Shard 1 was down due to no available committee in the current epoch. The issue happened due to two things :

  • crosslink wasn't working and leading to shard 1 signature information not updated on shard 0 which has an effect to kick out all the external validator
  • not enough voting power for internal node

this PR is to restore internal node VP to revive shard 1 consensus.

shard 1 last block will have to be reverted so the latest committee containing internal VP with 90% can be re-added to the shard 1 last block of epoch.

@sophoah sophoah merged commit a8a2a13 into harmony-one:dev May 29, 2024