SR No Work Category Indus Id Site Name Cluster Ome Name

The document appears to be a work order or bill of materials for repair and maintenance work at the White Lily site. It includes 31 line items for various civil works like repairs, painting, installation of equipment, and materials. All of the work was raised by Mahesh Khandekar on December 21, 2013 and approved by Deepak Rao on December 22, 2013. The vendor for the work is Om Enterprises and the completion date is listed as after purchase order release for all line items.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
61 views9 pages

SR No Work Category Indus Id Site Name Cluster Ome Name

The document appears to be a work order or bill of materials for repair and maintenance work at the White Lily site. It includes 31 line items for various civil works like repairs, painting, installation of equipment, and materials. All of the work was raised by Mahesh Khandekar on December 21, 2013 and approved by Deepak Rao on December 22, 2013. The vendor for the work is Om Enterprises and the completion date is listed as after purchase order release for all line items.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 9

Sr No

Work Category
Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil

Indus Id
IN-1056739 IN-1056739 IN-1056739 IN-1056739

Site Name
White Lily White Lily White Lily White Lily White Lily White Lily White Lily White Lily White Lily White Lily White Lily White Lily White Lily White Lily White Lily White Lily White Lily White Lily White Lily White Lily White Lily White Lily White Lily White Lily White Lily White Lily White Lily White Lily White Lily White Lily White Lily White Lily

Cluster
South West South West South West South West South West South West South West South West South West South West South West South West South West South West South West South West South West South West South West South West South West South West South West South West South West South West South West South West South West South West South West South West

Ome Name
Jupiter Jupiter Jupiter Jupiter Jupiter Jupiter Jupiter Jupiter Jupiter Jupiter Jupiter Jupiter Jupiter Jupiter Jupiter Jupiter Jupiter Jupiter Jupiter Jupiter Jupiter Jupiter Jupiter Jupiter Jupiter Jupiter Jupiter Jupiter Jupiter Jupiter Jupiter Jupiter

2
3

4
5

6
7

IN-1056739 IN-1056739 IN-1056739 IN-1056739 IN-1056739 IN-1056739 IN-1056739 IN-1056739 IN-1056739 IN-1056739 IN-1056739 IN-1056739 IN-1056739 IN-1056739 IN-1056739 IN-1056739 IN-1056739 IN-1056739 IN-1056739 IN-1056739 IN-1056739 IN-1056739 IN-1056739 IN-1056739 IN-1056739 IN-1056739 IN-1056739 IN-1056739

8
9

10
11

12
13

14
15

16
17

18
19

20
21

22
23

24
25

26
27

28
29

30
31

32

Item Description
Rectification of earthing chamber. Shelter Access ladder & AC stand painting Painting Supply and installation of earthing strip(25X6 mm) for Delta, pole and EGB to IGB. Hand railing require for LMR Access ladder Removal of delta pole pedestle plaster. Delta pole pedestle plaster. White wash for pole pedestles and delta pole pedestles and cable tray support pedestles,shelter access ladder pedestles. Supply and installation of G.I. LA. PVC sleeve. Supply and installation of MS safety railing for Delta"L"shape. Supply of 10 mm dia. Anchor fastners for railing base plate. Re-installation of cable tray. Cable tray support pedestle casting after reinstallation of cable tray. Supply of cable tray nut-bolts. Supply and installation of ladder in shelter. Cable tray (15 Mtr) transportation. Supply and installation of chekkar plate plateform for AC maintainance. Shelter access ladder ,delta access ladder pedestle casting. Zinc spray for rusted nutbolts Transportation charges for MS Material. Site cleaning and debris removal. 16 Sq mm Copper conductor unarmoured flexible cable (for Earthing-ACDB to power plant and BB,SMPS,MW Rack and EGB to IGB) Labour charges @ 40%. DC Lamp Bulk Head S/F 32A 2 pole MCB Encloser cost for MCB 63 A 4P 32A single pole MCB S/L of Trunking Patti for cable routing 45x45 mm 4 Sq mm single core unarmourd flexible cable (For AC) Labour charges @ 40%. Copper lugs.

