Performa for Inspection of RSU Exchange
Inspected By    :                                   Date of Inspection   :
                     Part – C: Statistical Supplement (Refer: TIFG-123)
1. Exchange General Details
 a)   Station                                             :
 b)   Name of the RSU                                     :
 c)   Parented MSU                                        :
 d)   Email ID of the Exchange In charge                  :
      SDE
 e)   Designation of Inspecting Officer                   :
 f)   Date of last inspection                             :
 g)  Date of compliance on previous inspection            :
     report
2. Exchange Equipment
 a)   Type & Date of installation                         :
 b)   Equipped capacity of the exchange                   :
 c)   No. of working connections (DELs)                   :
 d)   Percentage Loading of Exchange                      :
 e)   All racks to check that all lamps that are          :
      normally lit are actually lit
 f)   Check frequent media failure (if any)               :
 g)   Check any exchange failure due to media             :
 h)   Check the transmission ring connectivity of         :
      the exchange
3.    Implementation of SMS based Alert system               :
4.    Environment Indicators - No. of times/month
a)    Temperature out of limits/Duration                     :
b)    Humidity out of limits /Duration                       :
c)    Power failure / duration                               :
5. DSLAM
 a) Note down the environment variables,                 :
     temperature, humidity.
 b) Status of ADSL ports                                 :
     Total ports
     Total working ports
     Total faulty ports
 c)   Total downtime during last one month               :
 d)   Check for alarms, whether alarms are            :
      actually raised on a fault/check for fake
      alarms
 e)   Check whether EMS is being utilized by the      :
      in-charge.
6. MDF
a) Check for proper position of GD tubes              :
b)    All verticals are earthed.                      :
c)    Whether loose jumpers/Cables removed            :
d)    Incoming cables are earthed                     :
e)    Cable inlets are sealed                         :
f)    Wedging of spare numbers                        :
g)    Joints in jumpers                               :
h)   Removing jumpers/connectivity for                :
     unused/disconnected Broadband connection
     in DSLAM
7. EARTH
a) Earth value                                        :
b)    Date of last check                              :
c)    Layout diagram                                  :
d)    Type of earth                                   :
e)    Has the earth resistance measured once in six   :
      months?
f)    Whether common equipotential earth is           :
      provided?
g)    Measurement of Tower Earth                      :
8. FIRE FIGHTING ARRANGEMENTS
a) Whether fire alarm is working on both AC           :
     supply & Battery backup?
b) Whether all smoke detectors are working            :
     according to Zones classified?
c) Whether adequate & suitable fire                   :
     extinguishers are available?
d) Whether fire extinguishers are checked every       :
     month and entered in the inspection / service
     card?
e) Date of fire drill carried out                     :
f)   Proper storage of diesel and other               :
     inflammable items
g) Whether air condition plant trips on fire          :
     detection in case of Package units?
9. POWER PLANT
a)   Type                                            :
b)   Make                                            :
c)   Date of installation                            :
d)   Configuration                                   :
e)   Working condition of Power modules              :
f)   Availability of Stage 1 (Lightening Arrester)   :
g)   Availability of Stage 2(Surge suppressor)       :
h)   Peak Load                                       :
i)   Is the power plant sufficient to take up the    :
     load?
j)   Take sample check of alarms                     :
k)   Maintenance of History sheet.                   :
l)   Availability of Sufficient of spare fuses       :
10. BATTERY
a) Make                                              :
b)   Type                                            :
c)   Capacity                                        :
d)   Quantity                                        :
e)   Date of commissioning                           :
f)   General cleanliness of the battery & power      :
     plant room.
g)   i) Are there frequent power failures            :
     ii)Is the battery able to take up the load
     during
         the prolonged power failure?
h)   Condition of the battery leads & fuses etc.,    :
i)   Are there any sick cells?                       :
j)   Whether readings are taken when exchange        :
     load is on battery?
k)   Are battery registers maintained properly?      :
l)   Are there any stores lying in the battery       :
     room?
m)   Date of Monthly Partial Test Discharge on       :
     VRLA Battery
n)   Is emergency power supply from battery for      :
     lighting been provided in case of main supply
     failure.
o)   Is exhaust fan provided in the battery room     :
     and working properly?
p)   Temperature compensation extended or not?       :
11. ENGINE ALTERNATOR
a) Capacity                                              :
b)     Make                                              :
c)     Date of Installation                              :
d)     RPM, Frequency, Ammeter & Voltmeter               :
e)     Is capacity sufficient to take Peak load & Load   :
       of AC blower motors?
f)     Adequacy of diesel & arrangement for storage      :
       whether sufficient or not?
g)     Are all maintenance schedule are carried out?     :
h)     Condition of startup battery                      :
i)     Diesel consumption data availability              :
j)     Engine earthing                                   :
k)     Condition of radiator.                            :
l)     Working condition of Engine Alternator            :
12. MAIN POWER SUPPLY
a) Availability of separate feeder.                      :
b)     Maximum Demand of EB supply                       :
c)     Actual Consumption per Month (Units)              :
d)     Power factor value.                               :
13. AIR CONDITIONING PLANT
a) No. of Units                                          :
b)     Whether all AC units are in working               :
       condition?
c)     Type                                              :
d)     Make                                              :
e)     Capacity                                          :
f)     Date of commissioning                             :
g)     Working condition of Annunciation panel in        :
       case of Package AC plant
h)     Check whether maintenance schedule are            :
       being regularly and properly followed?
i)     Working of fresh air fan.                         :
j)     Working condition of Digital Thermo               :
       Hygrometer in Switch Room
14.   CONCLUSION
       Specific remarks highlighting the important       :   Nil
       points requiring immediate action
            (Signature of Inspecting Officer)
Place   :             Designation
Date    :