Machine Checklist
Machine : DCS Dust Collector Motor Unit                                                                                                                         Month :
                    Department                                                         LINE                                                     EQUIPMENT NAME                                  EQUIPMENT NO.                       Prepared By                       Checked By                         Noted By
                    Production                                                       Polishing                                                 DCS Dust Colletor
                                                                                                                                                                                                                                    TECHNICIAN                   DEPARTMENT HEAD                  OPERATIONS MANAGER
                                                                                                                      PIC
  Motor       No.            Control Items                      Checkpoint                       Specs.                          Frequency       1   2    3      4      5       6      7       8       9   10   11   12   13   14    15   16      17   18   19   20    21   22     23   24   25   26    27   28   29   30   31
   Unit                                                                                                          Prodn. Eng'g.
               1                 Motor                Unwanted Smell, Sounds & Heat           Not Allowed                   MT
               2              Motor Body                 Chips / Foreign Materials            Not Allowed                   MT     DAILY
                                                                                                                                  (Before
                                                                                                                                  Start of
               4          Motor Name Plate              Detach and Scratches Plate            Not Allowed                   MT   Operation)
 EXTERNAL      5           Fan Blade Cover             Damage Cover, Dirt and Loose           Not Allowed                   MT
   AREA                                                          Bolt
               6     Air Ducting Bolts 104pcs            Damage and Loose Bolts               Not Allowed                   MT
                          (After Suction Fan Blade)
                     Air Ducting Bolts 104pcs
                                                                                                                                  EVERY 2
               7            (Before Suction Fan          Damage and Loose Bolts               Not Allowed                   MT     WEEKS
                                 Blade)                                                                                          (Saturday at
                                                                                                                                   3:45pm)
               8       Motor Frame Bolts 10pcs           Damage and Loose Bolts               Not Allowed                   MT
               11      Motor Suction Fan Blade        Dirt or Wax, Damage Blade and           Not Allowed                   MT
                                                              Stuck-up rotation
               12           Rear Fan Blade             Dirt, Damage Blade and Stuck-          Not Allowed                   MT
                                                                up rotation
                                                      Loose Bolt, Open Stranded Wire
               13         Wiring Connection               and Wire Discoloration              Not Allowed                   MT
                                                                                                            L1                     EVERY 2
 INTERNAL                                                                                                                           WEEKS
   AREA        14           Electrical Load                       Voltage                 230 ± 10 V        L2              MT    (Friday at
                                                                                                                                   3:45pm)
                                                                                                            L3
                                                                                                            L1
               15           Electrical Load                       Current                     60 ± 5 A      L2              MT
                                                                                                            L3
                                                                                         Not Allowed
               16           Motor Bearing             Unwanted Sounds and Vibration                                         MT
                                                                                       (Manual Greasing)
                                                       Maintenance Technician (MT)
                                                               Supervisor (SV)
1. Put the following checking:
 LEGEND:                                                                                                                                                                                                    REMARKS:
                                   O                  - Ok
                                   X                  - No Good (Report immediately to Immediate Superior regarding the condition of Machine.)
                                                      - For Repair / Adjustment (Report immediately to Immediate Superior regarding the condition of Machine.)
2. Daily check all the required checkpoints prior to mass production.
3. Submit this checklist to Manager after the checking of Supervisor once completely filled-up in a monthly basis.
4. If in doubt during checking, call the attention of Superior or Dept. Head and write down on the remarks the problem occur and action taken or provide necessary action if not yet been done.
                                                                                                                                                           ISO 9001:2008 ref. clause: 6.3 Infrastructure
                                                                                                                                                                                                                                                                                                       TPPPC-PEN-F040 Rev. 3