SHEET PILE DRIVING RECORD
Proposed LPG Storage Plant Development
Client: A.A Rano Nigeria limited Contractor: Wizchino Engineering limited
Consultant: Crusteam Nigeria Limited Work Section: Shore protection
Record Prepared by (For Contractor) :
Name: Position : Signature /Date:
Date of Date of Sheet Pile Initial Length Hammer Hammer Hammer Hammer Weight
Production Driving Ref. No. of Sheet Pile Make/Model Type Drop (kN)
Height (m)
Penetration Blow Penetration Blow Penetration Blow Penetration Blow
(m) Count/0.25m (m) Count/0.25m (m) Count/0.25m (m) Count/0.25m
0-0.25 4.25-4.50 8.50-8.75 12.75-13.0
0.25-0.50 4.5-4.750 8.75-9.0 13.0-13.25
0.5-0.75 4.75-5.0 9.0-9.25 13.25-13.50
0.75-1.0 5.0-5.25 9.25-9.5 13.5-13.75
1.0-1.25 5.25-5.50 9.5-9.75 13.75-14.0
1.25-1.50 5.5-5.75 9.75-10.0 14.0-14.25
1.5-1.75 5.75-6.0 10.0-10.25 14.25-14.5
1.75-2.0 6.0-6.25 10.25-10.5 14.5-14.75
2.0-2.25 6.25-6.50 10.5-10.75 14.75-15.0
2.25-2.5 6.50-6.75 10.75-11.0 15.0-15.25
2.5-2.75 6.75-7.0 11.0-11.25 15.25-15.5
2.75-3.0 7.0-7.25 11.25-11.50 15.5-15.75
3.0-3.25 7.25-7.5 11.5-11.75 15.75-16.0
3.25-3.50 7.5-7.75 11.75-12.0 16.0-16.25
3.50-3.75 7.75-8.0 12.0-12.25 16.25-16.5
3.75-4.0 8.0-8.25 12.25-12.5 16.5-16.75
4.0-4.25 8.25-8.50 12.5-12.75 16.75-17.0
Tip Elevation : Cut-off Elevation : Ground Elevation:
General Observations/Obstructions during Driving (if any)
1.0
2.0
3.0
4.0
5.0
Name Position Signature/Date
Received by:
(for Consultant)