Certificate 1

The document is a consent order from the Tamil Nadu Pollution Control Board granting M/s. SPR Construction Private Limited consent to establish a construction project comprising multi-storeyed buildings, residential buildings, parking areas, a school building and other facilities with a total built up area of 464022 square meters. The consent is valid until March 31, 2022 and allows for the operation of multiple diesel generator sets between 625-2000 KVA capacity with stack heights of 27-130 meters and acoustic enclosures as pollution control measures. The consent is subject to general and special conditions regarding emission sources, product details and requiring fresh consent for any changes.

Uploaded by

parikshtih
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
122 views6 pages

Certificate 1

The document is a consent order from the Tamil Nadu Pollution Control Board granting M/s. SPR Construction Private Limited consent to establish a construction project comprising multi-storeyed buildings, residential buildings, parking areas, a school building and other facilities with a total built up area of 464022 square meters. The consent is valid until March 31, 2022 and allows for the operation of multiple diesel generator sets between 625-2000 KVA capacity with stack heights of 27-130 meters and acoustic enclosures as pollution control measures. The consent is subject to general and special conditions regarding emission sources, product details and requiring fresh consent for any changes.

Uploaded by

parikshtih
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

CONSENT ORDER NO. 1701210493483 DATED: 22/12/2017.

PROCEEDINGS NO.T2/TNPCB/F.1362CHN/RL/CHN/A/2017 DATED: 22/12/2017

__________________________________________________________________
SUB: TNPC Board-Consent for Establishment-M/s. SPR CONSTRUCTION PRIVATE LIMITED , S.F.
No. RS No : 218/1, 2, 219/1, 2, 3, 4, 5, 6, 220/2, Block 11 and RS No : 221/2, 222/1, 2, Block 12,
PERAMBUR PART 1 village, Perambur Taluk and Chennai District - for the establishment or take
steps to establish the industry under Section 21 of the Air(Prevention and control of
Pollution)Act,1981, as amended in 1987(Central Act. 14 of 1981)-Issued -Reg.

REF: 1. Unit's Application No. 10493483 for CTE dated 27.09.2017


2. DEE's IR.No : F.1362CHN/RL/DEE/CHN/2017 dated 08/11/2017
3. Minutes of the Technical Sub-Committee Meeting Item No. 160-03 dated 13.12.2017

Consent to establish or take steps to establish is hereby granted under Section 21 of the Air (Prevention and control of Pollution)
Act,1981, as amended in 1987 and the Rules and Orders made there under to

The Managing Director,


M/s . SPR CONSTRUCTION PRIVATE LIMITED
S.F No.RS No : 218/1, 2, 219/1, 2, 3, 4, 5, 6, 220/2, Block 11 and RS No : 221/2, 222/1, 2, Block 12,
PERAMBUR PART 1 Village,
Perambur Taluk,
Chennai District.
Authorizing occupier to establish or take steps to establish the industry in the site mentioned below:
S.F No. RS No : 218/1, 2, 219/1, 2, 3, 4, 5, 6, 220/2, Block 11 and RS No : 221/2, 222/1, 2, Block 12,
PERAMBUR PART 1 Village,
Perambur Taluk,
Chennai District.
This Consent to establish is valid upto March 31, 2022, or till the industry obtains consent to operate under Section 21 of the Air
(Prevention and control of Pollution) Act, 1981, as amended in 1987 whichever is earlier subject to special and general conditions
enclosed.

S. CHARLES
Digitally signed by S. CHARLES RODRIGUEZ
DN: c=IN, o=TAMILNADU POLLUTION CONTROL BOARD,
ou=ENGINEERING DEPARTMENT, postalCode=600032,
st=Tamil Nadu,

RODRIGUEZ 2.5.4.20=59bfdaf6e51682ab79962b88a2fc2762c95680b297
1b84d2f6975a59ad6c315a, cn=S. CHARLES RODRIGUEZ
Date: 2017.12.23 10:56:20 +05'30'

For Member Secretary,


Tamil Nadu Pollution Control Board,
Chennai

To
The Managing Director,
M/s.SPR CONSTRUCTION PRIVATE LIMITED,
M/s. SPR Construction Private Limited, Sapna Trade Centre, 12th Floor, Old No: 109, New No: 135, Poonamallee High Road,
Chennai,
Pin: 600084

Copy to:
1.The Commissioner, CHENNAI-Corporation, Perambur Taluk, Chennai District .
2. The District Environmental Engineer, Tamil Nadu Pollution Control Board, CHENNAI.
3. The JCEE-Monitoring, Tamil Nadu Pollution Control Board, Chennai.
4. File
-----------

1
2
SPECIAL CONDITIONS

1. This consent to establish is valid for establishing the facility for the manufacture of products/
byproducts (Col. 2) at the rate (Col 3) mentioned below. Any change in the product/byproduct and its
quantity has to be brought to the notice of the Board and fresh consent has to be obtained.

Sl. Description Quantity Unit


No.
Product Details
1. Construction of Multi-Storeyed Buildings 259612 Sq.m
comprising of commercial building; 3
Basements Floors + Ground Floor + 4 Floors
(anchor and shops) + 5th Floor (Part) with 11
Cinema Theatres;
2. Residential building: Combined Basement 37678 Sq.m
Floor for Block-2 and Block 3; Combined Stilt
Floor parking for Blocks 1 to 3 with 2 level
parking;
3. Combined First floor parking for Block 1 to 3 34961 Sq.m
with 3 level parking; comprising of Block -1: 36
floors (2nd floor to 37 floor) Residential – 216
dwelling units;
4. Block -2: 36 floors (2nd floor to 37th floor) 40044 Sq.m
Residential – 288 dwelling units;
5. Block-3: 45 floors (2nd floor to 46th floor) 50655 Sq.m
Residential – 180 dwelling units and
6. Block-4 (LIG): Stilt + 24 floors Residential – 14941 Sq.m
264 dwelling units – Totally 948 Dwelling units;
7. School building: Ground floor + 2 floors 26131 Sq.m
8. Total built up area 464022 Sq.m
By-Product Details
1. Nil 0 -
Intermediate Product Details
1. Nil 0 -
2. This consent to establish is valid for establishing the facility with the below mentioned emission/noise
sources along with the control measures and/or stack .Any change in the emission source/control
measures/change in stack height has to be brought to the notice of the Board and fresh consent has to
be obtained if necessary.

