EPC -3 Gasoline package
DAELIM CO.
JOB SAFETY ANALYSIS
JSA Title: CHIPPING AND PADDING OF FOUNDATIONS JSA Control No: RCL-JSA-012 DEPARTMENT : CHIPPING PADDING
Location : EPC-3 Sulfur Area Revision Date: July 2013
Task Description
Work Description Hazards Identified Preventive Measures
Obstruction Secure approved permit and initiate Tool box talk prior to work.
Preparation of work area Slip/trip Housekeeping before, during and after work completion
Elevation check; mark portion of Pinch point/crush Designated surveyor do elevation checking
Foundation to be chipped Dust/ foreign body Use proper PPE's & face shield during chipping
Prepare chipping tools
On eyes Use of respiratory protection ( dust mask or half face piece respirator)
Commence chipping
Chipping hammer grinding machine & other Power tools must be inspected
Prepare pads & grouting materials
(color coded)
Commence padding & grouting
QC inspection as coordinated Provide fully charged fire extinguisher.
Rectification as required Ensures safe access & platforms
Final QC inspection Proper barricade and signage of work area
Work is properly supervised & with safety coverage.
Approved By:
Signature
In- charge of the work