5S Checklist 4 Maintenance

This document contains a 5S audit checklist for a maintenance plant/area. It lists 15 audit points related to organizing, standardizing, and cleaning the work environment based on 5S principles. For each point, it records the permissible quantity, audit observations, and scoring on a scale of 1 to 3 "S". The total score is calculated out of 30 and ratings are provided for levels of implementing the 4 "S" principles. Special remarks and closure details are included for any non-conforming audit findings.

Uploaded by

Jeji Hirbora
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views2 pages

5S Checklist 4 Maintenance

This document contains a 5S audit checklist for a maintenance plant/area. It lists 15 audit points related to organizing, standardizing, and cleaning the work environment based on 5S principles. For each point, it records the permissible quantity, audit observations, and scoring on a scale of 1 to 3 "S". The total score is calculated out of 30 and ratings are provided for levels of implementing the 4 "S" principles. Special remarks and closure details are included for any non-conforming audit findings.

Uploaded by

Jeji Hirbora
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

NAME OF COMPANY - 5S Audit Checklist

DATE:
PLANT / AREA : MAINTENANCE
AUDITOR :
Leader : Dy. Leader : Auditee :
Score Total Action Resp. Closure
Sr
.N Audit Check Point Permissible Qty. Audit Observation 1 2 3 Out of 4 "S" Out Out Taken and Sign.
o. "S" "S" "S" 30 1 "S" 2 "S" 3 "S" of 30 of 60 Y/N Date

No unwanted material lynig in the


1 No unwanted material
workshop/Control rooms.

2 All material available in dept is identified. Material identified.

Entire working area are Specified &


3 Area Specified & Identified.
identified or not.

Scrap area specified and identified or Scrap area specified &


4
not. identified.

Enitre area without cotton


5 Entire area is neat & clean . waste, oil, grease, dust ,
pieces of metals,etc.

Area for Tools and other Material are is


6 Area is specified
specified or not

Qty. of Material/Waste Specified &


7 Qty. Specified & Identified.
Identified or not

Cable standerd size is attached with alls


8 Attached cable size
cable (Area is specified or not)

9 Cable area is clean without any materials Clean area

Area for OK/Ready to use material is


10 Area is specified
specified or not.

Area for OK/Ready to use material is


11 Area is specified
Identified or not.

All spaners are in cupboard &


12 Spaners are at specified location or not
kept separate with size

Page No.: of 1
NAME OF COMPANY - 5S Audit Checklist
DATE:
PLANT / AREA : MAINTENANCE
AUDITOR :
Leader : Dy. Leader : Auditee :
Score Total Action Resp. Closure
Sr
.N Audit Check Point Permissible Qty. Audit Observation 1 2 3 Out of 4 "S" Out Out Taken and Sign.
o. "S" "S" "S" 30 1 "S" 2 "S" 3 "S" of 30 of 60 Y/N Date

Area for worker's cloth/Lunchbox should Location is specified &


be Speficified & identified or not Identified

Location for daily reports should be Location is specified &


13
Specified & identified or not. Identified

Required documents should be displayed Documents are displayed on


14
& updated. notice board

W. I. for cleaning method and frquency


15 Display of W. I.
to be displayed at different work centres.

TOTAL MARKS
0-2 1S #REF! Special Remarks if any
Individual performance
3-4 2S #REF!
Rating

5-6 3S #REF! %
7-8
as per all 4 "S" 4S #REF!
9 - 10 TOTAL #REF!