S/N   Unit: Electrical            Type and details of Maintenance   Frequency      Last Date of      Current Status
[Inspected criteria]        Action taken                                     Operation
1     Main Building offices       Routine inspection.               Weekly         4th Dec., 2023    -In order
      [13A wall sockets, light                                                                       -Kitchen fluorescent bulb needs
      switches, bulbs]                                                                               replacement. LED bulb unavailable in
                                                                                                     the local market.
2     Annex Building              Routine inspection.               Weekly         4th Dec., 2023    -Toilet bulb in Security Post 1 (Whisky
      [13A wall sockets, light                                                                       beat) bad.
      switches, bulbs]                                                                               Upstairs in order.
2     Production Hall             Routine inspection.               Weekly         4th Dec., 2023    16A & 32A sockets in order.
      [-16A & 32A wall sockets,                                                                      Two 250W LED bulbs in Production
      switches, bulbs,                                                                               Hall bad.
      Distribution Boards]                                                                           -No switches in Production Hall.
                                                                                                     Quotation being updated.
3     Paper Store, Shredder       Routine inspection.               Weekly         4th Dec., 2023    In order. One 250W bulb taken out to
      room                                                                                           replace at Production Hall.
      [wall sockets, bulbs]
4     Loading Bay                 Routine inspection.               Weekly         4th Dec., 2023    In order.
      [Filament bulbs]
5     Toilets                     Routine inspection.               Weekly         4th Dec., 2023    Female toilet single bulb bad.
      [Bulbs & switches]
6     Switch Room                 Routine inspection.               Weekly         4th Dec., 2023    -Panels and breakers in order.
      [-Bulbs, breakers                                                                              -Phase monitoring device in FP1 (A74
      Distribution Boards]                                                                           machine) faulty.
7     Alpha (Security) Post       Routine inspection                Weekly         4th Dec., 2023    In order.
      [13A sockets & switches]
8     Security lights at Main     Routine inspection                Periodically   29th Nov., 2023   50W LED lamp mounted on Gen.
      Building & Annex                                                                               House facing car park bad.
      [Leakages from roof]                                                                           -60W LED lamp mounted on Main
                                                                                                     Building facing car park bad.
                                                                                                     -100W lamp at Annex bad.