Skip to content

Milestones

List view

  • A milestone to add all issues that do not fit in any of other milestones. This is an easy way to track those uncategorized tasks.

    No due date
  • This milestone includes all the deliverables related to building the application (e.g. Dockerfile, provisioning AWS, the local environment and the base AMI with Packer).

    Overdue by 1 year(s)
    Due by October 18, 2024
    3/9 issues closed
  • This milestone will include all deliverables that have to do with GitHub workflows that will perform the basic checks for an Elixir application. It will also build the Docker image and pull the latest images in production

    Overdue by 1 year(s)
    Due by October 18, 2024
    2/4 issues closed
  • This milestone will include all deliverables that have to do with the addition of basic instrumentation and BEAM specific metrics for your application. Any task(s) related to instrumentation (independently of which part of the stack they relate to) will be included in this milestone.

    Overdue by 1 year(s)
    Due by October 25, 2024
    0/3 issues closed
  • This milestone includes documentation for Terraform, Elixir, Packer and others and will converge with CI when needed.

    No due date