Document Number
NERIN NRN-CIV-FEN-CL-005
Revision Number / Date
Quality Management System 00 / 16 July 2022
Page Number
Fencing Checklist Page 1 of 1
Client: Project:
Main Contractor: Project No.:
Sub-Contractor: Drawing No:
Scope: Specification:
CHAINAGE: TO
DESCRIPTION CONTRACTOR NERIN
CONCESSION WITH THE LAND OWNER RECEIVED: YES NO
CORRECT DRAWING REVISION USED
FENCING MATERIAL – PRE-APPROVED
CLEARING FENCE LINE
SURVEY / CHECK LINE
HOLE EXCAVATION – DIMENSIONS AS PER DRAWING
STRAINING POSTS: AS PER DRAWING
STAY AND ANCHOR: AS PER DRAWING
STANDARDS: SPACING, BINDED
DROPPERS: SPACING, BINDED AS PER SPECIFICATION
STRAINING WIRE TENSIONED
MESH: STRETCHED TIGHT, JOINTS
MESH JOINTS ACCEPTABLE
ERECTING GATES AS PER DRAWINGS
COMPLETE FENCING: PLUMB,TAUT,TRUE LINE AND LEVEL
PAINTING: COLD GALVANIZED, BRUSHED, CHROME ALUMINIUM
COMMENTS
Approval
Contractor Supervisor Contractor QC Inspector NERIN Supervisor
Name:
Surname:
Sign:
Date: