Skip to content

Latest commit

 

History

History

Folders and files

NameName
Last commit message
Last commit date

parent directory

..
 
 
 
 
 
 
 
 
 
 

README.md

Emblor Project Planning

This directory contains durable decisions, planning sessions, implementation plans, and milestone roadmaps for Emblor.

Conventions

  • decisions/ records accepted product and architecture choices. Superseded decisions remain in place and link to their replacements.
  • sessions/ captures verified repository state, assumptions, open questions, and planning progress.
  • plans/ contains implementation-ready plans with decision-to-task and verification traceability.
  • roadmaps/ sequences multiple plans and release milestones without prematurely expanding future phases into task-level plans.

The historical project handoff remains at ../project-status/HANDOFF.md.

Historical Alpha Preparation (completed)

  • plans/emblor-v2-alpha-release/plan.md — Phase 3 alpha preparation and separately approved Phase 4 2.0.0-alpha.0 publication runbook.
    • decision-manifest.md — release, documentation, compatibility, and frozen-contract decision applicability.
    • coverage.md — alpha preparation and publication obligations mapped to tasks and verification.
    • implementation-review.md — local candidate evidence, boundary review, and remaining release gates.
    • transition-runbook.md — actionable v1 preservation, internal backlog classification, manual workflow installation, v2-to-main integration, and post-publish issue/PR disposition sequence.

Active Plans

No implementation plan is currently open. Phase 5 Alpha Iteration remains active at the roadmap level while consumer feedback is collected and the checkpoint/beta-readiness review is prepared.

Active Roadmaps

  • roadmaps/emblor-v2-to-stable.md — complete milestone path from the frozen v2 vertical slice through residual hardening, alpha, docs, beta, and stable 2.0.0.

Completed Plans