0% found this document useful (0 votes)
94 views4 pages

Important Notes: Important Notes:: Department Design

This document contains important notes regarding crane operations and tonnage capacities over 21 periods labeled 1' through 21'. It lists tonnage amounts ranging from 7,500 to 30,000 metric tons for each period. It also notes crane type used and tonnage capacities for sections A through K. The overall document provides scheduling and capacity details for multiple cranes and periods of operation.

Uploaded by

solquiha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
94 views4 pages

Important Notes: Important Notes:: Department Design

This document contains important notes regarding crane operations and tonnage capacities over 21 periods labeled 1' through 21'. It lists tonnage amounts ranging from 7,500 to 30,000 metric tons for each period. It also notes crane type used and tonnage capacities for sections A through K. The overall document provides scheduling and capacity details for multiple cranes and periods of operation.

Uploaded by

solquiha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

IMPORTANT NOTES:

1' 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21'
150000

7500 7500 7500 7500 7500 7500 7500 7500 7500 7500 7500 7500 7500 7500 7500 7500 7500 7500 7500 7500

K'

6000
J
6000

6000
20.0 M.T

20.0 M.T
30.0 M.T

30.0 M.T

10.0 M.T

10.0 M.T
Crane-D

Crane-D

Crane-D

Crane-D

Crane-D

Crane-D
I
6000

6000
H
6000

6000
G
6000

6000
60000
F
6000

6000
E
6000

6000
30.0 M.T

30.0 M.T

20.0 M.T

20.0 M.T

10.0 M.T
Crane-D

Crane-D

Crane-D

Crane-D

Crane-D

Crane-D
10 M.T
D
6000

6000
C
6000

6000
B

6000
A'

7500 7500 7500 7500 7500 7500 7500 7500 7500 7500 7500 7500 7500 7500 7500 7500 7500 7500 7500 7500

150000
00 8.12.15 ISSUED FOR APPROVAL N.T S.M S.M

REV.NO. DATE DESCRIPTION DRN CHK DSN

Building 02 Ground Floor plan

DESIGN
DEPARTMENT
PROJECT NAME : WORKSHOP HDVL
CUSTOMER : MESFIN INDUSTRIAL ENGINEERING PLC
JOBSITE LOCATION : ELLALA
DRAWING TITLE : DRAWING NO.

Ground Floor Plan MIE-04


IMPORTANT NOTES:

Special Double sliding doors

16000
8000
6000
60000
Front elevation plan

A' B C D E F G H I G K'

1800

16000
30000 30000
00 8.12.15 ISSUED FOR APPROVAL N.T S.M S.M

REV.NO. DATE DESCRIPTION DRN CHK DSN


Cross section plan

Building 02 DESIGN
DEPARTMENT
PROJECT NAME : WORKSHOP HDVL
CUSTOMER : MESFIN INDUSTRIAL ENGINEERING PLC
JOBSITE LOCATION : ELLALA
DRAWING TITLE : DRAWING NO.

Front & section view MIE-04


IMPORTANT NOTES:

21' 1'

6000
7500 7500 7500 7500 7500 7500 7500 7500 7500 7500 7500 7500 7500 7500 7500 7500 7500 7500 7500 7500

150000

Building 02 Right side elevation plan

00 8.12.15 ISSUED FOR APPROVAL N.T S.M S.M

REV.NO. DATE DESCRIPTION DRN CHK DSN

DESIGN
DEPARTMENT
PROJECT NAME : WORKSHOP HDVL
CUSTOMER : MESFIN INDUSTRIAL ENGINEERING PLC
JOBSITE LOCATION : ELLALA
DRAWING TITLE : DRAWING NO.

Right side view MIE-04


IMPORTANT NOTES:

1' 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21'

150000

K'
Sky light

G
60000

A'

00 8.12.15 ISSUED FOR APPROVAL N.T S.M S.M

REV.NO. DATE DESCRIPTION DRN CHK DSN

Building 02 Roof sheeting plan


DESIGN
DEPARTMENT
PROJECT NAME : WORKSHOP HDVL
CUSTOMER : MESFIN INDUSTRIAL ENGINEERING PLC
JOBSITE LOCATION : ELLALA
DRAWING TITLE : DRAWING NO.

Roof sheeting MIE-04

You might also like