3
I Point source emission with stack :
Stack Point Emission Source Air pollution Stack height Gaseous Discharge
No. Control measures from Ground in Nm3/hr
Level in m
1 DG set of 2000 KVA Acoustic 27 -
capacity enclosures with
stack
2 DG set of 2000 KVA Acoustic 27 -
capacity enclosures with
stack
3 DG set of 2000 KVA Acoustic 27 -
capacity enclosures with
stack
4 DG set of 2000 KVA Acoustic 27 -
capacity enclosures with
stack
5 DG set of 2000 KVA Acoustic 27 -
capacity enclosures with
stack
6 DG set of 2000 KVA Acoustic 27 -
capacity enclosures with
stack
7 DG set of 2000 KVA Acoustic 27 -
capacity enclosures with
stack
8 DG set of 1000 KVA Acoustic 27 -
capacity enclosures with
stack
9 DG set of 1000 KVA Acoustic 27 -
capacity enclosures with
stack
10 DG set of 1000 KVA Acoustic 27 -
capacity enclosures with
stack
11 DG set of 1000 KVA Acoustic 27 -
capacity enclosures with
stack
12 DG set of 1000 KVA Acoustic 27 -
capacity enclosures with
stack
13 DG set of 750 KVA capacity Acoustic 27 -
enclosures with
stack
14 DG set of 750 KVA capacity Acoustic 27 -
enclosures with
stack
15 DG set of 625 KVA capacity Acoustic 130 -
enclosures with
stack
16 DG set of 625 KVA capacity Acoustic 130 -
enclosures with
stack
17 DG set of 625 KVA capacity Acoustic 130 -
enclosures with
stack

4
18 DG set of 625 KVA capacity Acoustic 130 -
enclosures with
stack
19 DG set of 625 KVA capacity Acoustic 130 -
enclosures with
stack
20 DG set of 625 KVA capacity Acoustic 130 -
enclosures with
stack
21 DG set of 250 KVA capacity Acoustic 15.5 -
enclosures with
stack
22 DG set of 250 KVA capacity Acoustic 15.5 -
enclosures with
stack
II Fugitive/Noise emission :
Sl. Fugitive or Noise Emission Type of emission Control
No. sources measures
1. DG Sets Noise Acoustic
enclosures

3. Additional Conditions:
1.The unit shall maintain the stacks and acoustic enclosures provided for DG sets. The emission let
out from the DG sets shall satisfy the Ambient Air Quality/emission/ANL standards prescribed by the
Board.
2.The unit shall comply with the conditions imposed in the environmental clearance obtained from
SEIAA, Tamil Nadu vide Letter No. SEIAA/TN/F.5006/EC/8 (b)/498/2016 dated 24.10.2016.
3.The unit shall develop green belt within the premises considering 25% of its total area as green belt
area.
S. CHARLES
Digitally signed by S. CHARLES RODRIGUEZ
DN: c=IN, o=TAMILNADU POLLUTION CONTROL BOARD,
ou=ENGINEERING DEPARTMENT, postalCode=600032,
st=Tamil Nadu,

RODRIGUEZ
2.5.4.20=59bfdaf6e51682ab79962b88a2fc2762c95680b2
971b84d2f6975a59ad6c315a, cn=S. CHARLES
RODRIGUEZ
Date: 2017.12.23 10:57:01 +05'30'

For Member Secretary,


Tamil Nadu Pollution Control Board,
Chennai

5
GENERAL CONDITIONS

1. This consent to establish cannot be construed as consent to operate and the unit shall not commence
the operation without obtaining the Consent to operate.
2. The applicant shall make a request for grant of consent to operate at least thirty days, before the
commissioning of trial production.
3. Any Change in the details furnished in the conditions has to be brought to the notice of the Board and
got approved by the Board, before obtaining consent to operate under the said Act.
4. The unit has to comply with the provisions of Public Liability Insurance Act, 1991 to provide
immediate relief in the event of any hazard to human beings, other living creatures/plants and
properties while handling and storage of hazardous substances (wherever applicable).
5. Consent to operate will not be issued unless the unit complies with the conditions of consent to
establish.
6. The unit shall provide adequate water sprinklers for the control of dust emission during the loading
and unloading of construction material so as to minimize the dust emission.
7. The unit shall provide water sprinklers along the temporary roads inside the premises to avoid fugitive
dust emission during the vehicle movements.
8. The unit shall develop green belt of adequate width around the premises.
9. In case there is any change in the management, the unit shall inform the change with relevant
documents immediately.
S. CHARLES
Digitally signed by S. CHARLES RODRIGUEZ
DN: c=IN, o=TAMILNADU POLLUTION CONTROL BOARD,
ou=ENGINEERING DEPARTMENT, postalCode=600032,
st=Tamil Nadu,

RODRIGUEZ 2.5.4.20=59bfdaf6e51682ab79962b88a2fc2762c95680b29
71b84d2f6975a59ad6c315a, cn=S. CHARLES RODRIGUEZ
Date: 2017.12.23 10:57:36 +05'30'

For Member Secretary,


Tamil Nadu Pollution Control Board,
Chennai