UOM
2 3 16 32 60 60 140 1 12 168 56 35 27 4 1

Qty
Nos Job Rmt Kgs SFT SFT SFT Nos Rmt Kgs Nos Rmt Nos Kgs Nos

Rate
2850 500 148 75 15 40 10 576 32 75 54 70

Value
5700 1500 2368 2400 900 2400 1400 576 384 12600 3024 2450 6750 400 1750 1000 5890.5 750 1875 1000 2000 2472

250
100 1750

0.5 69.3 3 3 1 1 24 1 1 2 1 2 9 42 26

Load Kgs Nos Nos Job Nos Rmt Nos Nos Nos Nos Nos Rmt Rmt Nos

2000 85 250 625 1000 2000 103 645 806 551 410 106 97 27 8.5

988.8 645 806 1102 410 212 873 1134 453.6 221

66434.9

Reason for work


Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair

Escalation raised By
Mahesh Khandekar Mahesh Khandekar Mahesh Khandekar Mahesh Khandekar Mahesh Khandekar Mahesh Khandekar Mahesh Khandekar Mahesh Khandekar Mahesh Khandekar Mahesh Khandekar Mahesh Khandekar Mahesh Khandekar Mahesh Khandekar Mahesh Khandekar Mahesh Khandekar Mahesh Khandekar Mahesh Khandekar Mahesh Khandekar Mahesh Khandekar Mahesh Khandekar Mahesh Khandekar Mahesh Khandekar Mahesh Khandekar Mahesh Khandekar Mahesh Khandekar Mahesh Khandekar Mahesh Khandekar Mahesh Khandekar Mahesh Khandekar Mahesh Khandekar Mahesh Khandekar Mahesh Khandekar

Escalation raise date


21/12/2013 21/12/2013 21/12/2013 21/12/2013 21/12/2013 21/12/2013 21/12/2013 21/12/2013 21/12/2013 21/12/2013 21/12/2013 21/12/2013 21/12/2013 21/12/2013 21/12/2013 21/12/2013 21/12/2013 21/12/2013 21/12/2013 21/12/2013 21/12/2013 21/12/2013 21/12/2013 21/12/2013 21/12/2013 21/12/2013 21/12/2013 21/12/2013 21/12/2013 21/12/2013 21/12/2013 21/12/2013

Escalation Approved By
Deepak Rao Deepak Rao Deepak Rao Deepak Rao Deepak Rao Deepak Rao Deepak Rao Deepak Rao Deepak Rao Deepak Rao Deepak Rao Deepak Rao Deepak Rao Deepak Rao Deepak Rao Deepak Rao Deepak Rao Deepak Rao Deepak Rao Deepak Rao Deepak Rao Deepak Rao Deepak Rao Deepak Rao Deepak Rao Deepak Rao Deepak Rao Deepak Rao Deepak Rao Deepak Rao Deepak Rao Deepak Rao

Escalation Approved Date


22/12/2013 22/12/2013 22/12/2013 22/12/2013 22/12/2013 22/12/2013 22/12/2013 22/12/2013 22/12/2013 22/12/2013 22/12/2013 22/12/2013 22/12/2013 22/12/2013 22/12/2013 22/12/2013 22/12/2013 22/12/2013 22/12/2013 22/12/2013 22/12/2013 22/12/2013 22/12/2013 22/12/2013 22/12/2013 22/12/2013 22/12/2013 22/12/2013 22/12/2013 22/12/2013 22/12/2013 22/12/2013

SME Vendor Name


Om Enterprises Om Enterprises Om Enterprises Om Enterprises Om Enterprises Om Enterprises Om Enterprises Om Enterprises Om Enterprises Om Enterprises Om Enterprises Om Enterprises Om Enterprises Om Enterprises Om Enterprises Om Enterprises Om Enterprises Om Enterprises Om Enterprises Om Enterprises Om Enterprises Om Enterprises Om Enterprises Om Enterprises Om Enterprises Om Enterprises Om Enterprises Om Enterprises Om Enterprises Om Enterprises Om Enterprises Om Enterprises

Attach doc -Quotation

Attach doc -Photo

Attach doc Society NOC

Attach doc Approved mail


Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

Attach doc Survey reports

Work Completion Date


After P. O.release After P. O.release After P. O.release After P. O.release After P. O.release After P. O.release After P. O.release After P. O.release After P. O.release After P. O.release After P. O.release After P. O.release After P. O.release After P. O.release After P. O.release After P. O.release After P. O.release After P. O.release After P. O.release After P. O.release After P. O.release After P. O.release After P. O.release After P. O.release After P. O.release After P. O.release After P. O.release After P. O.release After P. O.release After P. O.release After P. O.release After P. O.release