0% found this document useful (0 votes)
216 views11 pages

Proposal For The Construction of Comfort Rooms On The Second and Third Floor of Mabini Colleges

The proposal requests P200,000 to construct new comfort rooms on the second and third floors of Mabini Colleges over 30 days. It notes the current comfort rooms are inadequate and inconveniently located. The project aims to increase student and staff satisfaction by providing more accessible facilities. A survey will evaluate if the new rooms meet needs for proximity and encourage greater bathroom use. Results will be published in the school newsletter.

Uploaded by

hansel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
216 views11 pages

Proposal For The Construction of Comfort Rooms On The Second and Third Floor of Mabini Colleges

The proposal requests P200,000 to construct new comfort rooms on the second and third floors of Mabini Colleges over 30 days. It notes the current comfort rooms are inadequate and inconveniently located. The project aims to increase student and staff satisfaction by providing more accessible facilities. A survey will evaluate if the new rooms meet needs for proximity and encourage greater bathroom use. Results will be published in the school newsletter.

Uploaded by

hansel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 11

Mabini Colleges

Daet, Camarines Norte

PROPOSAL FOR THE CONSTRUCTION OF

COMFORT ROOMS ON THE SECOND AND

THIRD FLOOR OF MABINI COLLEGES

Starting Date: APRIL 2017

Duration: 30 DAYS

Project Directors: CREO, Jokoz; RICERRA, Agnetha Larize Noemi Lynn;

FAJARDO, Danna Cenn; NAGERA, Marc Hancel;

CUELA, Mary Antonette; LATOSA, Abigail

Total Amount of Funds Requested: P 200,000.00


TABLE OF CONTENTS

I. ABSTRACT ...............................................................................................................1

II. INTRODUCTION ....................................................................................................2

III. NEEDS/PROBLEMS .............................................................................................3

IV. GOALS/OBJECTIVES............................................................................................3

V. PROJECT PLAN ......................................................................................................4

VI. EVALUATION..........................................................................................................4

VII. DISSEMINATION ...................................................................................................5

VIII. KEY PERSONNEL ..................................................................................................5

IX. EQUIPMENT AND FACILITIES ........................................................................6

X. BUDGET ....................................................................................................................8
ABSTRACT

This proposal addresses the construction of new comfort rooms in Mabini Colleges. The need for

its construction should be considered. The inadequacy and inconveniency of its location primarily

affects the students and the other members of the school community. Its main objective is basically

to increase the satisfaction of the targeted population. It is significant because it can help not just

the students, but also the faculty and non-faculty members of the school. The outcomes will include

the approval of the whole population, the satisfaction, and the increase in work. This will be

disseminated to the Sublime Torch distributed by the Mabini Colleges.

1
INTRODUCTION

Mabini Colleges is an institution offering and cultivating a culture of excellence and quality

education. It aims to transform students into: God-fearing, nation-loving, earth-caring, law-abiding,

PRODUCTIVE, and locally and globally competitive persons. Focus on the word PRODUCTIVE.

The school built high-standard facilities, but is it adequate and convenient enough for the whole

population? For the students to be productive, they should not be burdened. The location of the

facilities may or may not affect the students’ productivity. Its’ compatibility with the other

facilities next to it can greatly influence each one’s growth as a student.

Comfort rooms are built not just for the students, but also to all individuals involved with the

institution. Mabini Colleges’ main campus have comfort rooms located on the ground floor, (one

right next to room 108, which is for the male population AND one near the clinic, which is for the

female). Other comfort rooms, like the one located on the third floor, is closed and not functioning.

The school also have comfort rooms near the high school building, but it can be inconvenient

sometimes because of its location, its size, and basically, not everyone can use it. Some rooms,

like the faculty room, only allow authorized personnel to use it. The construction of comfort rooms

in Mabini Colleges should be considered because it is a must in every building for an efficient

work.

2
PROBLEMS / NEEDS

The problem to be addressed is the inadequacy and inconveniency of comfort rooms in Mabini

Colleges. The need for the construction of new comfort rooms, specifically on the second and third

floor should be considered. The target population is the overall population of the institution, the

students, faculty and non-faculty members. Specifically, the following are needed to be address:

• How does the location of the comfort rooms affect the students, faculty and non-faculty

members?

• What are the pros and cons of constructing new comfort rooms?

• Will the new comfort rooms satisfy the need of the targeted population?

GOALS/ OBJECTIVES

This project proposal will focus on the construction of comfort rooms in the roof garden of Mabini

Colleges for their students and employees. Specifically, this project will satisfy the following:

 To provide the need of the students and employees for a more convenient location of

comfort rooms.

 To avoid wastage of time.

 To encourage students to use the bathroom.

