0% found this document useful (0 votes)
36 views2 pages

ELECTRICAL TECH BLDGdocx

Electrical Tech Bldg lesson

Uploaded by

Cian Talavera
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views2 pages

ELECTRICAL TECH BLDGdocx

Electrical Tech Bldg lesson

Uploaded by

Cian Talavera
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

LOT________ BUILDING____________________ ROOM NO.

____________ SPECIAL AREA________________________________


i
INSPECTOR__________________________________________ SECTION _________________________ DATE________________________

INSPECTION CHECK LIST ELECTRICAL TECH BLDG Page 1


ITEM DESCRIPTION YES NO N/A COMMENTS
1 FIRST AID KIT, installed prominently INSTALLED IN COMMON AREAS AND PERIODICALLY CHECK
2 FIRE EXTINGUESHER , Inspected and Recharge Installed near the door with status color
EXPIRY Date with card Occupant is trained to use Fire Exh.
TYPE ( A, B C, ABC, K) Monthly Tape color is updated and log book entry
PRESSURE Gauge Reading
3 Fire Alarm System and Firefighting Equipment
Fire Sand in a Bucket If no available Fire Exh. And other Firefighting Euipt.
4 POWER SUPPLY AND OUTLET with Grounding (UL Listed )
Extension Cord not shared If possible UL listed and appropriate Ampere Rating
Not installed in Traffic, under the carpet
No loose wiring
Ground Prongs not removed from 3 way
5 PANEL BOARD with CB , Inspected and clean periodically With Labeling outside panel and schedule of circuits
Ground Fault interrupters should work correctly Inside the Cover
Terminal Connection are tightened Ampere check if possible and reading recorded in a Log Book
Main Panel have locking point In case there is a work in the Building, power to shut off
6 LIGHTS, Power Saving Type Standard Lumen Measured on Working Area
Emergency Lights and Exit Signage Activated during brown out
7 AIRCONDITIONING, Scheduled Servicing Servicing during no office work
Indoor Unit Filter and Condensate Drain cleaned as well Aluminum Fins
Outdoor Unit Condensing Fins to be wash and Electrical Box Air Dried
Isolation Panel or Switch Air Dried Clean and Check Rain Rubber Isolator
8 TOILET AND WASH, Daily cleaning Acid and Disinfectant to be stored properly and locked
Acid Wash every week and application of Disinfectant
Exhaust Fan installed and service periodically

ZPPSU SAFETY ENGINEERING SAFETY AUDIT Page 1


LOT________ BUILDING____________________ ROOM NO.____________ SPECIAL AREA________________________________
i
INSPECTOR__________________________________________ SECTION _________________________ DATE________________________
INSPECTION CHECK LIST Electrical Tech Bldg. Page 2
ITEM DESCRIPTION YES NO N/A COMMENTS
GARBAGE DISPOSSAL - Garbage can properly labeled Garbage Bin Color coding: Black – Non biodegradable
9 Room Garbage – 5 gallons capacity Blue – Recyclable; Green – Biodegradable; Red – Infectious
Bldg. outside with 3 or four x 120 ltrs Waste, Yellow – Hazardous Waste, Orange – Food Waste
Busted Fluorescent Bulb disposed off properly And other type of Electrical lightings
10 DOOR MOP, due to dusty road in going inside the offc Rubberized mop made from second hand Tires
WORKSHOP:
Floor should be clear from grease and oil The floor is thickening by the combination of dust and oil or
Should be installed with Fire Alarm system and Fire Grease and should be scrap to the surface.
Fighting system due to use of gasoline in the flooring
Exhaust Fan to be installed at the side above 4 meters
Above flooring.

ZPPSU SAFETY ENGINEERING SAFETY AUDIT Page 2

You might also like