Skip to content

Optimize Hebrew and Julian calendars #27401

Optimize Hebrew and Julian calendars

Optimize Hebrew and Julian calendars #27401

Triggered via pull request November 4, 2025 11:20
Status Cancelled
Total duration 7m 31s
Artifacts

build-test.yml

on: pull_request
Matrix: msrv
Matrix: test-dart
Matrix: test
Matrix: testdata
notify-slack
notify-slack
Fit to window
Zoom out
Zoom in

Annotations

21 errors
clippy
Process completed with exit code 1.
test-docs
Process completed with exit code 1.
test-gigo
Process completed with exit code 1.
test (ubuntu-latest)
Process completed with exit code 1.
test (windows-latest)
The strategy configuration was canceled because "test.ubuntu-latest" failed
test (windows-latest)
The operation was canceled.
test (macos-latest)
The strategy configuration was canceled because "test.ubuntu-latest" failed
test (macos-latest)
The operation was canceled.
semver
Canceling since a higher priority waiting request for Build and Test-perf exists
semver
The operation was canceled.
test-dart (windows-latest)
Canceling since a higher priority waiting request for Build and Test-perf exists
test-dart (windows-latest)
The operation was canceled.
test-c
Canceling since a higher priority waiting request for Build and Test-perf exists
test-c
The operation was canceled.
msrv (features-2)
Canceling since a higher priority waiting request for Build and Test-perf exists
msrv (features-2)
The operation was canceled.
msrv (features-1)
Canceling since a higher priority waiting request for Build and Test-perf exists
msrv (features-1)
The operation was canceled.
test-dart (macos-latest)
Canceling since a higher priority waiting request for Build and Test-perf exists
test-dart (macos-latest)
The operation was canceled.
Build and Test
Canceling since a higher priority waiting request for Build and Test-perf exists