Skip to content

Milestones

List view

  • Release gate for gt 1.2: collapse polecat lifecycle/recovery/admission call paths, resolve routing identity mismatch, eliminate false recovery positives, and validate release readiness before cutting gt 1.2.

    No due date
    15/15 issues closed
  • Converge polecat lifecycle, recovery, scheduler capacity, target selection, and notification actionability so rigs can safely re-enable polecats with a configured scheduler.max_polecats=N without pileup or false SLOT_OPEN/reusable signals.

    No due date
  • Test-only stabilization work and CI reliability fixes.

    No due date
    2/2 issues closed