CONCRETE CUTTING CHECKLIST
PROJECT NAME: GE, CHAKAN, PUNE
INSPECTED BY: DATE:
SL NO CHECK POINTS YES NO
FLOOR SAW
1 Shaft nut secure
2 Belt tensioned and undamaged
3 Adequate water and waterways clear
4 Flaps in place
5 Guards in place
HAND HELD SAW
6 Belts tensioned and undamaged
7 Flange locking nut secure
8 Water supply adequate
9 Guards in place
WALL SAW
10 Tracks securely fastened
11 Blade secured
12 Job wedged/securely supported
WIRE SAW
13 Pulleys secure
14 Hydraulic pressure correct
DRILLS
15 Electric switch, plug and lead safe
16 Water collar operable
17 Carriage clamp and shims operable
BLADE AND BITS
18 No undercutting evident
19 Blades free of cracks & deterioration
20 Blade is right size and type for the machine
21 All segments secure
ELECTRICAL LEADS
22 Plugs in good condition
23 Outer casing intact Correctly tagged
24 GFCIs fitted
EHS MANAGER EXECUTION INCHARGE