DOHA AL WAAB MALL
Daily Checklist for Excavation
Date:
ITEM 1 2 3 Any crack on the excavation? Any change of the type of soil? Any loose soil at the edge of the excavation? Any stock pile of loose soil near at the the edge of the excavation? Any stock pile of loose soil at the excavation? Any other areas of excavation have barricades? Is theno barricades not place at least 2m away at the edge of excavation? any ground water present on the excavation? Any dewatering activities on the excavation?
LOCATION
COMMENTS
4 5 6 7 8 9
Any leakage of dewatering hose 10 on the excavation? Any electrical connections on the 11 excavation? 12 Are ramps needed? 13 Are access ladders needed? Any activities above the 14 underground services? 15 Are nets required? COMMENTS:
Inspected by:
Noted by:
Approved by:
Safety Officer
Safety Engineer
Elias S. Inaty HSSE Manager