S&T Inspection Checklist
S&T Inspection Checklist
Station: Date:
                                3
9.    IPS Inverter 1 to Inverter 2 to CVT changeover
      and vice versa to be functional without fail.
      Inverter output voltage after changeover ------
10.   All the SMR and DC-DC converters to be in
      working condition. Load sharing for these
      should be checked. SMR on load rotation chart
      should be available.
11.   Spare transformers rotary switch is kept at
      OFF position and working properly. Fuses of
      the spare transformer is not defective. Staff
      counseling to check this during every AMC
      visit.
12.   Proper description of power supply bus bars,
      power supply rack, DC-DC converters,
      Inverters,   Transformers,     CVTs,   program
      switches, Discrete power supply equipments is
      available.
13.   Exhaust fans in power room working properly.
      Auto change over where provided should be
      working properly.
14.   All SPDs should be in working condition as per
      indications available. PF contacts of SPDs are
      taken in data logger.
15.   LT panel wiring diagram is available. Also,
      “manual changeover of supplies” chart is
      available inside LT panel.
16.   Hand gloves to be kept in the LT panel.
17.   Spare empty slots should be covered with
      dummy plates in the IPS.
18.   All the DPM of IPS must show exact voltages.
19.   Capacity of the fuse in the IPS SPD box and in
      the CLS panel.
20.   Earthing connections should be proper. Also,
      earth value & date of earth measurement to
      be written on earth bus bar.
21.   Power segregation is provided for Dual
      detection BPAC. The description of the bus bar
      should be proper.
22.   The power supply indication panel should
                                 4
    show proper voltage and frequency values.
    Description to be done on it.
23. The Neutral to Earth voltage (VN-E) should be
    checked. It should be less than 3 volts.
24. The auto change over system where provided
    should be working properly and its working
    should be monitored through datalogger.
25. No defective modules are present at site.
    Proper entry of any failure or defective
    modules along with time details to be kept.
26. DOI of the IPS battery should be painted
    properly.
27. DG testing is being done properly by taking on
    load whereas applicable. Any issue with DG.
28. Any released DG set available at the site?
    Working or not?
29. All the indications provided on CLS panel is
    working properly.
30. Auto changeover of supplies in CLS panel in
    working properly.
31. DG set battery 12V, 65AH is available and
    working properly.
Panel room
1.  Tag block covers are provided in the operating
    panel. Condition of tag blocks to be checked
    for any possible dry solders.
2.  VDU to VDU changeover or VDU to panel
    changeover is being done and register is
    maintained for the same. Periodicity of
    changeover………
3.  Block instruments are not due for POH. Last
    date of POH …….
4.  Panel NCR is working properly.
5.  SR buzzer is in working condition. Switch
    provided for acknowledging SR buzzer ??
6.  The emergency operation buttons which are
    supposed to be sealed (e.g., EUYN, EWN)
    should be in sealed condition.
                               5
7.    Panel testing (SIT) date to be painted on the
      Panel. Panel testing date must not be due. It is
      to be done every 5 years.
8.    Deficiencies noticed in the last panel testing
      are attended. Panel testing certificate is
      available at site.
9.    EUYN cancellation to be done with proper
      memo. Proper accountal of every EUYN
      cancellation to be kept.
10.   For every failure it should be ensured that
      proper procedure is being followed i.e., failure
      memo then DCM then after put right RCM.
11.   No SI remarks pending in the SFR register.
      Failure summary & classification of every
      month to be made. Overall summary to be
      pasted on the front side of SFR.
12.   Proper counter testing is being carried out
      every month as per schedule. Every time
      different gear should be tested instead of
      testing same gear.
13.   Block instruments to be double locked and
      sealed. Block opening with all possible
      combination of keys to be checked to ensure
      integrity of block instrument locking.
14.   Block filters negative terminals are painted
      with red color.
15.   All the phones, VHF, Voice logger if any etc. is
      working properly.
16.   CH box in the panel room to be sealed and
      locked. Description to be written on CH box
      properly.
17.   Fire alarm control panel is in working
      condition.
18.   Joint Point and Crossing register is maintained
      properly. All the noticed deficiencies of joint
      inspection are being attended timely. TWS
      joint inspection format to be followed for TWS
      points. Proper signature after inspection and
      compliance to be ensured.
                                 6
19.   SSD joint inspection is being done monthly
      and record is maintained in the JE/ESM room.
      Proper    signature    after   inspection   and
      compliance to be ensured.
20.   Joint track circuit & joint track bonding
      inspection are being done as per schedule and
      deficiencies are being attended in timely
      manner. Proper signature after inspection and
      compliance to be ensured.
21.   Block phone testing. Block phone in working
      condition. In case of LC gates, Gate phone is
      in working condition.
22.   ELD is working normal. ELD register is
      maintained and it is being monitored through
      data logger. Value of ELD in case of
      abnormality --------
23.   BY make ELD readings to be taken properly.
      Total/Positive/Negative/Leakage.        Leakage
      should be between 0-5 volts.
24.   BPAC dual detection indications are available
      on the VDU and panel.
