0% found this document useful (0 votes)
113 views4 pages

Construction Material Quantities

The document provides a bill of quantities for construction work. It lists 13 items with descriptions of materials and dimensions. The items include excavation, concrete work, brickwork for walls, doors and windows, flooring, and other miscellaneous works. The quantities of each item are calculated based on the number of units and dimensions provided. The total quantities of various items and overall total are computed at the bottom.

Uploaded by

vishal yadav
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
113 views4 pages

Construction Material Quantities

The document provides a bill of quantities for construction work. It lists 13 items with descriptions of materials and dimensions. The items include excavation, concrete work, brickwork for walls, doors and windows, flooring, and other miscellaneous works. The quantities of each item are calculated based on the number of units and dimensions provided. The total quantities of various items and overall total are computed at the bottom.

Uploaded by

vishal yadav
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

SR .

NO ITEM DESCRIPTION UNIT NO L B H


1 EXCAVATION
1.A for Column m3 13 1.2 1.4 1.5
1.B for Plint wall m3 1 67.27 0.9 0.7

2 PCC
2.A for footing m3 13 1.2 1.4 0.15
2.B for wall m3 1 84.37 0.9 0.15

3 U.C.R
3.A for 1st step m3 1 73.77 0.6 0.4
3.B for 2 step
nd
m3 1 74.67 0.4 0.75

4 BACK FILLING m3 1

5 STUB COLUMN m3 13 0.3 0.45 1.35

6 GROUND FLOOR SLAB


Living Room m3 1 3.91 4.57 0.15
Bedroom 1 m 3
1 3.3 3.59 0.15
Bedroom 2 m 3
1 3.48 3.04 0.15
W/C m3 1 0.85 1.21 0.15
Bath m 3
1 2.32 1.21 0.15
Store m 3
1 2.08 1.21 0.15
Pooja m3 1 1.77 1.21 0.15
Dinning m3 1 2.99 2.13 0.15
Kitchen m 3
1 2.99 3.5 0.15

7 POINTING m3 1 43.78 1 0.45

8 BRICKWORK: GROUND FLOOR


8.A FOR 300MM WALL m3 1 52.87 0.3 2.85
DEDUCTION
1 DOOR(D) m3 1 1.2 0.3 2.1
2 WINDOWS
W 5 2 1.2 0.3
W1 4 0.6 0.3 0.6
W2 1 1.2 0.3 1.2
3 LINTEL
D 1 1.2 0.3 0.1
W 5 2 0.3 0.1
W1 4 0.6 0.3 0.1
W2 1 1.2 0.3 0.1
4 SILL
W 5 2 0.3 0.1
W1 4 0.6 0.3 0.1
W2 1 1.2 0.3 0.1

8.BFOR 150MM WALL 1 34.57 0.3 2.85


1 DOORS
D1 4 1 0.3 2.1
D2 5 0.9 0.3 2.1

2 LINTEL
D1 4 1 0.3 0.1
D2 5 0.9 0.3 0.1

BRICKWORK FIRST FLOOR


FOR 300MM WALL 1 29.26 0.3 2.85
DEDUCTION
DOORS
D1 2 1 0.3 2.1
WINDOWS
W 3 2 0.3 1.2
W1 2 0.6 0.3 1.2
LINTEL
D1 2 1 0.3 0.1
W 3 2 0.3 0.1
W1 2 0.6 0.3 0.1
SILL
W 3 1 0.3 0.1
W1 2 0.3 0.3 0.1

PARAPET 1 44.23 2.3 1

PLINTH BEAM 1 52.87 0.3 0.3

BLELOW STAIR CASE


QUANTITY TOTAL QUNATITY

32.76
42.3801 75.1401

3.276
11.38995 14.66595

17.7048
22.401 40.1058

2.36925

2.680305
1.77705
1.58688
0.154275
0.42108
0.37752
0.321255
0.955305
1.56975 9.84342
0
19.701

45.20385

0.756

3.6
0.432
0.432
0.036
0.3
0.072
0.036

0.3
0.072
0.036 39.128
0
29.55735

2.52
2.835

0.12
0.135 23.947

25.0173

1.26

2.16
0.432

0.06
0.18
0.036

0.09
0.018 20.781

101.729

4.7583