Construction Cost Calculator
Detail         Length    Width       Qty            Unit                                 Sr.No.         Material       Rate     Remark         Floor Consider
   Size of Plot       74          27       4230          Sq. ft                                  1      Cement (Bags)        500
                                                                                                 2      Steel (Kg)            70
    Rate per                                                                                     3      Sand (Cu.ft.)         60
                           1450                          Sq. ft.
Construction Rate                                                                                4      Gravel (Cu. ft.)      45
                                                                                                 5      Bricks (Nos.)        8.5
      Floor                            G.F.+ 1                                                   6      Tiles (Sq. ft.)       65
                              OK                                                                 7      Color (Liters)       212
                           Building Construction Cost                                                              Building Construction Materials
     Sr. No.                  (Material)                   %               Amount              Sr.No.         Material       Qty        Rate            Amount
        1           Cement                                     12.23        7,50,000.00          1      Cement in Bags       1500        500               7,50,000.00
        2           Steel                                       4.57        2,80,000.00          2      Steel in Kg          4000         70               2,80,000.00
        3           Sand                                        3.91        2,40,000.00          3      Sand in Cu.ft.      4000          60               2,40,000.00
        4           Gravel                                      2.20        1,35,000.00          4      Gravel in Cu. ft.   3000          45               1,35,000.00
                    Bricks                                                                       5      Bricks in Nos.      50000        8.5               4,25,000.00
        5           Color                                      13.96        8,56,000.00          6      Tiles in Sq. ft.    5000          65               3,25,000.00
                    Tiles                                                                        7      Color in Liters      500         212               1,06,000.00
                    Finishing                                                                                                       Total Cost          ₹ 22,61,000.00
                    Sanitary
                    Plumbing
                    Doors
        6                                                      20.00       12,26,700.00
                    Windows
                    Fittings
                    Electrical
A= (1+2+3+4+5+6)             Material Cost                     56.86        34,87,700.00
        B                    Labour Cost                       25.52        15,65,100.00
        C                 Engineers/architect                  17.62        10,80,700.00
    D =A+B+C                   Total Construction Cost                  ₹ 61,33,500.00