                                         PROJECT PROPOSAL
         School : DEL GALLEGO CENTRAL
         Municipality: DEL GALLEGO
         Congressional District: 1st
A.Project Title:                                   B. Schedule of Implementation:           C. Proponent:
Improve and repair / replace the roofing           March– December, 2021                      SALVE R.PARFILES
and ceiling of the cultural center and                                                         School Principal
pavilion and repaint its stage
D. Project Location : DEL GALLEGO CENTRAL SCHOOL, DEL GALLEGO DISTRICT,CAMSUR
E. Cooperating Persons : School Head, BAC, Physical Facilities Coordinator, PTA as observing body
F. Overview/ Rationale/ Objectives : It is a requirement that every school shall be secured and free from any danger for the safety of
the learners , teachers and all clienteles and in order to guard also the building structures from strong winds during typhoon
months,thus repair and replacement of the roofing and ceiling, improvement of the school cultural center and pavilion is needed.
G. Goal/ Scope / Beneficiaries : To guard the building structures from strong winds during typhoon months and to make them more
conducive for all the occupants of the said buildings.
H. Work Program : School Physical Facilities Coordinator, School Head shall serve as implementing body of the propose project. The
Office of the School Principal shall serve as monitoring body of the project while PTA shall serve as observing body.
I. Funding Source : School MOOE CA 2021
J. Budgetary Requirements : Please see approved Bill of Quantity and Program of Works
                           Total Material Cost                      44,595.00
                           Labor Cost                               13,378.50
                           Total Project Cost                       57,973.50
K.Reporting and Evaluation : Funds shall be liquidated three days after the completion of the project.
 The following persons shall be involved in the evaluation. School Principal, School Physical Facilities Coordinator,
 Division Technical Property Inspector.
L.Enclosures :                                     M. Notes on Pictures:
   1. Bill of materials/ estimates                 1. Pre-Repair/Construction to be attached to project proposal
   2. Program of Work                              2.Pictures for on –going and completed projects together with the pre repair
   3. Pre-Repair Inspection                        construction pictures shall be attached to the accomplishment report and liquidation
   4. Project Location Map                         documents
Prepared by:                          Recommending Approval:                            Approved:
       SALVE R. PARFILES                       PEDRO J. PELONIO, Ph.D.                          LOIDA N. NIDEA, CESO V
         School Principal                           SGOD Chief                                Schools Division Superintendent
                                       Republic of the Philippines
                                       Department of Education
                                              Region V
                                    DIVISION OF CAMARINES SUR
                                       Del Gallego District
                                DEL GALLEGO CENTRAL SCHOOL
                                       School ID : 112577
School : DEL GALLEGO CENTRAL
Municipality: DEL GALLEGO
Congressional District: 1st
PROJECT TITLE:                                Improve and repair / replace the roofing and ceiling of the
                                              cultural center and pavilion and repaint its stage
ALLOCATION:                                   57,973.50
SOURCE OF FUND:                               School MOOE CY 2021
MODE OF IMPLEMENTATION:                       By Administration
PROJECT DURATION:                             20 Calendar Days
PHYSICAL TARGET:                              Cultural Center and Pavilion
                          BILL OF QUANTITY & COST ESTIMATES
Scope of Works:        Construction Works
   A. Bill of Materials
    Quantity             Unit                  Description                       Unit Price          Total
       27                 pc         Marine Plywood, 1/4                          580.00           15,660.00
       20                 pc         Good Lumber, 2 x2 x 12                       260.00           5,200.00
       5                   kl        Wood Nail, 3”                                120.00            600.00
       5                   kl        Wood Nail, 2”                                120.00            600.00
       5                   kl        Wood Nail, 1 1/2”                            120.00            600.00
       3                 pails       Latex paint, white                          2,500.00          7,500.00
       1                 pail        Black Paint                                 2,300.00          2,300.00
       2                  gal        Acri color, red                              800.00           1,600.00
       2                  gal        Acri color, blue                             800.00           1,600.00
       2                  gal        Acri color, green                            800.00           1,600.00
       2                  gal        Acri color, yellow                           800.00           1,600.00
       2                  gal        Chocolate brown                              800.00           1,600.00
       5                  pc         Hand brush, #2                               150.00            750.00
       3                  pc         Roller brush, #9                             450.00           1,350.00
       3                litters      Thinner                                      145.00            435.00
       2                pouch        Vulcaseal                                    800.00           1,600.00
                                             Labor Cost for Materials                              44,595.00
                                                       B. Labor Cost                               13,378.50
                                                         Grand Total                               57,973.50
Prepared by:                                         Checked & Reviewed:
         KELVIN CLINE A. RAFA                                             NICOLAS L. REBELLON, JR.
     School Physical Facilities Coordinator                             In-Charge of Division Cong’l District
Approved:                                                    Concurred:
         SALVE R. PARFILES                                                ENGR. VIRGILIO BANCASO
            School Principal                                              Division Engineer III/ EFU
                                       Republic of the Philippines
                                       Department of Education
                                              Region V
                                    DIVISION OF CAMARINES SUR
                                       Del Gallego District
                                DEL GALLEGO CENTRAL SCHOOL
                                       School ID : 112577
School : DEL GALLEGO CENTRAL
Municipality: DEL GALLEGO
Congressional District: 1st
PROJECT TITLE:                                Improve and repair/replace the roofing and ceiling of
                                              the cultural center and pavilion and repaint its stage
ALLOCATION:                                   57,973.50
SOURCE OF FUND:                               School MOOE CY 2021
MODE OF IMPLEMENTATION:                       By Administration
PROJECT DURATION:                             20 Calendar Days
PHYSICAL TARGET:                              Cultural Center and Pavilion
                                    PROGRAM OF WORKS
 Item       Description            % Total          Quantity          Unit            Cost             Remarks
  No.     (Scope of Work)
   1    Repair and                   100                2             Area         57,973.50
        improvement of
        roofing and ceiling
        of the cultural
        center and pavilion
               TOTAL                 100                                           57,973.50
Prepared by:                                         Checked & Reviewed:
         KELVIN CLINE A. RAFA                                             NICOLAS L. REBELLON, JR.
     School Physical Facilities Coordinator                             In-Charge of Division Cong’l District
Approved:                                                    Concurred:
         SALVE R. PARFILES                                                ENGR. VIRGILIO BANCASO
            School Principal                                              Division Engineer III/ EFU
                                       Republic of the Philippines
                                       Department of Education
                                              Region V
                                    DIVISION OF CAMARINES SUR
                                      Del Gallego District
                               DEL GALLEGO CENTRAL SCHOOL
                                      School ID : 112577
                                   PROJECT PROPOSAL
School : DEL GALLEGO CENTRAL
Municipality: DEL GALLEGO
Congressional District: 1st
PRE REPAIR INSPECTION
    There is a need to improve and repair / replace the roofing and celing, and repaint its stage to make it
more conducive for all the occupancy during various school activities.
Pre-Inspected by:                                            Noted:
             KELVIN CLINE A. RAFA                                     SALVE R. PARFILES
        School Physical Facilities Coordinator                          School Principal
Date : ___________________________________                   Date:___________________________
POST REPAIR INSPECTION
Findings:       _________________________________________________________________________
                 ________________________________________________________________________
                ________________________________________________________________________
Inspected by:                                                Noted:
        ______________________________                                SALVE R. PARFILES
        School Physical Facilities Coordinator                          School Principal
Date : ___________________________________                   Date:___________________________