Aminbazar Grid Substation Load Calculation
Aminbazar Grid Substation Load Calculation
DC LOAD CALCULATION
                                                                                                      Power
 No.     Feeder Type                     Function                       Model          Manufacturer                            Remarks
                                                                                                       Consumption (W)
   1    400kV Control Diameter Panel
           Control
  1.1                    Bay Control Unit (Main)                        REC 670              ABB          50x3=150       Fed from DC BUS 1
          Diameter-1
                         Bay Control Mimic (Backup)                    BCM 800               ABB              5            Fed from DC BUS 1
                         Multifunction Meter                            Elite 440        SECURE            2x10=20       Fed from DC BUS 1
                         KV Meter                                                                             10         Fed from DC BUS 1
                         Ammeter                                                         RESHAB           3x5.5=16.5     Fed from DC BUS 1
                                                                                                                         Fed from DC BUS 1 & 2
                         Controlled Switch (PSD)                         PSD02           Siemens           15x3=45
                                                                                                                              (Change-over)
                                                        DC BUS 1                                            246.5
                                     Total
                                                        DC BUS 2                                             45
           Control
  1.2                    Bay Control Unit (Main)                        REC 670              ABB          50x3=150       Fed from DC BUS 1
          Diameter-2
                         Bay Control Mimic (Backup)                    BCM 800               ABB              5            Fed from DC BUS 1
                         Multifunction Meter                            Elite 440        SECURE            2x10=20       Fed from DC BUS 1
                         KV Meter                                                                             10         Fed from DC BUS 1
                         Ammeter                                                         RESHAB           3x5.5=16.5     Fed from DC BUS 1
                                                                                                                         Fed from DC BUS 1 & 2
                         Controlled Switch (PSD)                         PSD02           Siemens           15x3=45
                                                                                                                              (Change-over)
                                                        DC BUS 1                                            246.5
                                     Total
                                                        DC BUS 2                                             45
           Control
  1.3                    Bay Control Unit (Main)                        REC 670              ABB          50x3=150       Fed from DC BUS 1
          Diameter-3
                         Bay Control Mimic (Backup)                    BCM 800               ABB              5            Fed from DC BUS 1
                         Multifunction Meter                            Elite 440        SECURE            2x10=20       Fed from DC BUS 1
                         KV Meter                                                                             10         Fed from DC BUS 1
                         Ammeter                                                         RESHAB           3x5.5=16.5     Fed from DC BUS 1
                                                                                                                         Fed from DC BUS 1 & 2
                         Controlled Switch (PSD)                         PSD02           Siemens           15x3=45
                                                                                                                              (Change-over)
                                                        DC BUS 1                                            246.5
                                     Total
                                                        DC BUS 2                                             45
                                                                        Page 1 of 10
Design,Supply,Installation,Testing Commissioning of 400/230/33kV Aminbazar Grid Substation
           Control
  1.4                    Bay Control Unit (Main)                        REC 670              ABB    50x3=150     Fed from DC BUS 1
          Diameter-4
                         Bay Control Mimic (Backup)                    BCM 800               ABB        5          Fed from DC BUS 1
                         Multifunction Meter                            Elite 440       SECURE       2x10=20     Fed from DC BUS 1
                         KV Meter                                                                       10       Fed from DC BUS 1
                         Ammeter                                                        RESHAB      3x5.5=16.5   Fed from DC BUS 1
                                                                                                                 Fed from DC BUS 1 & 2
                         Controlled Switch (PSD)                         PSD02           Siemens     15x3=45
                                                                                                                      (Change-over)
                                                            DC BUS 1                                  246.5
                                      Total
                                                            DC BUS 2                                   45
                                                            DC BUS 1                                   59.6
                                      Total
                                                            DC BUS 2                                   59.6
  2.2     Gopalganj-2    Distance Protection (Main-1)                   REL 670            ABB         50          Fed from DC BUS 1
                         Differential Protection (Main-2)               REL 670            ABB         50          Fed from DC BUS 2
                         Trip Coil Supervision 1                        TSG 930          JUCKER        9.6         Fed from DC BUS 1
                         Trip Coil Supervision 2                        TSG 930          JUCKER        9.6         Fed from DC BUS 2
                                                            DC BUS 1                                   59.6
                                      Total
                                                            DC BUS 2                                   59.6
  2.3    Meghnaghat-1 Distance Protection (Main-1)                      REL 670            ABB         50          Fed from DC BUS 1
                      Differential Protection (Main-2)                  REL 670            ABB         50          Fed from DC BUS 2
                      Trip Coil Supervision 1                           TSG 930          JUCKER        9.6         Fed from DC BUS 1
                      Trip Coil Supervision 2                           TSG 930          JUCKER        9.6         Fed from DC BUS 2
                                                            DC BUS 1                                   59.6
                                      Total
                                                            DC BUS 2                                   59.6
  2.4    Meghnaghat-2 Distance Protection (Main-1)                      REL 670            ABB         50          Fed from DC BUS 1
                      Differential Protection (Main-2)                  REL 670            ABB         50          Fed from DC BUS 2
                      Trip Coil Supervision 1                           TSG 930          JUCKER        9.6         Fed from DC BUS 1
                      Trip Coil Supervision 2                           TSG 930          JUCKER        9.6         Fed from DC BUS 2
                                                            DC BUS 1                                   59.6
                                      Total
