This directory contains durable decisions, planning sessions, implementation plans, and milestone roadmaps for Emblor.
decisions/records accepted product and architecture choices. Superseded decisions remain in place and link to their replacements.sessions/captures verified repository state, assumptions, open questions, and planning progress.plans/contains implementation-ready plans with decision-to-task and verification traceability.roadmaps/sequences multiple plans and release milestones without prematurely expanding future phases into task-level plans.
The historical project handoff remains at ../project-status/HANDOFF.md.
plans/emblor-v2-alpha-release/plan.md— Phase 3 alpha preparation and separately approved Phase 42.0.0-alpha.0publication runbook.decision-manifest.md— release, documentation, compatibility, and frozen-contract decision applicability.coverage.md— alpha preparation and publication obligations mapped to tasks and verification.implementation-review.md— local candidate evidence, boundary review, and remaining release gates.transition-runbook.md— actionable v1 preservation, internal backlog classification, manual workflow installation, v2-to-mainintegration, and post-publish issue/PR disposition sequence.
No implementation plan is currently open. Phase 5 Alpha Iteration remains active at the roadmap level while consumer feedback is collected and the checkpoint/beta-readiness review is prepared.
roadmaps/emblor-v2-to-stable.md— complete milestone path from the frozen v2 vertical slice through residual hardening, alpha, docs, beta, and stable2.0.0.
-
plans/emblor-v2-alpha1-release-closure/plan.md- alpha.1 package, npm, GitHub metadata, consumer verification, workflow repair, README disposition, and planning closure.implementation-review.md- exact release evidence, post-publish failure disposition, and Phase 5 handoff.
-
plans/emblor-v2-alpha-performance-audit/plan.md- bounded Phase 5 package performance audit with browser evidence and a verified consumer-facing fix.findings.md- Vercel rule matrix and classified findings.implementation-review.md- before/after evidence, merged PR record, and alpha.1 closure.
-
plans/emblor-v2-alpha-release/plan.md- historical Phase 3/first-alpha preparation runbook; its alpha.0 instructions are superseded by the completed alpha.1 closure. -
plans/emblor-v2-distribution-readiness/plan.md— Phase 2 package and distribution readiness completed with verified tarball, packed consumers, release-path validation, and pushed Node 22/24 CI plus Node 24 Chromium evidence.decision-manifest.md— applicable accepted decisions and supersession resolution.coverage.md— all required distribution obligations verified.implementation-review.md— final evidence and Phase 3 recommendation.
-
plans/emblor-v2-tag-primitive/plan.md— Phase 1 residual core hardening completed with 25/25 obligations Verified and passing Node 22/24 CI plus bundled Chromium.implementation-review.md— final evidence, boundary review, and Phase 1 closure verdict.
-
plans/emblor-v2-vertical-slice/plan.md— completed package vertical slice, visual acceptance lab, and architecture-freeze gate.