0% found this document useful (0 votes)
83 views5 pages

Telecom Maintenance Checklist

This document provides a statistical supplement on the TMG (IPTAX) exchange. It contains 12 sections that summarize key details about: 1) General exchange details including name, software version, and contact information. 2) Exchange equipment including capacity, streams, loading percentage, redundancy, connectivity, and status of modules. 3) Environmental indicators and frequency of temperature/humidity issues. 4) DSLAM details like ports, faults, downtime and alarm handling. 5) Earth measurements. 6) Fire safety arrangements. 7) Power plant configuration and load. 8) Battery details and maintenance. 9) Engine alternator capacity and maintenance.

Uploaded by

Rahul Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
83 views5 pages

Telecom Maintenance Checklist

This document provides a statistical supplement on the TMG (IPTAX) exchange. It contains 12 sections that summarize key details about: 1) General exchange details including name, software version, and contact information. 2) Exchange equipment including capacity, streams, loading percentage, redundancy, connectivity, and status of modules. 3) Environmental indicators and frequency of temperature/humidity issues. 4) DSLAM details like ports, faults, downtime and alarm handling. 5) Earth measurements. 6) Fire safety arrangements. 7) Power plant configuration and load. 8) Battery details and maintenance. 9) Engine alternator capacity and maintenance.

Uploaded by

Rahul Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Part – C: Statistical Supplement - TMG (IPTAX)

1.General Details
a) Station :
(i) Name of the TMG
b) (ii) SW Version
(query_mml_verinfo) :
c) Email ID of the Exchange In charge :
d) Designation of Inspecting Officer :
e) Date of last inspection :
f) Date of compliance on previous
inspection report :
2. Exchange Equipment
a) (i) Date of Commissioning
(ii) Equipped capacity of the TMG :
b) Total Working Streams : E1: STMs:
c) Percentage Loading :
d) Check Redundancy
(i) MAUIM/MSUIM :
(ii) MDTB/SDTB/SDTB2 :
(iii) Network Cards-VTCA (More than 1)
(iv)Synchronisation status
:
(v)Working of Both SMPS of Router :
(vi) Working of TMG 129 Server :
(Background Server) :
(vii) Check the TMG status whether in :
Manual or Auto mode :
(viii) Working of AV Alarm Panel

BNG+BNG:
Physical Connectivity to MPLS Net Work :
e)
BNG+PE:

PE+PE:

:
f)
Physical verification of link status in Router

g) Connected to SS (Main and DR) : MAIN:


DR:

h) :
(i)Availability of Mtce Documents
(ii) Availability of CDs (SQL,WIN2003 :
Server Edition)
i)
(i) Back Up (Weekly) :
(ii) Maintenance routines (Daily Alarms) :
(iii) PM by AMC Vendor (Every 6 Months) :

j) Privileges to access TMG :


Check the MML commands accessible by
the given privileges and Logging on to EMS
daily
:
k) (i) Status of Alarms (Critical/Major)
(ii) Alarm notification by SMS to :
incharge
l) Availability of Console Cable for Connecting :
Routers (RJ45-9 Pin - F Connector)
m) Availability of General Logbook :
n) Booking of Faults to ZTE and Details of :
Clearance
o) Any Frequent failure and Reason :
p) Faulty Cards/Module Repair Status :
q) Check frequent media failure (if any) :

r) Check any exchange failure due to media :

s) iCheck the transmission ring connectivity of :


the exchange

:
t) Temperature/Humidity

u) (i) Traffic - Check the following


BHCA: ASR:
:
BHCA(E): CCR:
(ii) Check Call Loss (At the EMS client,
access the Toolkit function and select :
Trace > Start tracing and then select
Call Lost View tab from the Config
Condition dialog box.)
(v) TMG MODULES/CARDS:
MDTB MSTDB MSTDB-2 MAUIM MSUIM MEUIM MCMP MOMP MVTCM

3. Environment Indicators - No. of times/month

a) Temperature out of limits/Duration :


b) Humidity out of limits /Duration :
c) Power failure / duration :
4. DSLAM

a) Note down the environment variables, :


temperature, humidity.

b) Status of ADSL ports :

Total ports

Total working ports


Total faulty ports

c) Total downtime during last one month :

d) Check for alarms, whether alarms are actually :


raised on a fault/check for fake alarms

e) Check whether EMS is being utilized by the in- :


charge.

5. EARTH
a) Earth value :
b) Date of last check :
c) Layout diagram :
d) Type of earth :
e) Has the earth resistance measured once in six :
months?
f) Whether common equipotential earth is :
provided?
g) Measurement of Tower Earth :

6. FIRE FIGHTING ARRANGEMENTS


a) Whether fire alarm is working on both AC :
supply & Battery backup?
b) Whether all smoke detectors are working :
according to Zones classified?
c) Whether adequate & suitable fire extinguishers :
are available?
d) :
Whether fire extinguishers are checked every
month and entered in the inspection / service
card?
e) Date of fire drill carried out :
f) Proper storage of diesel and other inflammable :
items
g) Whether air condition plant trips on fire :
detection in case of Package units?

7. POWER PLANT
a) Type :
b) Make :
c) Date of installation :
d) Configuration :
e) Working condition of Power modules :
f) Availability of Stage 1 (Lightening Arrester) :
g) Availability of Stage 2(Surge suppressor) :
h) Peak Load :
Is the power plant sufficient to take up the :
i) load?
j) Take sample check of alarms :
k) Maintenance of History sheet. :
l) Availability of Sufficient of spare fuses :

8. BATTERY
a) Make :
b) Type :
c) Capacity :
d) Quantity :
e) Date of commissioning :
General cleanliness of the battery & power
f) plant room. :
g) i) Are there frequent power failures :
ii)Is the battery able to take up the load during
the prolonged power failure?
h) Condition of the battery leads & fuses etc., :
i) Are there any sick cells? :
j) Whether readings are taken when exchange
load is on battery ? :
k) Are battery registers maintained properly? :
l) Are there any stores lying in the battery room? :
m) Check when the battery was last discharged :
and its efficiency
n) As emergency power supply from battery for :
lighting been provided in case of main supply
failure.
o) Is exhaust fan provided in the battery room and :
working properly?
p) Temperature compensation extended or not? :

9. ENGINE ALTERNATOR
a) Capacity :
b) Make :
c) Date of Installation :
d) RPM, Frequency, Ammeter & Voltmeter :
Is capacity sufficient to take Peak load & Load
e) of AC blower motors? :
f) Adequacy of diesel & arrangement for storage :
whether sufficient or not?
g) Are all maintenance schedule are carried out? :
h) Condition of startup battery :
i) Diesel consumption data availability :
j) Engine earthing :
k) Condition of radiator. :
l) Working condition of Engine Alternator :

10. MAIN POWER SUPPLY


a) Availability of separate feeder. :
b) Maximum Demand of EB supply :
c) Actual Consumption per Month (Units) :
d) Power factor value. :
11. AIR CONDITIONING PLANT
a) No. of Units :
b) Whether all AC units are in working condition? :
c) Type :
d) Make :
e) Capacity :
f) Date of commissioning :
g) Working condition of Annunciation panel in
case of Package AC plant :
h) Check whether maintenance schedule are being :
regularly and properly followed?
i) Working of fresh air fan. :
Working condition of Digital Thermo
j) Hygrometer in Switch Room :

12. CONCLUSION

Specific remarks highlighting the


important points requiring immediate
action : -

Place : (Signature of Inspecting Officer)


Designation
Date :