25.   BPAC Reset box description should be proper.
      Indication and display of reset box are proper.
26.   Block instrument key to be taken only under
      disconnection and proper entry to be made.
      Maintenance card must be available in the
      Block instrument.
27.   System Fail Emergency operation in case of EI
      is being tested as per schedule.
28.   Codal life of block instrument and BPR is not
      completed. Date of mfg. of Block and BPR.
29.   Station description on Block instruments like
      station from…… and station to……. Should be
      available.
30.   A class Earthing is provided with Counter.
31.   Relay room opening register. Relay
      room opening summary to be made.
      More than 2 hours cases to be
                                 7
     mentioned separately in summary form.
Data logger
1.   Relay room door monitoring contact should be
     at no. 1 contact in datalogger. If not then
     same to be shifted and checked for SMS
     generation.
2.   Earthing connection of datalogger are proper
     and intact.
3.   Datalogger batteries are provided or not. If
     provided then battery on load to be checked
     by switching OFF Data logger DC-DC module.
     Take reading of all cells and record. Do not
     forget to switch ON the module. DOI of
     datalogger and battery should be painted.
4.   Configuration of data logger. No of DC-DC
     modules provided for Datalogger.
5.   NMDL software are updated one at site and
     test room. Simulation, reports, track off are
     correct as per SIP and working properly both
     at site and test room.
6.   Data logger validation record is available at
     the site and is jointly signed with data logger
     engineer. Date of last validation done. Both
     digital and analog contacts are validated.
7.   Data logger PC timing is matching with real
     time clock.
8.   Any recent modification/alteration done in
     yard layout. If so then it shall be updated in
     simulation of test room and at site.
9.   Daily exception report is being generated and
     saved with proper remarks.
10. Datalogger printer is working properly.
11. All the indications are available on the
     datalogger PC like SPD Failure, Power supply
     related indications, OC failure, VCOR/FCOR
     indication, Vital relay indications, Relay room
     open/Close etc.
12. Datalogger SMS are being generated for
                                8
    various faults like fire alarm, fuse alarm, ELD,
    Power supply failures etc.
Documents
                                  9
OFC/Telecom Room
1.   Telecom CT rack description is available and
     CT rack plan is also available.
2.   Joint testing of section Quad with Signal staff.
     Changeover testing of OFC and Quad used for
     BPAC media.
3.   Monitoring of SMPS power plant in datalogger.
     DOD is being taken properly. Record is
     maintained properly.
4.   DOI of Power plant battery set to be painted.
     Rotation chart of SMR to be made and pasted.
5.   Linker testing, Media changeover testing to be
     done jointly by Signal and Telecom monthly.
6.   PF contact of Linker and Quad cable ELD is
     taken in the datalogger. SMS are being
     generated for the same.
7.   Quad cable allocation chart should be
     available.
8.   Quad cable joint meggering report with
     Signalling staff should be available.
9.   Joint quad cable and OFC parameter testing to
     be carried as per schedule.
10. Earth value of the telecom Hut & Equipments
     …. Value of Earth to be painted along with DOI
     & DOT.
11. Console rack, COA rack and other equipment
     wiring must be properly laced.
12. Position of cable joints with proper chainage
     should be available.
13. EC socket testing is being done as per
     schedule.
Cables
1.   Cable armour earthing is done in locations and
     at CT racks.
2.   Cable meggering is being done as per
     prescribed schedule. Summary is made. Last
     meggering deficiencies are attended or
     pending.
                                10
3.    Tag on faulty conductors. Relay room to last
      location spare conductors’ identification and
      tags.
4.    ELD is provided to all the bus bars. Working of
      ELD and daily monitoring. Contact taken in
      datalogger.
5.    ELD Reference values are set as per the
      manual.
6.    Corresponding changes due to faulty cables
      are reflected in the CT rack plan, CT rack and
      cable meggering records.
Fire Extinguisher & Fire Alarm System
1.    The Fire Extinguishers (only CO2 type no DCP
      type) to be kept at each S&T installation as
      per latest HQ policy.
2.    The Fire extinguishers must not be due for
      refilling. The weight along with last date of
      weighing, due date of weighing and signature
      must be pasted on painted on it.
3.    All the sensors of fire alarm system must be in
      working condition. The fire alarm activation to
      be taken in Data logger from PF contacts
      provided in the fire alarm control panel.
4.    Fire alarm sensors numbering to be done and
      their testing is being carried out as per HQ
      guidelines. Sensors in relay room, panel room,
      power room, OFC room to be checked.
5.    Fire alarm testing register is maintained
      properly sensor wise.
6.    Smoke gun should be available for fire alarm
      testing.
7.    Quarterly joint fire audit is being carried out.
      Deficiency of the last audit is attended.
Tools & Safety items
1.    Proper insulated tools must be available so
      that these are suitable for use in RE area.
2.    Tools like Megger, Earth Tester, Clamp meter,
      Multimeter, TSR, Fire alarm testing kit,
                                 11
      Obstruction test gauge, Hydrometer etc.
      should be available.
      Note: Metallic measuring tap should be
      avoided for measurement in the RE area.
3.    Staff should be in proper uniform with safety
      jackets and safety shoes.
