMeetDent visuel aJ< ok

Judgement (OK/ NG):


o
Operator Name &Sign umesh
umeshGae. umesh
unes umess

Ruke
Quality Supervisor/ Engineer Name &Sign

l) Start Production onty ater verilicstion d the setup checksheet by Producrion


Supevisor/ Engineer.
12) All the machine parameters should be set in s specified ve durtng checksheet veritication if not in specified limit, set the
Data Dotta
Remark:
Dats
roduction Supervisorl Engineer wll correct the sbnormality nnediately and iow operator to run parameter as per adjustment instruction.
4) FREQUENCY:1)AT THE START EVERY SHET 2)100L MEAK DOWN/ KEMoVED ) MACHINE BREAK the machine.
DOWN/ABNORMAL CONDITION
SHARP THERMAL ENGINEERS PVT.LTD. Document No. STEPL/F/MR/30
Revision No.
4M Change 100% Inspection In-house Rejection
QUANTITY
Record Revision Date. 03.09.2021
REASONS FOR NOT OK PARTS
Qty
Checked
Date Part Name /No.Operation Name Inspector
Name OK
OK
Not Rework Scrap CRACK Wrinkle

løH2S DmmA PerciogShital S0o60O.

Note:

|Prepared By :
Datto Approved By :-Punit k. Updated On:-11.04.2023
SHARP THERMAL ENGINEERS PVT. LTD. Formet No. STEPUEI/MR79

edion Oete 0309.1021

Date &Shift
4M Change Set up & In-process Inspection Report Revtston No.
Part Name Part No. Customer
Operation Name 4M Changge / Abnormality Detail 4M Change / Abnormality Date Irformation By

S1|202 Teímirt Trimi too Ho7|202


S. N. Parameters Specification Set up Inspection Inprocess Inspection
Checking Method Last Part Inspection
Time:
Lo30 A mTime: /230 RrTime: 200 pM Time: Time:

Length M6 o3
J47 62 147:60 |14Tr62
2-idti 87:6102 34: 65
3 Dim 87r65 87-60
12:0 |26 12 12 41
Dim DC &r65 70

19.4103
Pim 13r 60
|)APnEnecfrom
13: 6o
burr enriSua

Judgement (OK/ NG):


o
Operator Name &Sign 4Kha
A1
Quality Supervisor/ Engineer Name & Sign Dota DattaB l D a t a Datta,
Rule:
1) Start Production only after
verlfication of the setup chedsheet by Production Remarks:
BL Produc machine parameters shoula be set in a specified yalue during checkshee
e Supervisor/ Engineer.
etion if not in specified limit, set the parameter as per adjustment instructian.
Supervisor/ Engineer will corect the abnornaality
4) FREQUENCY:1)AT THE START EVERY SHIFT imnediatey and allowWoperator
o to run the machine.
2)T0OL BREAK DOWwN/ REMOVED 3) MACHINE BREAK DOWNJABNORMAL CONDITION
epBy
ared: ote:
Date
Part
Dat Name /

No.

Trin g Operation
Name 4M
SO50o.rei Name Inspector
Checked Qty
Change SHARP
OK
10 %
Not OK

Rework
TQUANTIY Inspection HERMAL
Scrap

CRACK
In-house
Wrinkle
Aproved
By
Scratches
:-Punit
k.
ERejction NGI RS
O.D. O/S

O.D. U/S

L.D. O/S
PRecord VT.LD
L.D. U/S
REFOARSON
CRACK
NOT
Dent OK 03.RD9eav2ti0s1.on ReNvoi.s n STEPLD/FoNMcuRm.30ent
Bur
CORIN
PARTS
AA
On:U-1p.0d4a2te3
OTHER

INSPECTOR BY

VERIFIED BY