ENERGYPAC POWER GENERATION LTD.
SGFL 4000BPD CFP Project
DAILY SAFETY CHECKLIST
Date :
Company :
SL DESCRIPTION YES NO N/A REMARKS
1 Person on Board (POB) POB=
2 Designated gate for entry/exit for all personnel,
equipment and materials
3 Security checked completed and passed
4 Have all employees participated in the daily toolbox
meeting? If NO. Give the numbers and reasons.
5 Do the employees have Site safety orientation?
6 Do the employees know the location of assembly
and evacuation point?
7 Are the assembly and evacuation points identified?
8 Does the employer provided details of contact
persons in case of emergency?
9 First aid provider and first aid box available?
10 Shelter for workforce (Rest, lunch, protection from
rain etc.)
11 Adequate drinking water
12 Clean toilet facility Frequency =
13 Designated smoking zone and container provided
for placing extinguished cigarettes
14 Proper PPE as per job requirement
15 Waste bins provided and wastes are well segregated
16 Hazard reporting (BBS Observation) in place
17 Are materials storage areas well organized
(Housekeeping, barricading, signage, labeling etc.)?
To be completed by company representative and submitted to EPGL’s Safety Representative within 09:30 am.
Completed by
Name Designation Signature