                                                            DC BUS 2                                   59.6
                                                            DC BUS 1                                   59.6
  2.5      Future T/L                 Total
                                                            DC BUS 2                                   59.6
                                                            DC BUS 1                                   74.6
                                      Total
                                                            DC BUS 2                                   59.6
                                                                        Page 2 of 10
Design,Supply,Installation,Testing Commissioning of 400/230/33kV Aminbazar Grid Substation
                                                          DC BUS 1                                    74.6
                                      Total
                                                          DC BUS 2                                    59.6
                                                          DC BUS 1                                    74.6
                                      Total
                                                          DC BUS 2                                    59.6
                                                          DC BUS 1                                     232
                                      Total
                                                          DC BUS 2                                     232
                                                          DC BUS 1                                     232
                                      Total
                                                          DC BUS 2                                     232
                                                          DC BUS 1                                     49
                                      Total
                                                          DC BUS 2                                     49
                                                                        Page 3 of 10
Design,Supply,Installation,Testing Commissioning of 400/230/33kV Aminbazar Grid Substation
          Tariff Meter
  5.2                      Gopalganj-1 Meter-Check                                           Elster          7
          Panel-Check
                           Gopalganj-2 Meter-Check                                           Elster          7
                           Meghnaghat-1 Meter-Check                                          Elster          7          Fed from DC BUS 1 & 2
                           Meghnaghat-2 Meter-Check                                          Elster          7               (Change-over)
                           400/230/33kV ATR-1 Meter -Check                                   Elster          7
                           400/230/33kV ATR-2 Meter -Check                                   Elster          7
                           400/230/33kV ATR-3 Meter- Check                                   Elster          7
                                                           DC BUS 1                                         49
                                        Total
                                                           DC BUS 2                                         49
                                                           DC BUS 1                                         79
                                        Total
                                                           DC BUS 2                                         24
                                                           DC BUS 1                                         79
                                        Total
                                                           DC BUS 2                                         24
                                                           DC BUS 1                                         35
                                        Total
                                                           DC BUS 2                                         35
   8    Others
                                                                                                                        Fed from DC BUS 1 & 2
  8.1   Emergency Light Main Control Room + SPR1 + SPR2                                               120+120=120=360
                                                                                                                             (Change-over)
                                                           DC BUS 1
                                        Total
                                                           DC BUS 2
                                                                        Page 4 of 10
Design,Supply,Installation,Testing Commissioning of 400/230/33kV Aminbazar Grid Substation
AC LOAD CALCULATION
       2)AC load
                    (𝐶ℎ𝑎𝑟𝑔𝑒𝑟 𝐼𝑛𝑝𝑢𝑡 𝑙𝑜𝑎𝑑)/
            AC LOAD (𝐸𝑓𝑓𝑖𝑐𝑖𝑒𝑛𝑐𝑦
                      =         ×𝑃𝑜𝑤𝑒𝑟 𝐹𝑎𝑐𝑡𝑜𝑟)
                            =       38.824 kVA
       Here, Charger Input Current, I=              240
             Charger Input Voltage, V=              110
             Power Factor,      Cosθ=              0.85
             Efficiency,            ŋ=               0.8
       2)AC load
                    (𝐶ℎ𝑎𝑟𝑔𝑒𝑟 𝐼𝑛𝑝𝑢𝑡 𝑙𝑜𝑎𝑑)/
            AC LOAD (𝐸𝑓𝑓𝑖𝑐𝑖𝑒𝑛𝑐𝑦
                      =         ×𝑃𝑜𝑤𝑒𝑟 𝐹𝑎𝑐𝑡𝑜𝑟)
                            =       12.706 kVA
       Here, Charger Input Current, I=              180
             Charger Input Voltage, V=                48
             Power Factor,      Cosθ=              0.85
             Efficiency,            ŋ=               0.8
                                                                               Page 5 of 10
Design,Supply,Installation,Testing Commissioning of 400/230/33kV Aminbazar Grid Substation
Total 33787.4
Total 33787.4
Total 33787.4
                                                                                  Page 6 of 10
Design,Supply,Installation,Testing Commissioning of 400/230/33kV Aminbazar Grid Substation
         12 Sub-DCDB 1                                               1                                                                     104
            Space Heater                                             1       200               0.50                  1                     100
            Lamp                                                     1                   10               0.3                 0.85          4
                                                                               Page 7 of 10
Design,Supply,Installation,Testing Commissioning of 400/230/33kV Aminbazar Grid Substation
         13 Sub-DCDB 2                                               1                                                         104
            Space Heater                                             1       200               0.50            1               100
            Lamp                                                     1                   10             0.3          0.85       4
                                                                               Page 8 of 10
Design,Supply,Installation,Testing Commissioning of 400/230/33kV Aminbazar Grid Substation
       TOTAL                                                                                                                                      349176.6
           NOTE:             1) Fire pump & oil treatment equipment will not be operatedat the same time
         7    UPS                                                    1                                                                                 2809
              Equipments                                             1      2300                   1.00                    0.85                        2706
              Space Heater                                           1       200                   0.50                      1                          100
              Lamp                                                   1                   10                      0.3                  0.85               4
       TOTAL                                                                                                                                      212302.1
           NOTE:             1) Fire pump & oil treatment equipment will not be operatedat the same time
                                                                               Page 9 of 10
Design,Supply,Installation,Testing Commissioning of 400/230/33kV Aminbazar Grid Substation
TOTAL 561.47873176
= 510.44 KVA