Annexure-9 RSU Format

Uploaded by

VINAY TANWAR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
66 views5 pages

Annexure-9 RSU Format

Uploaded by

VINAY TANWAR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Performa for Inspection of RSU Exchange

Inspected By : Date of Inspection :

Part – C: Statistical Supplement (Refer: TIFG-123)

1. Exchange General Details


a) Station :
b) Name of the RSU :
c) Parented MSU :
d) Email ID of the Exchange In charge :
SDE
e) Designation of Inspecting Officer :
f) Date of last inspection :
g) Date of compliance on previous inspection :
report
2. Exchange Equipment
a) Type & Date of installation :
b) Equipped capacity of the exchange :
c) No. of working connections (DELs) :
d) Percentage Loading of Exchange :
e) All racks to check that all lamps that are :
normally lit are actually lit
f) Check frequent media failure (if any) :
g) Check any exchange failure due to media :
h) Check the transmission ring connectivity of :
the exchange
3. Implementation of SMS based Alert system :
4. Environment Indicators - No. of times/month
a) Temperature out of limits/Duration :
b) Humidity out of limits /Duration :
c) Power failure / duration :

5. DSLAM
a) Note down the environment variables, :
temperature, humidity.
b) Status of ADSL ports :
Total ports
Total working ports
Total faulty ports
c) Total downtime during last one month :
d) Check for alarms, whether alarms are :
actually raised on a fault/check for fake
alarms
e) Check whether EMS is being utilized by the :
in-charge.

6. MDF
a) Check for proper position of GD tubes :
b) All verticals are earthed. :
c) Whether loose jumpers/Cables removed :
d) Incoming cables are earthed :
e) Cable inlets are sealed :
f) Wedging of spare numbers :
g) Joints in jumpers :
h) Removing jumpers/connectivity for :
unused/disconnected Broadband connection
in DSLAM
7. EARTH
a) Earth value :
b) Date of last check :
c) Layout diagram :
d) Type of earth :
e) Has the earth resistance measured once in six :
months?
f) Whether common equipotential earth is :
provided?
g) Measurement of Tower Earth :
8. FIRE FIGHTING ARRANGEMENTS
a) Whether fire alarm is working on both AC :
supply & Battery backup?
b) Whether all smoke detectors are working :
according to Zones classified?
c) Whether adequate & suitable fire :
extinguishers are available?
d) Whether fire extinguishers are checked every :
month and entered in the inspection / service
card?
e) Date of fire drill carried out :
f) Proper storage of diesel and other :
inflammable items
g) Whether air condition plant trips on fire :
detection in case of Package units?
9. POWER PLANT
a) Type :
b) Make :
c) Date of installation :
d) Configuration :
e) Working condition of Power modules :
f) Availability of Stage 1 (Lightening Arrester) :
g) Availability of Stage 2(Surge suppressor) :
h) Peak Load :
i) Is the power plant sufficient to take up the :
load?
j) Take sample check of alarms :
k) Maintenance of History sheet. :
l) Availability of Sufficient of spare fuses :
10. BATTERY
a) Make :
b) Type :
c) Capacity :
d) Quantity :
e) Date of commissioning :
f) General cleanliness of the battery & power :
plant room.
g) i) Are there frequent power failures :
ii)Is the battery able to take up the load
during
the prolonged power failure?
h) Condition of the battery leads & fuses etc., :
i) Are there any sick cells? :
j) Whether readings are taken when exchange :
load is on battery?
k) Are battery registers maintained properly? :
l) Are there any stores lying in the battery :
room?
m) Date of Monthly Partial Test Discharge on :
VRLA Battery
n) Is emergency power supply from battery for :
lighting been provided in case of main supply
failure.
o) Is exhaust fan provided in the battery room :
and working properly?
p) Temperature compensation extended or not? :
11. ENGINE ALTERNATOR
a) Capacity :
b) Make :
c) Date of Installation :
d) RPM, Frequency, Ammeter & Voltmeter :
e) Is capacity sufficient to take Peak load & Load :
of AC blower motors?
f) Adequacy of diesel & arrangement for storage :
whether sufficient or not?
g) Are all maintenance schedule are carried out? :
h) Condition of startup battery :
i) Diesel consumption data availability :
j) Engine earthing :
k) Condition of radiator. :
l) Working condition of Engine Alternator :
12. MAIN POWER SUPPLY
a) Availability of separate feeder. :
b) Maximum Demand of EB supply :
c) Actual Consumption per Month (Units) :
d) Power factor value. :
13. AIR CONDITIONING PLANT
a) No. of Units :
b) Whether all AC units are in working :
condition?
c) Type :
d) Make :
e) Capacity :
f) Date of commissioning :
g) Working condition of Annunciation panel in :
case of Package AC plant
h) Check whether maintenance schedule are :
being regularly and properly followed?
i) Working of fresh air fan. :
j) Working condition of Digital Thermo :
Hygrometer in Switch Room
14. CONCLUSION
Specific remarks highlighting the important : Nil
points requiring immediate action
(Signature of Inspecting Officer)
Place : Designation
Date :