List view
Release gate for gt 1.2: collapse polecat lifecycle/recovery/admission call paths, resolve routing identity mismatch, eliminate false recovery positives, and validate release readiness before cutting gt 1.2.
No due date•15/15 issues closedConverge polecat lifecycle, recovery, scheduler capacity, target selection, and notification actionability so rigs can safely re-enable polecats with a configured scheduler.max_polecats=N without pileup or false SLOT_OPEN/reusable signals.
No due dateTest-only stabilization work and CI reliability fixes.
No due date•2/2 issues closed