0% found this document useful (0 votes)
52 views1 page

Gregdr

This document is a bill of quantities comparing the estimated costs of various construction projects - twin row houses, town houses, and duplexes. It lists the estimated costs for civil works, structural work, plumbing, and electrical work for each project type, with the total costs coming out to $0 for the row houses and duplexes, and showing a #REF! error for the estimated total cost of the town houses.

Uploaded by

Yazer Arafath
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views1 page

Gregdr

This document is a bill of quantities comparing the estimated costs of various construction projects - twin row houses, town houses, and duplexes. It lists the estimated costs for civil works, structural work, plumbing, and electrical work for each project type, with the total costs coming out to $0 for the row houses and duplexes, and showing a #REF! error for the estimated total cost of the town houses.

Uploaded by

Yazer Arafath
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Bill Of Quantities TWIN

ROW HOUSE TOWN HOUSE DUPLEX


SLNo. DESCRIPTION ARCHITECTS ARCHITECTS ARCHITECTS
QUOTE
AMOUNT QUOTE
AMOUNT QUOTE
AMOUNT
1 Civil Works 0.00 0.00 0.00

2 Structural 0.00 #REF! 0.00

3 Plumbing 0.00 0.00 0.00

4 Electrical 0.00 0.00 0.00

TOTAL 0.00 #REF! 0.00

You might also like