Outdoor
   1. Signals
                                 12
1.    All the indications on gate panel are available
      including gate boom closing, road signals.
2.    Gate phones are working properly.
3.    Boom lights (if available), road signals are
      functional. Hooter to be present on both side
      of the gate.
4.    Boom locking and approach locking are
      effective.
5.    Gate boom height when closed is in
      prescribed range. (0.8m to 1.0 m).
      Boom Height DN -
      Boom Height UP -
6.    Sliding boom testing is being done as per JPO.
7.    Sliding boom is provided with yellow
      retroreflective strips. Black band of the sliding
      boom may be provided with red retroreflective
      bands for better visibility.
8.    All Emergency signal put back switch are
      working properly and in sealed condition.
9.    Direct SB locking and CH Interlocking is
      provided.
10.   Retroreflective sheet is provided on Gate
      boom, stop board and Sliding boom.
11.   Solenoid locking (BLR) is in circuit or not.
12.   Boom dashing frequency.
13.   On sliding boom lock post, description for keys
      are written properly.
14.   Stand type stop board is available for Sliding
      boom.
15.   Limit switch contacts are made parallel.
16.   Gate pedestal and lock pedestal are locked
      properly.
17.   In case of traffic gate, the alteration in slot
      circuit as per HQ policy is carried out.
18.   In case of WSL gate, slot indications are
      working properly.
19.   GWR is available at the gate.
20.   In case of OSL gate, IPS room, relay room,
                                 13
      panel room and documents to be checked      as
      per the items mentioned in these heads.
21. Speed breakers and zebra painting             is
      available.
22. Last      panel   testing    date.    Date    of
      commissioning and panel testing to          be
      painted on the panel.
23. Proper description is written on the panel.
  3. Track circuits
                                15
      system is down and other is picked up.
      Resetting procedure when both BPAC are
      down. Private number is exchanged before
      resetting when both systems are down.
   5. Points
1.    In case of ordinary points, Clearance between
      leading stretcher bar and bottom of Rail 1.5 to
      5mm.
2.    For IRS point machine opening of Switches at
      toe show in mm LH/RH side (115mm +/-3mm)
      and for TWS point machine opening of
      Switches at toe show in mm LH/RH side
      (160mm +/-3mm)
3.    TWS point JOH Clearance is 60+/-3mm.
4.    Point Housing of sleepers from toe LH/RH side
5.    In TWS points, last date of SSD joint inspection
      by S&T and Engg. Gauge to be checked
      jointly.
6.    Engg deficiencies like out of square, creep,
      burr, drainage, poor ballast, floating, loose
      packing etc.
7.    Condition of point zone insulations.
8.    Condition of roddings, MS pins, play in the
      roddings etc.
9.    Point WJR timing is proper. WJR time-------
10. Description writing is available on the point
      machine, CH key insertion and on the ARA
      terminals inside the machine to be done.
11. The cross protection wiring at EI installation is
      done as per HQ policy.
12. Point maintenance diary is available and
      proper parameters like V, I, Opening, Housing,
      JOH clearance is being written.
13. If point is more than 1.1 km apart electrically
      from relay then 400 V ACI point motor to be
      used.
14. The obstruction voltage in TWS point is not
      dropping drastically.
                                 16
15.    SSD is working properly. Insulated arm type
       SSD is provided.
16. RDSO guidelines for TWS like Metallic liners,
       MK-V pendrol clip, Tie bars, Inverted C tie bar
       between 3rd and 4th sleepers are provided.
17. If the point operation conductors are made
       parallel then they should be made parallel in
       each location.
18. If difference between obstruction current and
       normal current is less than 0.5 Amp then
       friction clutch to be replaced.
19. Nominated TWS points parameters being
       taken in every 15 days.
   6. Location Boxes
1.     Description writing work inside the location
       and nomenclature (location no & gear nos.) of
       location box to be done.
2.     Earthing connections should be intact and
       continuity to be checked.
3.     Earth pit and enclosure should be provided for
       earth. The value of earth along with DOI and
       DOT to be painted.
4.     Condition of location foundation is good.
       Proper sand filling and plastering should be
       done.
5.     Cable armour earthing and soldering is
       proper.
6.     Location light if available should be working
       properly.
On duty ESM room/JE/MT room
1.     Datalogger, MT PC are working properly.
2.     Spares in the relay room, if kept, should be
       properly in arranged way. List of spares is
       made and pasted at appropriate place in the
       relay room.
3.     In case of EI, OC wise yard segregation to be
       pasted in different colour practice.
4.     BPAC dual detection indications are available
                                 17
     on the MT and Datalogger.
5.   NMDL software are updated one at site and
     test room. Simulation are correct as per SIP
     and working properly both at site and test
     room.
6.   Data logger PC timing is matching with real
     time clock. EI timing is in synchronization with
     datalogger timing.
7.   Any recent modification/alteration done in
     yard layout. If so then it shall be updated in
     simulation of test room and at site.
                                18
     disposal to be done for released material.
6.   If any running lobby is there then no remarks
     should be pending for the complaints related
     to S&T.
19