3
PROJECT PLAN

Provided below are the detailed information of the proposed procedures:

1. Gathered the specific details of the proposal for the construction of comfort rooms in

the second floor and third floor of Mabini Colleges.

2. Formulated a survey questionnaires. [40 Respondents- 20 Male, 20 Female]

3. The construction of comfort rooms will be patterned to the comfort rooms in the Mabini

Colleges main building.

EVALUATION

To evaluate the success of this project proposal, we will conduct a survey by using questionnaire.

The questionnaire will contain the following questions:

 Can the newly built comfort rooms satisfy your need for a nearer comfort room?

 Is it quicker now to use the comfort room?

 Does the new comfort room encourage you to use it?

These questions can be answered by shading YES or NO. Through this, we can obtain the

necessary information for us to know if the newly built comfort rooms give any differences.

4
DISSEMINATION

Students that have rooms residing on the second and third floor will not be hasty in excusing

themselves to class just to go to the comfort room. Students won’t miss some important details in

class during discussion because the time spent going back and forth to the ground floor up to the

upper floors will be lesser. Student will have better access of the comfort rooms. This improvement

will be written in the Sublime Torch of Mabini Colleges.

KEY PERSONNEL

Below is a list of key personnel who will be responsible for the completion of the project, as well

as the other personnel involved in the project.

Client: MABINI COLLEGES

Project Manager: MABINI COLLEGES MANAGEMENT

Team: MABINI COLLEGES MANAGEMENT

Other: CREO, JOKOZ CUELA, MARY ANTONETTE

LATOSA, ABIGAIL NAGERA, MARC HANCEL

FAJARDO, DANNA CENN RICERRA, AGNETHA LARIZE


NOEMI LYNN

5
Quantity Description Unit Price Amount
2 pcs PVC Door (60 x 210) P 970.00 P 1,940.00
2000 pcs Hollow Blocks 10.00 20,000.00
30 bags Cement 210.00 21,000.00
100 pcs Tiles 27.00 2,700.00
10 bags Ceramic tile adhesive 120.00 1,200.00
2 gal Enamel (paint) 575.00 1,150.00
2 gal Flat (paint) 460.00 920.00
2 pcs Toilet Bowls 9,000.00 18,000.00
1 pc Male Urinal 8,000.00 8,000.00
2 pc Sinks (faucet included) 6,500.00 13,000.00
2 pc Wall Mirrors 1,200.00 2,400.00
4 pc LED tube lamps 950.00 1,900.00
2 pc Exhaust fan 1,000.00 2,000.00
2 pc Hygienic Spray 1,500.00 3,000.00
2 pc Pail 50.00 100.00
2 pc Dipper 20.00 40.00
2 pcs Trash bins 90.00 180.00
50 pcs Coco Lumber (2x2) 50.00 2,500.00
5 pcs Plywood (1/4) 300.00 1,500.00
4 pcs Plywood (3/4) 400.00 1,600.00
100 sacks Gravel and Sand 60.00 6,000.00
2 kls Nail 70.00 140.00
2 kls Tire Wires 120.00 240.00
70 pcs Iron Rods (10mm) 258.00 18,000.00

Total P 127,510.00
EQUIPMENT AND FACILITIES

The following is a summary of materials that are needed for the project. The amounts represented

below are to be used as an estimate only.

LABOR

5 foreman x P500.00 per day = P2,500.00 x 30 days = P 75,000.00

SNACKS
5 foreman x P50.00 per day = P250.00 x 30 days = P 7,500.00
Total Labor and Snacks P 82,500.00

Total P 210,010.00
BUDGET 7

The estimated amount for constructing a comfort room is P210,010.00. This value is spent on the

materials including labor.

The amount of P127,510.00 is divided into the following materials: PVC Door (60 x 210) P

1,940.00; Hollow Blocks P 20,000.00; Cement P21,000.00; Tiles P2,700.00; Ceramic tile adhesive

P1,200.00; Enamel (paint) P1,150.00; Flat (paint) P920.00; Toilet Bowls P18,000.00; Male Urinal

P8,000.00; Sinks (faucet included) P13,000.00; Wall Mirrors P2,400.00; LED tube lamps

P1,900.00; Exhaust fan P2,000.00; Hygienic Spray P3,000.00; Pail P100.00; Dipper P40.00; Trash

Bins P180.00; Coco Lumber (2x2) P2,500.00; Plywood (1/4) P1,500.00; Plywood (3/4) 1,600.00;

Gravel and Sand P6,000.00; Nail P140.00; Tire Wires P240.00; Iron Rods (10mm) P18,000.00.
The figures P82,500.00 is the estimated amount for the labor and snacks. Labor cost is P500.00

per day with five laborers for thirty days amounting to P75,000.00 and snacks for P50.00 each day

for the total amount of P7,500.00