Project Name: Project Location: Owner: Project Duration: Project Amount

The project involves dismantling and installing thermoplastic roofing and sidings at the San Martin Manufacturing Corporation in Misamis Oriental over 4 days for 35,000 pesos. The scope of work includes removing the existing roofing and sidings, painting framing, and installing new thermoplastic roofing, sidings, and flashing. An S-curve shows the planned daily accomplishments and cumulative costs.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
51 views4 pages

Project Name: Project Location: Owner: Project Duration: Project Amount

The project involves dismantling and installing thermoplastic roofing and sidings at the San Martin Manufacturing Corporation in Misamis Oriental over 4 days for 35,000 pesos. The scope of work includes removing the existing roofing and sidings, painting framing, and installing new thermoplastic roofing, sidings, and flashing. An S-curve shows the planned daily accomplishments and cumulative costs.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

PROJECT NAME: DISMANTLING AND INSTALLATION OF THERMOPLASTIC ROOFING AND SIDINGS OF MULTI-PURPOSE AREA

PROJECT LOCATION: PHIVIDEC IND'L ESTATE, SAN MARTIN, VILLANUEVA, MISAMIS ORIENTAL
OWNER: SAN MARTIN MANUFACTURING CORPORATION
PROJECT DURATION: 4 CALENDAR DAYS
PROJECT AMOUNT ₱ 35,000.00

RELATIVE
SCOPE OF WORK COST OF LABOR DAY 1 DAY 2 DAY 3 WEEK 4
WEIGHT (%)

100.000
1. REMOVAL OF EXISTING G.I. ROOFING, 94.983
SIDINGS AND BENDED 19,782.609 56.522 18.84 18.84 18.84 84.949
89.966
81.075
77.200
2. PAINTING OF FRAMING

3. INSTALLATION OF THERMOPLASTIC
ROOFING 7,237.403 20.678 6.89276 6.89276
51.467 6.89276
4. INSTALLATION OF THERMOPLASTIC
SIDING 2,712.165 7.749
25.733
3.87452 3.87452
5. INSTALLATION OF THERMOPLASTIC
FLASHING/FULLTEKSCREW 5,267.823 15.051 5.02 5.02 5.02

TOTAL COST 35,000 100

25.73 25.73 25.73 3.87 3.87 5.02 5.02 5.02


Daily Accomplishment (%)
25.73 51.47 77.20 81.07 84.95 89.97 94.98 100.00

9,006.67 9,006.67 9,006.67 1,356.08 1,356.08 1,755.94 1,755.94 1,755.94


Daily Accomplishment (₱)
9,006.67 18,013.34 27,020.01 28,376.09 29,732.18 31,488.12 33,244.06 35,000.00
1 25.733
2 51.467
3 77.200
4 81.075
5 84.949
6 89.966
7 94.983
8 100.000